1 Hasanuddin University Engineering Faculty Department Project Equipment Discussion Note July 2006 SAPROF Team.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
EPA Regions 9 & 10 and The Federal Network for Sustainability 2005
Session 8 Implementing PPPs
Planning PERT - Project Evaluation and Review Technique) and CPM - Critical Path Method are network analysis techniques that are commonly used in project.
1.040/1.401 Project Management Spring 2007 Lecture 7 Dr. SangHyun Lee Department of Civil and Environmental Engineering Massachusetts Institute.
1 Click to edit Master text styles Second level Third level Fourth level Fifth level Administrative Support for Large- Scale Funding Applications – Session.
1 INSTITUTION OF ENGINEERS OF KENYA ENGINEERS INTERNATIONAL CONFERENCE May 2012.
Writing an Effective Proposal for Innovations in Teaching Grant
International Conference on Project Management Nanyang Technological University, Singapore and Society of Project Management, Japan July 31-August 2, 2002,
Project Bidding Procedures Enhancing Data and Presentation Skills for Engineers EDASPE Writing the RFP Training Courses – July 2004.
DOL AME Grant RFPs Manufacturing Lab Equipment Pre-Award Webinar July 25, 2013.
Project Management Process. Project Complexity means that: a team of people are needed to supply expertise the work needs to be broken into manageable.
Procurement Procedure and Preparation of Procurement Plan with reference to Karnataka.
Yaoundé, November Presented by: Mamata Teindrebeogo, Amadou Doudou Seck World Bank.
Development plan and quality plan for your Project
1 University of the State of New York State Education Department Differentiated Accountability School Quality Review (SQR)
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Periodical Purchasing Julie V. Rivera. Brownsville ISD Procurement Guidelines Following established policies and administrative guidelines, the following.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Discovery Planning steps (1)
1 Training on Procurement Procedure 23 rd Review Meeting of State FCs- Bhopal ( ) Annexure ‘W’
Introduction to ISO New and modified requirements.
1 CAPACITY BUILDING AND TRAINING ON PROCUREMENT Session 9 – The World Bank Procedures for IT Procurement September 21, 2005 by Arif Hassan.
AL-QADISIYIA UNIVERSITY COLLEGE OF ENGINEERING SELF ASSESSMENT REPORT Submitted by SAR committee.
PROCUREMENT SERVICES DEPARTMENT “How We Do Business”
Industrial Engineering
Intro to Business, 7e © 2009 South-Western, Cengage Learning SLIDE CHAPTER Types of Production Production Planning Planning.
Strategic Management And Marketing Concepts Let’s Say, “And now for details.”
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
RISE Grant: Proposal Writing Workshop UAF RISE Board February 21, 2014.
1 Developing the Specification/ Statement of Work Susan Georgis Master Agreements & Contracts Ben Martin Procurement Engineering.
CHAPTER#08 MANAGEMENT OF TECHNICAL PROPOSALS AND SPECIFICATIONS Lecture No. 08 Course: Engineering Management 19 april 2013 MED DEPARTMENT, U.E.T TAXILA.
Guidelines for Leases and Maintenance Agreements Procure to Pay Services Updated 2/2/2012.
LECTURE IV. o Project HRM include the processes that organize, manage and lead the project team. o The project team is comprised of the people with assigned.
4 - 1  2001 Prentice Hall Business Publishing Management Accounting, 3rd ed., Atkinson, Banker, Kaplan, and Young Traditional Cost Management Systems.
UNIVERSITY OF TORONTO SCARBOROUGH 1265 Military Trail, Toronto, Ontario M1C 1A4 CAMPUS DESIGN AND DEVELOPMENT (CDD) COMMITTEE.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
BUDGET FORMAT EXPLANATION Presented by Devon Nish Utah Department of Human Services Bureau of Contract Management.
Project 1 (CGNB 413) Briefing
1 © 2013 Protiviti Inc. All Rights Reserved. This document has been prepared for use by OOCEA’s management, audit committee, and board of directors. This.
Student Resource Scheme A Guide for Principals and School Business Administrators Version 1 – September 2015.
Buying Energy Efficient Products: Policy Requirements, Purchasing Tools, and Agency Experiences Christopher Payne Lawrence Berkeley National Laboratory.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
SEAD-funded APEC-CAST Project Proposal Solicitation Update 39 th Meeting of the APEC Expert Group on Energy Efficiency & Conservation 28 February 2012.
Installation and Commisioning SE view point Romuald Duperrier ESS SE manager.
Creating the Self Study. Required Materials Guide to Approval (add link) Glossary of Terms (add link) Sponsoring institution fact sheet (add link) Clinical.
MKT 450 Week 3 Learning Team Assignment Detailed International Marketing Plan Outline Part I To purchase this material click below link
PSYCH 545 Week 3 Learning Team Deliverable Outline for Week 4 Paper Complete the Learning Team Deliverable. Please prepare a brief outline for the Team.
ACC 557 Week 5 Learning Team Assignment Internal Policies Your firm must establish internal policies regarding the creation of business contracts as well.
5 CERF BUDGET AND ADMINISTRATION REQUIREMENTS TRAINING SESSION
EnMS Management Review
ECE362 Principles of Design
Activity-Based Costing and Activity-Based Management
OMI - THAMES WATER, INC ANNUAL SETTLEMENT STATEMENT CONTRACT YEAR 3
Costing and Project Evaluation
Department of Community Development
Finance Summer Training
Grants Academy Session Four
Sam Houston State University
Procurement Planning Mani Ram Gelal
DBIA Manual of Practice
Sam Houston State University
IMPLEMENTATION ,EVALUATION AND MAINTENANCE OF MIS
LABORATORY OF PROCESS ENGINEERING
Change Tested or Implemented
East Hall under construction
GC University Lahore Quality Enhancement Cell
Presentation transcript:

1 Hasanuddin University Engineering Faculty Department Project Equipment Discussion Note July 2006 SAPROF Team

2 Equipment discussion procedure 1. Preparation and confirmation of Equipment list (Draft) Target schedule: By July Discussion based on “Equipment reference sheet” with Department, format is prepared by SAPROF team Target schedule: By August Cost estimation (SAPROF team in charge) Target schedule: By Middle of September 2006

3 Necessary information on Equipment Discussion Please provide information as below; Equipment list ( New, Major Existing Equipment to be moved) Laboratory list (new campus) Curriculum (It is necessary to finish discussion about curriculum with SAPROF team in advance.) Research topics (It is necessary to finish discussion about research topics with SAPROF team in advance.) Room assignment plan Operation and maintenance plan

4 Basic Policy on Equipment Selection-1 1. Planned Equipment shall be based on Research and education curriculum. - All equipment will be evaluated and examined linkage with research and education curriculum. - Result of linkage between equipment and curriculum will be summarized into “Equipment reference sheet”. (SAPROF team support to prepare this sheet.) Necessity from research and education Specified items and Quantity →Equipment list

5 Basic Policy on Equipment Selection-2 2. Planned Equipment shall be secured necessary installation space. - Installed laboratory and/or room shall be specified. It will be link with facility planning. - Result of linkage between equipment and laboratory and/or room will be summarized into “Equipment reference sheet”. (SAPROF team support to prepare this matrix.) Space for Equipment Equipment and room assignment plan Equipment layout plan

6 Equipment Selection Criteria Inclusion Criteria Necessary for research and education curriculum implementation Necessary for administrative activities Necessary for University capacity enhancement Exclusion Criteria Not necessary for University’s activities Usage/purpose not clearly defined Small items, such as glass wares Only consumables and spare parts

7 Equipment Planning Strategy Division on Category of equipment into 2 1. Major Equipment -Obviously necessary to implement research and education (with curriculum evidence) -Large equipment, which is necessary to secure installation space. -Expensive equipment and high priority for research and education. 2. Minor Equipment -Necessary in the future -Detailed specifications are not specified -Not specified

8 Equipment list preparation Major Equipment Minor Equipment Including “Equipment Reference sheet” as a “item”, -Equipment name -Quantity -Installed room etc Including “Equipment Reference sheet” as a “general description”, just making a pile of equipment such as; “Equipment for Civil engineering A laboratory” “Equipment for Energy engineering” To be specified in the future

9 Equipment reference sheet

10 Procurement Policy Package for Bidding (by ICB, LCB) - ICB: International Competitive Bidding - LCB: Local Competitive Bidding Procurement schedule by Package (By year)