Project Management 101 CS3300 Fall 2015. Generic Management Planning Organizing Staffing Leading / Directing Controlling To accomplish goals of an organization.

Slides:



Advertisements
Similar presentations
Precedence Diagramming
Advertisements

Scheduling Work I love deadlines. I love the sound they make as they fly by. -- Douglas Adams.
CP Chapter 4 Schedule Planning.
Work Breakdown Structures
Estimating, scheduling and budgeting
Advanced Project Management - CPH
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
SW Project Management Project Schedule and Budget
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Project Time Management
Importance of Project Schedules
Jeopardy Game! Scope Management Time Management Integration Management.
Project Time Management
Project Time Management
Time Management Ahmed Awad, Ph.D., PMP. Time Management It includes the processes required to ensure timely completion of the project. b Activity Definition.
PROJECT SCOPE, SCHEDULE, AND RESOURCE MANAGEMENT
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
The Critical Path – Precedence diagram method Luise Lorenz Christina Mohr.
Software Project Management Task Sequencing Activity Sequencing Concepts PERT charts Critical Path Analysis.
5.1 Principles of Project Management. So what is Project Management? Definition: Is the process of planning, organizing, and managing tasks and resources.
TIME MANAGEMENT Definition: Time management is a set of principles, practices, skills, tools, and systems that work together to help you get more value.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Lecture 5 Title: Project Time Management By: Mr Hashem Alaidaros MIS 434.
POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY
Project Management Project Planning Estimating Scheduling.
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
Successful IT Projects slides © 2007 Darren Dalcher & Lindsey Brodie Successful IT Projects By Darren Dalcher & Lindsey Brodie
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
Lecture 7. Review of Lecture 6 Project Scheduling: The process of defining project activities, determining their sequence, estimating their duration Scheduling.
1 L U N D S U N I V E R S I T E T P rojektledning och Projektmetodik.
Managing Project Resources. Project Resources Human Resources Project stakeholders: – Customers – Project team members – Support staff Systems analyst.
Project Scope Management Project management Digital Media Department Unit Credit Value : 4 Essential Learning time : 120 hours.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
Geog 469 GIS Workshop Project Management.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
S/W Project Management Software Project Planning (POMA) Task Analysis.
Project Management All projects need to be “managed” –Cost (people-effort, tools, education, etc.) –schedule –deliverables and “associated” characteristics.
University of Sunderland CIF 301 Unit 4 CIF 301 Project Planning Unit 4.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
11/02/09 Chapter 7-Project Planning 1 Elements of Project Planning  Divide project into tasks, tasks into subtasks, subtasks into...  Estimate duration.
College of Information Systems & Technology © 2001 University of Phoenix. University of Phoenix is a registered trademark of Apollo Group, Inc. in the.
Scheduling Work I love deadlines. I love the sound they make as they fly by. -- Douglas Adams.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Project Time Management
5 th LectureCEN 4021: Software Engineering II Task Sequence and Effort representation  All tasks share at least two basic characteristics –Require effort.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
SOFTWARE PROJECT MANAGEMENT
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
Project Management Fundamentals - Planning Tools 1.
IT-301 Project Management I: Unit 4: Cost Management.
© Copyright 2008, Information Control Corporation. All rights reserved. Project Management Bytes Making WBS work for you! 1.
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
Scheduling Scheduling : is the process of converting a project action plan into an operating time table. Why scheduling ? To answer the following questions:
Introduction to Project Management Chapter 7 Managing Project Resources Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Time Management.
ECE362 Principles of Design
Project Planning & Scheduling
Project Planning & Scheduling
Activity Planning.
Chapter 6: Project Time Management
Project Management Planning Models
Project Time Management
Project Time Management
Chapter 6 Activity Planning.
Project Time Management
Project Time Management
Project Time Management
Presentation transcript:

Project Management 101 CS3300 Fall 2015

Generic Management Planning Organizing Staffing Leading / Directing Controlling To accomplish goals of an organization

Phases of Managing a Project

Stages of Projects Wild Enthusiasm Disillusionment Total Confusion Search of the Guilty Punishment of the Innocent Promotion for the non-participants

Mind Map

Triple Constraint

Scope Definition What is in the project What is not in the project Manage Customer Expectations

Techniques to Identify Work To-Do List Approach Work Breakdown Structure User Stories / Use Cases / Story Cards

Work Breakdown Structure From Readings:  Deliverable Oriented  Nouns, not verbs  Numbered by levels for reference  Two-week (80 hour) rule (for stopping decomposition)  Contains all the work to be done  Lowest level are work packages  Final WBS is the scope of the project

Catch-22 To prepare a work breakdown structure, we have to know what we are going to build!!!! That means we have to gather requirements and have a deliverables list for the customer. So even though the requirements are a deliverable on the wbs, and need to planned and budgeted, they have to be done before we can complete the plan.

Now we transition from the WBS to a schedule Convert the work packages into activities (verb oriented, things you are going to do to develop the deliverables. Estimate the time required for each activity Decide pre-requisites Create the activity diagram for CPM

Table of Activities ActvityTime EstimatePre-Req A5 B4A C3B,E D6C E2

Activity Cell Early Start Late Start Early Finish Late Finish Activity Name Duration

Activity Diagram Start A E B C 3 18 D 6

Critical Path Term Float (Slack) = LS - ES Critical Path = The path that has no float Fast Track = Apply more resources to an activity on the critical path to finish sooner Resource CPM = adding resource and cost to the nodes to allow estimation of resources.

How do we estimate? Traditional CPM: pessimist + 4 * most likely + optimist / 6 Estimate product size (pages of documention or lines of code), then use productivity numbers Historical Data / Analogy

Develop a Staffing Plan For each activity, determine job descriptions required Then determine amount of effort From effort and descriptions, list people required Activity diagram will also give you a hiring curve (normally bell-shaped)

Finally resources For each activity, we can also determine specific hardware and software resources necessary for the activity. Taken all together, this gives us the preliminary project plan. This technique is “activity-based costing”