1 BCD/ACD developments for Cavities Several improvements are needed on both BCD/ACD A significant amount of R&D work is needed to resolve issues –Quality.

Slides:



Advertisements
Similar presentations
T. Saeki (KEK) 15 May 2014 AWLC2014 at FNAL
Advertisements

SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Cavity-Coupler Treatment & Testing Preparation of crab cavities for KEKB RF aging of input couplers. 17 th September 2009, LHC-CC09 at CERN K.Nakanishi.
Series Tests of High Gradient Single- cell Superconducting Cavity for the Establishment of KEK Recipe T. Saeki (1), F. Furuta (1), K. Saito (1), M. Ge.
Cavity package T.Saeki BCD meeting 20 Dec Cavity shape BCD: TESLA shape Pros: small wakefield, HOM thoroughly investigated single-cell: 43 MV/m.
ILC PM Meeting S0 Webex Global Design Effort 1 S0/S1 Next Steps Lutz Lilje GDE.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Americas S0 Plan in USA Shekhar Mishra Fermilab/GDE US Main Linac Cavity and Cryomodule WBS.
Status of crab crossing studies Presented by NAKANISHI Kota (KEK) 2008/1/25.
Needs of a European SCRF Facility - the BIG plan Lutz Lilje DESY -MPY- DESY 11/2006 Planning Resource needs.
Mechanical Issues SPL cavities/cryomodules Workshop CERN 30 Sep. 2009
Cavity Productions at DESY DESY -MPY- FNAL Overview on the cavity productions Review of cavity performance Some conclusions.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
CAVITY TREATMENT (BCP, HEAT TREATMENT & HPR) Sergio Calatroni with many contributions from: Rama Calaga, Leonel Ferreira, Antonio Mongelluzzo LHC CCEM,
Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
TTC Meeting, Frascati, 5-7 December Summary of EP discussions at Oct SMTF meeting at FNAL T. Tajima (LANL), C. Boffo (FNAL)
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
Update on S0, S1 for ILC R&D H. Padamsee, Cornell For the S0/S1 Task Force.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
SPS D OUBLE -Q UARTER W AVE C RAB C AVITIES D ISCUSSION ON CAVITY PREPARATION PROCEDURES CERN, 28 October 2015 Silvia Verdú-Andrés, Toohig fellow at BNL.
Dec , 2005TTC Meeting, Frascati1 Program for WG1.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
ILC Cavity Gradient R&D Plan Proposal for Release 5 Rongli Geng for ILC Cavity Group 2jun2010 ILC SCRF WebEx Meeting 6/2/20101ILC SCRF WebEx Meeting.
CRAB for HL-LHC KEK activity 2010DEC Yoshiyuki MORITA.
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
JRA1 – SRF report CARE Steering Committee meeting,
HiGrade-Kickoff DESY Global Design Effort 1 ILC-HiGrade WP6 High-Gradient cavities Lutz Lilje DESY.
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
Lutz Lilje DESY -MPY- SCRF Infrastructure at CERN? Electron Accelerator R&D for the Energy Frontier Lutz Lilje DESY –MPY-
Lutz Lilje DESY -MPY- Summary of the Superconducting RF WG DESY -MPY Overview on talks given List European Assets.
Curtis Crawford, Georg H. Hoffstaetter Cornell University Laboratory for Elementary-Particle Physics Optimization of f 9-cell Vertical Electro Polishing.
DISCUSSION BCP in subassemblies or in fully assembled cavity? Silvia Verdú-Andrés | Brookhaven National Laboratory | 11 December 2015 Thanks to Mike Kelly.
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Specification Table 23 Oct 2007 FNAL Lutz Lilje DESY.
MHI#16 号機の2回目の EP2  Process log  Status of working  Monitor data during EP & Rinsing process  Comparison of EP2 Period : 2011/5/10 ~ 5/16 Process :
A European SCRF Infrastructure DESY -MPY Goals of the Infrastructure – ILC – Other projects Timeline – Phasing of work Needs.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
Overview on DESY Infrastructure and up date/ grade Activities schedule status and plans Axel Matheisen DESY.
W. Singer. SRF2011, July 25 ‐ 29, 2011, Chicago, Illinois, U.S.A. XFEL Cavity Recipe for Mechanical Fabrication and Treatment Waldemar Singer/DESY.
SRF COLLABORATION MEETING MAY.2016 ESS MEDIUM BETA CAVITY MANUFACTURING CEA Saclay/ESS ECCTD WU Cavités | Enrico Cenni.
MHI#19 号機の1回目の EP2  Process log  Condition of EP2 & Rinsing process  Status of working  Monitor data during EP & Rinsing process Period : 2012/2/17~
Hao Guo LINAC Department Institute of Modern Physics.
Recent FNAL/ANL Cavity Performance C.M. Ginsburg (FNAL) On behalf of the FNAL/ANL Cavity Crew TTC Meeting - Milano 28.Feb.-3.Mar
Andrew BurrillFall 2011 Project X Collaboration Meeting 650 MHz Developments at JLAB Andrew Burrill for the JLab Team.
Americas Report C.M. Ginsburg (FNAL) for the FNAL/ANL, JLab, and Cornell (no report this time) cavity teams S0 Meeting 7.June 2011.
SRF Test Facilities – Functions and Costs Alexander Romanenko Test Facilities Review 17 Mar 2015.
ILC-HiGrade annual meeting - 22 November 2010 ILC-HiGrade Meeting Cavity-Treatment at CEA Saclay (WP6) F. Eozénou.
Field emission in SRF Cavities
July 5th,2006John Mammosser, Jlab ILC – Electropolish Development (EP) Plans/Progress/Problems/Performance Jefferson Lab J. Mammosser, L. Phillips, C.
Rongli Geng ILC Cavity Group Meeting October 25, 2011
Vertical Electro-Polishing activities at CEA Saclay
Status and plans for the 3.9 GHz section of XFEL
Electropolishing of Dressed ILC 9-cell Cavity
ILC-SCRF Test Facilities considerations
DESY Experiences on Use of Gas overlay during Assemblies
Vertical Electropolishing at Marui & KEK
Fabrication of Nb and Cu SPL cavities and required tools CERN status
High Q via N infusion R&D at Jefferson Lab
Some History of Electropolishing of Niobium 1970 – 1990
S0 Status report from KEK
A COMMON R&D ON THE HIGH GRADIENT Nb CAVITIES
R&D Activity for Field Emission and Vertical EP
Quality control study with single-cell cavities
Highlights from EU Global Design Effort
Degradation and possible sources Statistic of resonators
Nick Walker (DESY) EU GDE Meeting Oxford
Technical Issues Related to Superconducting Accelerator Modules
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

1 BCD/ACD developments for Cavities Several improvements are needed on both BCD/ACD A significant amount of R&D work is needed to resolve issues –Quality control of the processes of cavity preparation needs improvement –

2 Processing BCD/ACD developments - 1 BCD=EP, 6-800°C & EP –Need to confirm the amount for damage removal. DESY will get more statistics on nine-cells ACD 1.Centrifugal barrel polishing 40 µm BCP 10 µm + 750°C & EP 50µm to 75 µm Is Mechanical better alternative? –Good for defect removal –Good initial surface roughness –Environmentally friendly –Q disease issue KEK will work on five- or nine-cells 2.BCP & EP ????

3 Processing BCD/ACD developments - 2 Electropolish improvements: –Control of HF concentrations during processing (sulphur) Sample measurements exist at Saclay Jlab: Automated addition of HF during process (relate to current density monitor) DESY: Monitor the current density, improved heat exchanger KEK: –Control of Nb content during processing other contaminants? Some sample measurements exist (Saclay, KEK) On EP system –Calculated (KEK,JLAB,DESY) –Measurement (online, offline) –Monitoring removal rate Online (Cornell ?) Offline: –Witness Samples (DESY,JLAB) –Weight (KEK,JLAB,DESY) –Ultrasonic (KEK,CORNELL, JLAB) –Are we working in the right part of the I-V curve? Dc (DESY, KEK, JLAB) –Voltage control (DESY,KEK,JLAB) –Current(JLAB, HENKEL) –Feedback (INFN Legnaro) pulsed

4 Processing BCD/ACD developments - 2 a –Can we get the right current distributions for uniform etching? Measurement off the removal dependent on position, then calculate (KEK) Grooved in equator region (JLAB bench) Software for calculation (DESY) Fluxgate magnetometer (INFN Legnaro) –Measure surface roughness as process QA - can we do it? Witness samples might be insufficient Measure inside the cavity ????? –Orientation Horizontal (KEK,DESY,JLAB, HENKEL, INFN) Vertical (CORNELL) –Other acid compositions Increase HF (KEK, Saclay) Buffering –Lactic (JLAB, half cells, test bench) add water plus HF (Saclay) Nitric acid (KEK) –Develop a technique to EP cavities in helium vessels (understand and minimize voltage drop along cavity) –Mass production Quick connect (DESY, JLAB?) Acid recycling (KEK) –Cost and environmental issues

5 Processing BCD/ACD developments - 3 Determination of optimum post-etching rinse processes –Rinse fluid Water (DESY, JLAB, KEK, ….) Hydrogen peroxide (KEK, CORNELL) Ozonated water(KEK) Alcohol (DESY, JLAB?) Duration? Output water quality parameters? –Rinse & dump? Steady flow? Post-rinse handling –Manipulation Cleaning of the outside of the cavity –Ultra-sound (DESY, JLAB?) –HPR (KEK) –Storage until HPR baseline is to keep it full of water

6 Processing BCD/ACD developments - 4 Ultra-pure high-pressure water rinsing –Improve water quality with additional/better monitoring Particulates - both –Input »Online (High Pressure side: Jlab; Low pressure: DESY) –output streams »Online (Jlab?) »Offline (DESY) Total oxidizable carbon –Need reliable system (Specification? Oil contamination?) »Online (High Pressure side: Jlab; Low pressure: DESY) –Active carbon filter (KEK) –Degassing of oxygen against bacteria (KEK) –Sanitizing procedures (JLAB, DESY?) Dissolved solids –Full water analysis (JLAB 1x year) Resistivity (all) –Improve cleaning power Optimize nozzle material, geometry, size (JLAB) Optimize flow rates, impact angles (JLAB, INFN Milano) Optimize pressure (JLAB) Investigate electrostatic charging –Change of oxide structure, monitoring needed –Optimize duration of rinse –Quantify water quality needed 7 MOhm (KEK)

7 Processing BCD/ACD developments - 5 Post-HPR handling: –Drying procedures Laminar flow in clean room (DESY, KEK, JLab) Vacuum (DESY, KEK, JLab) –Understanding of the best Vacuum system needed(JLAB ?) »Oil-free (DESY ?) »No particulate contamination Hot nitrogen drying (JLAB) Heating –With evacuated cavity (KEK): ‘In-situ’ bake –Air bake (SACLAY) Alcohol rinse

8 Processing BCD/ACD developments - 6 –Storage until test air, vacuum, clean nitrogen, argon, ???? –Assembly Standardisation of cleaning methods for sub-components –Cf. Mass production –QA of particle counts etc. –Main power coupler: »Can it be cleaned like the other components (before processing)? Documentation of assembly procedures –QA of particle counts etc. Training of people –Bakeout at ~120° C Optimize low-T bakeout temperature and time (Saclay) –Part of the drying process (KEK) Air bakeout (Saclay) –Backfill Argon –Avoid nitride formation during tank welding –DESY –KEK: After RF test only Argon Nitrogen –Jlab, DESY (single-cells), CEA ? –KEK: Before RF test

9 Processing BCD/ACD developments – 6 High-temperature heat treatments –Integration of furnaces into clean room? – °C Optimise temperature and duration Attach furnaces to cleanroom Cavity under separate vacuum –1400°C High RRR needed? –Data analysis of cell Eacc/RRR –High RRR sheets from supplier

10 Testing developments R&D phase –Improve cold test diagnostics Extend thermometry to all tests Visible light monitoring of helium boiling –We need to do more post-test forensics –All passband modes measured –Data on dark current VT: –Relation of X-rays to dark current??? –Measure X-rays in all directions Module test stand –Faraday cup

11 Test Sequence BCD BCD: –Vertical low-power test of all cavities Measure 8 cavities in one cooldown Sorting ? Different manufacturers for cavities and module (interface) –High-power test only few single cavities –All sub-components tested Need to improve quality control of feed throughs, couplers, tuner motors –Module power test First X % modules, then every Y module Must include dark current measurement

12 EP half-cells Preparation of auxiliary components –Cleaning and handling kept consistent with cavity treatments Have we got the right gasket material? Can we improve flanges to reduce the likelihood of contamination? Fabrication ACD developments

13 Investigate EP with single-crystal/large-grain material –Phonon peak Optimum heat transfer by reduction of Kapitza Investigation on Flux trap n Nb/Cu clad Material ACD developments

14 Mass Production Issues for Preparation Process Simplify assembly procedures Reduction of hardware counts Minimize contact with humans –Tooling, Fixtures –Investigation of automation Determine equipment MTBF There is a need to develop QA processes to assess particulate contamination of the inner cavity surface