Original plan for secondary line installation. Hadron hall beamlines in Phase1 Hadron hall secondary beamlines ① ② ③ ④.

Slides:



Advertisements
Similar presentations
Muon g-2 Inflector AEM Meeting 11/25/2013 Chris Polly Muon g-2 Project Manager.
Advertisements

Ozgur Ates Hampton University TREK Experiment “Tracking and Baseline Design” And OLYMPUS Experiment “Study of Systematics” 1.
Ozgur Ates Hampton University HUGS 2009-JLAB TREK Experiment “Tracking and Baseline Design”
1/22 MOLLER Juliette M. Mammei. 2/22 Working Groups Polarized Source Hydrogen Target Spectrometer Integrating Detectors Tracking Detectors Polarized Beam.
Fermilab E906 Schedule Paul E. Reimer 20 June 2008.
14 Sept 2004 D.Dedovich Tau041 Measurement of Tau hadronic branching ratios in DELPHI experiment at LEP Dima Dedovich (Dubna) DELPHI Collaboration E.Phys.J.
T2K – Canada Accelerator & Detector Status D. Karlen University of Victoria & TRIUMF ACOT meeting, May 12, 2007.
Hall D Photon Beam Simulation and Rates Part 1: photon beam line Part 2: tagger Richard Jones, University of Connecticut Hall D Beam Line and Tagger Review.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
Status of the Tagger Hall Background Simulation Simulation A. Somov, Jefferson Lab Hall-D Collaboration Meeting, University of Regina September
The Time Reversal Experiment with Kaons (TREK) at J-PARC Hampton University, Hampton, VA, USA & Jefferson Lab, Newport News, VA, USA Michael Kohl OLYMPUS.
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
TOF for ATLAS Forward Proton Upgrade AFP concept: adds new ATLAS sub-detectors at 220 and 420 m upstream and downstream of central detector to precisely.
Status of the Beamline Simulation A.Somov Jefferson Lab Collaboration Meeting, May 11, 2010.
SHMS Optics and Background Studies Tanja Horn Hall C Summer Meeting 5 August 2008.
1 st October Linear Collider workshop The CLIC/ILC common work plan progress J. Clarke and L. Rinolfi.
TWIST A Precision Measurement of Muon Decay at TRIUMF Peter Kitching TRIUMF/University of Alberta TWIST Collaboration Physics of TWIST Introduction to.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
Start Counter Collaboration Meeting September 2004 W. Boeglin FIU.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
A search for deeply-bound kaonic nuclear states in (in-flight K -, N) reaction Hiroaki Ohnishi RIKEN.
Asian Test Beam Facilities Satoru Uozumi Kyungpook National University Mar-29 th 2010 Beijing China IHEP Beijing TBF Russia.
+ - Concluding remarks on the R&D for a Magic Proton Ring for e  cm. Yannis K. Semertzidis, BNL The bottom line Funding request Possible action.
G-2 accelerator and cryo needs Mary Convery Muon Campus Review 1/23/13.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
Overlap of Project X and Beamline to DUSEL June 2, 2008.
1 Progress Report to PAC3 J-PARC E06 Experiment (TREK) Measurement of T-violating Transverse Muon Polarization (P T ) in K + →     Decays J. Imazato.
Latifa Elouadrhiri Jefferson Lab Hall B 12 GeV Upgrade Drift Chamber Review Jefferson Lab March 6- 8, 2007 CLAS12 Drift Chambers Simulation and Event Reconstruction.
SksMinus status Hyperball collaboration meeting 2009/3/11 K. Shirotori.
Vina Punjabi Norfolk State University Hall A Collaboration Meeting June 10-11, 2010 GEp-V Experiment to Measure G Ep /G Mp.
M. Ellis - MICE Collaboration Meeting - Thursday 28th October Sci-Fi Tracker Performance Software Status –RF background simulation –Beam simulation.
Μ→e search using pulsed muon beam μ -  e - νν nuclear muon capture Muon Decay In Orbit  π - +(A,Z)→(A,Z-1)*, (A,Z-1)* →γ+(A,Z-1), γ→e + e - Prompt.
COMET. μ-e conversion search from muonic aluminium J-PARC pulsed proton beam to produce pulsed muon beam Forbidden in the Standard Model  clue to the.
Active polarimeter simulation Suguru Shimizu Osaka University Sep. 1, 2007 JPARC TREK Collaboration meeting at Saskatchewan.
J-PARC でのハイパー核ガンマ線分光実験用 散乱粒子磁気スペクトロメータ検出器の準備 状況 東北大理, 岐阜大教 A, KEK B 白鳥昂太郎, 田村裕和, 鵜養美冬 A, 石元茂 B, 大谷友和, 小池武志, 佐藤美沙子, 千賀信幸, 細見健二, 馬越, 三輪浩司, 山本剛史, 他 Hyperball-J.
Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions Activities of Nuclear and Particle.
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
COMET μ-e conversion search at J-PARC. μ-e conversion physics SUSY-GUT, SUSY-seesaw (Gauge Mediated process) – BR = = BR(μ→eγ) × O(α) – τ→lγ SUSY-seesaw.
Measurement of T-violating Transverse Muon Polarization in  + →     Decays at J-PARC Suguru SHIMIZU Osaka University Oct. 6, 2006 SPIN2006.
Luminosity Monitor Design MICE Collaboration Meeting 31 May 2009 Paul Soler.
Status of E14 G.Y.Lim IPNS, KEK. E14 Experiment Step-by-step approach to precise measurement of Br( K L    ) KEK-PS E391a J-PARC E14 (Step-1) J-PARC.
Experiment Readiness Review P. Rossi – Hall C Coll. Meeting Jan 21, 2016.
Working group on photon vetoes Meeting on June 7 th : 1.Status of Geant4 simulations 2.Discussion on LAV structure 3.Discussion on readout 4.News on Spaghetti.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
A High Statistics Study of the Decay M. Fujikawa for the Belle Collaboration Outline 1.Introduction 2.Experiment Belle detector 3.Analysis Event selection.
J-PARC でのシグマ陽子 散乱実験の提案 Koji Miwa Tohoku Univ.. Contents Physics Motivation of YN scattering Understanding Baryon-Baryon interaction SU(3) framework Nature.
BENE MECC detector Pasquale Migliozzi INFN – Napoli.
1 Melynda Brooks, “Understanding the Origin of the Nucleon Spin” Understanding the Origin of the Nucleon Spin Andi Klein, P-23, Melynda Brooks P-25, Pat.
Updated sensitivity estimate Suguru Shimizu Osaka University Sep. 1, 2007 JPARC TREK Collaboration meeting at Saskatchewan (1)Statistical error (2)Systematic.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
G0 Backward Angle Request: Q 2 = 0.23, 0.48 GeV 2 Main points G0 goal is to measure G E s, G M s and G A e over range of momentum transfers with best possible.
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
1 Work report ( ) Haoqi Lu IHEP Neutrino group
MAC meeting (12-13 January 2010) Machine Advisory Committee participants: B.Sharkov (ITEP/FAIR) P.Belochitskii (CERN) S.Ivanov (IHEP, Protvino) M.Steck.
Stopped K beam at J-PARC Designed by J.Doornbos 1)Optics design of a K0.8 branch 2)Performance 3)Pion contamination 4)Comments on K1.1 Nov. 4, 2005 Korea.
for the E06(TREK) collaboration
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
Tracking(1) Kp2 decay-in-flight BG simulation
Sanghwa Park (Stony Brook) for the PREX/CREX Collaboration
Luminosity Monitor Status
IHEP group Shashlyk activity towards TDR
Kaon beam at K1.1BR KEK Jun Imazato.
Special Considerations for SIDIS
Experimental equipment Edgar L. Black February 17, 2019
GEANT Simulations and Track Reconstruction
Geant4 in HARP V.Ivanchenko For the HARP Collaboration
Background Simulations at Fermilab
Presentation transcript:

Original plan for secondary line installation

Hadron hall beamlines in Phase1 Hadron hall secondary beamlines ① ② ③ ④

Other approved experiments E05, E13: stage-2 E07, E19, etc: stage-2 Hyper-nuclear exp. Using SKS as Day-1 from E15, E17: stage-2 Kaonic nuclei exp. as K1.8BR E14 :stage-1 K L ->   Three secondary lines run simultaneously

Time schedule of E06 A guess! Very dependent on the K1.1-BR beam installation

Grant-in-Aid application in Japan We will make a 5 year plan for 2008 to 2012 for ~ 300 kYen. Active polarimeter Muon field magnet CsI(Tl) readout Total assembly Electronics and DAQ Some fraction of Target and Tracking Operation money (travel, meeting etc.) Transfer of the SCM and He cryogenic system are not included. Application deadline is the end of October at KEK We will describe all the details of the total project. It is very desired that we can show the international cooperation in detector upgrades.

International cooperation Memorandum of Understanding (MoU): Now in preparation process between TRIUMF /JPARC and INR/JPARC Responsibilities of both sides It will facilitate the installation of the beamline How about MIT and other universities? –Letters from the J-PARC center director enough? Contribution tot the branch part of K1.1-BR from Canada?

Job assignments and schedule (1) (1) K0.8 beamline element identification (J.Imazato)- Check of the preparation status by the Hadron Beamline Group- Check of available components- More precise cost estimate- Installation planning proposal# by next PAC (2) E1120 analysis (Danielle Anderson, J. Imazato, M. Hasinoff)- Analysis with a Gaussian relaxation function- Finalizing result and report to TRIUMF# by Saskatoon (?) + TRIUMF deadline% TREK Technical Note No.5 (3) Electronics summary (Y. Igarashi, S. Shimizu)- List-up of necessary developments and who and how- List-up of modules which we expect to obtain from the pool.- More precise cost estimate and time schedule# by Saskatoon and next PAC% TREK technical Note No.6 (4) C0 and C1 GEM chamber (M. Kohl)- More detailed report of the FNAL test experiment- Clarification of rate capability- C0 cylindrical chamber conceptual picture# by Saskatoon% TREK Technical Note No.4

Job assignments and schedule (2) (5) Polarimeter misalignment analysis (K. Horie, S. Shimizu)- Write up a technical note# by Saskatoon meeting% TREK Technical Note No.2 (6) Syatematic error estimate (K. Horie, S. Shimizu)- More precise evaluation of systematic error due to Pol.alignment- Evaluation of cancellation factors for other systematics- Inclusion of realistic magnetic field distribution# by next PAC (?) or earlier% TREK Technical Note No.7 (7) GEANT4 flux study around target (M. Hasinoff, P. Gumplinger)- Summary of GEANT4 calculation- Comparison with MPPC tolerance# by Saskatoon meeting% TREK Technical Note No.3 (8) Summary of MPPC radiation hardness tests (T. Matsumura)- Summary of RCNP proton beam test- Other beam tests- Recommendation for the target readout# by Saskatoon meeting% T.Matsumura is going to make a journal paper (?)

Job assignments and schedule (3) (9) Design of target assembly (W. Anderson, S Strauch)- Design of fiber unit with MPPC- Study of shielding effectiveness with MC (S. Strauch)- Design of total assembly- Design of a backup option using PMT (10) CsI(Tl) readout amplifier (A. Ivashkin, J. Imazato)- To find a designer for the amplifier (11) CsI(Tl) beam test at Tohku (H. Yamazaki, T.Matsumura)- Module test with the 250 MeV electron beam or tagged photons.- Preparation of available amplifiers# Beam time request for autumn ? (12) Muon magnet design (J. Imazato, H. Nakayama)- Force calculation with TOSCA 3D- Flatness optimization with shims- Design of total assembly and support

Job assignments and schedule (4) (13) Conceptual design of polarimeter chamber (S. Shimizu, K. Horie)- Determination of main parameters# by Saskatoon meeting- GARFIELD calculation- MC simulation for muon stopping and positron detection with the realistic field distribution from TOSCA-3D- Feasibility study of pion left-right event analysis (14) Preparation for Kaken-hi application in Japan (J. Imazato)# submission will be in October (15) Preparation for budget requests in Canada (Chary, M. Hasinoff )# Mid September (16) Preparation for budget requests in U.S. (W. Anderson,S. Strauch?)

Other progresses K + stopping efficiency and target size (M.Hasinoff) Tracking simulation and K  -dif BG estimate (S.Shimizu, K.Horie) K0.8 beam line design improvement (J.Doornbos)

Beamline issues and next PAC IPNS/J-PARC started to make a realistic plan of KL/K1.1 installation according to the PAC recommendation This plan will be presented to the next PAC meeting in January. There we have also to make our E06 progress report. – K0.8 beam optics optimization and Installation schedule – Target readout method, MPPC or PMT? – Further study of systematic errors (down to < ) Polarimeter analysis – High rate performance of the detector (in general?) Target-MPPC, CsI(Tl)-APD, C0 – Funding efforts/ international cooperation with MOU

Beamline issues and next PAC IPNS/J-PARC starts to make a realistic plan of KL/K1.1 installation according to the PAC recommendation This plan will be presented to the next PAC meeting in January. There we have also to make our E06 progress report. – K0.8 beam optics optimization – Target readout method, MPPC or PMT? – Further study of systematic errors (down to << ) – High rate performance of the detector (in general?) – Funding efforts/ international cooperation with MOU

Time schedule Application of the Tohoku beam time in Sept. Application of Grant-in-Aid money in Japan : in October 2007 Next PAC meeting : 7-8 January, 2008 Next TREK meeting : February, 2008 Next next TREK meeting : where and when?