Legend: 1 low-energy IP (s ~ 300) 2 medium-energy IPs (s < 3000) ELIC =high-energy (s = 20000?) (E p ~ 250 limited by JLab site) Use.

Slides:



Advertisements
Similar presentations
Overview of MEIC Ion Complex and Ion Collider Ring
Advertisements

Summary of Nov. 2-3, 2009 EICAC Meeting Steve Vigdor & Hugh Montgomery EIC Collaboration Meeting, 1/11/2010.
Simulation Study For MEIC Electron Cooling He Zhang, Yuhong Zhang Thomas Jefferson National Accelerator Facility Abstract Electron cooling of the ion beams.
ERHIC Main Linac Design E. Pozdeyev + eRHIC team BNL.
V.N. Litvinenko, ElC Collaboration Meeting, Hampton University, May, 2008 Staging of eRHIC Increased Reach in c.m. Energy and Luminosity Vladimir.
Jefferson Lab Status Hall A collaboration Dec. 16, 2013 R. D. McKeown Deputy Director For Science.
1 EIC Users Meeting, Stony Brook June 27, 2014 Request for these slides: Comment on “EIC working group activities at Jefferson Lab, and how people could.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Issues.
Peter Paul 12/16/06e-A Collider concept1 Brief History of the e-A Collider Concept Peter Paul BNL/SBU.
Charge for the MEIC Ion Complex Design Mini-Workshop Andrew Hutton Jan. 27 & 28, 2011.
18 th International Spin Physics Symposium Polarized Beams at EIC V. Ptitsyn.
Toward a Test Facility for an ERL Circulator Ring Based e-Cooler MEIC Electron Cooler Test Facility Planning Retreat January 31, 2012.
MEIC Electron Cooling Simulation He Zhang 03/18/2014, EIC 14 Newport News, VA.
POETIC 2012 Indiana University R. D. McKeown 12 GeV CEBAF.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility EIC Collaboration Meeting, Hampton University, May 19-23,
MEIC Staged Cooling Scheme and Simulation Studies He Zhang MEIC Collaboration Meeting, 10/06/2015.
Thomas Jefferson National Accelerator Facility Newport News, Virginia, USA ELIC: A HIGH LUMINOSITY AND EFFICIENT SPIN MANIPULATION ELECTRON-LIGHT ION COLLIDER.
1 EIC Update R. D. McKeown Presentation to EICAC April 10, 2011 (Thanks to R. Ent, A. Hutton, H. Montgomery, M. Farkhondeh, others)
Alexei Fedotov, 02/02/12 1 Potentials for luminosity improvement for low-energy RHIC (with electron cooling) February 2, 2012.
Jefferson Lab Update R. D. McKeown Jefferson Lab HPS Meeting June 16, 2014.
MEIC: A Medium Energy Electron Ion Collider at Jefferson Lab Hadron Workshop, Huangshan July 2, 2013 R. D. McKeown Jefferson Lab College of William and.
ERHIC design status V.Ptitsyn for the eRHIC design team.
Conceptual Design of A Medium Energy Electron-Ion Collider Based on CEBAF; A Staged Approach for ELIC A. Bogacz, Ya. Derbenev, R. Ent, G. Krafft, T. Horn,
MEIC Overview: Physics, Project & Timeline Rolf Ent MEIC Accelerator Design Review September 15-16, 2010.
Page 1 Review 09/2010 MEIC R&D Yuhong Zhang. Page 2 Review 09/2010 Outline MEIC R&D Issues View 1: EIC AC Recommendations View 2: MEIC Design Status View.
1 EIC Update R. D. McKeown Presentation to JSA Science Council January 7, 2011 (Thanks to R. Ent, A. Hutton, H. Montgomery, others)
Thomas Roser EIC AC meeting November 3-4, 2009 EIC Accelerator R&D Strategy and Programs Thomas Roser/Andrew Hutton BNL / Jefferson Lab R&D program is.
Jefferson Lab Overview Bob McKeown April 20, 2015.
The 12 GeV Physics Program at Jefferson Lab R. D. McKeown Jefferson Lab College of William and Mary PTSP 2013 – Charlottesville, VA September 9, 2013.
EIC Users Meeting, SBU, 6/27/14 Polarized Electron Beams in the MEIC at JLab Fanglei Lin for MEIC Study Group EIC Users Meeting, Stony Brook University,
R.G. Milner2nd EIC Workshop Summary and Outlook science case machine design EIC realization.
MEIC Electron Ring Injection from CEBAF
Inputs from GG6 to decisions 2,7,8,15,21,27,34 V.Telnov Aug.24, 2005, Snowmass.
Preliminary MEIC Ion Beam Formation Scheme Jiquan Guo for the MEIC design study team Oct. 5,
EIC Overview Rolf Ent Nuclear Chromo-Dynamic Studies with a Future EIC Workshop at Argonne National Laboratory April 07-09, 2010 (mainly accelerator.
Synchronization Issues in MEIC Andrew Hutton, Slava Derbenev and Yuhong Zhang MEIC Ion Complex Design Mini-Workshop Jan. 27 & 28, 2011.
Progress on Design Studies of a High-Luminosity Ring-Ring Electron-Ion Collider at CEBAF and Its Low to Medium Energy Staging Approach* S. A. Bogacz, P.
P OSSIBILITIES FOR MAINTAINING AA AND PP CAPABILITIES IN PARALLEL WITH E RHIC V. Ptitsyn Collider-Accelerator Department BNL RHIC and AGS Users Meeting,
Present MEIC IR Design Status Vasiliy Morozov, Yaroslav Derbenev MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
Optics with Large Momentum Acceptance for Higgs Factory Yunhai Cai SLAC National Accelerator Laboratory Future Circular Collider Kick-off Meeting, February.
EC plans in connection with eRHIC Wolfram Fischer ILCDR08 – Cornell University, Ithaca, New York 10 July 2008.
R&D Topics for FOA Funding Proposals
Large Booster and Collider Ring
CEPC-SppC Accelerator CDR Copmpletion at the end of 2017
Introduction to Jefferson Lab
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Other issues and concepts under study Conclusions References
Introduction and Workshop Charge
JLEIC Collaboration Meeting Spring 2017
Workshops Overview/Goals
MEIC Cost Estimate Overview
Why CeC is needed? High luminosity of US future electron-ion collider(EIC) is critical for success of its physics program 2018 NAS Assessment of U.S.-Based.
SOLID Collaboration Meeting
Polarized Positrons in JLEIC
JLEIC Reaching 140 GeV CM Energy: Concept and Luminosity Estimate
MEIC New Baseline: Part 10
MEIC New Baseline: Luminosity Performance and Upgrade Path
Main Design Parameters RHIC Magnets for MEIC Ion Collider Ring
HE-JLEIC: Boosting Luminosity at High Energy
Feedback from the Temple Town Meeting MEIC Accelerator R&D Meeting
JLEIC Main Parameters with Strong Electron Cooling
MEIC New Baseline: Part 7
MEIC New Baseline: Performance and Accelerator R&D
More on MEIC Beam Synchronization
HE-JLEIC: Do We Have a Baseline?
MEIC Alternative Design Part III
Some Thoughts on the JLEIC Ion Injector
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Beam Synchronization in MEIC: The Problem, Scale and Prospect
Presentation transcript:

Legend: 1 low-energy IP (s ~ 300) 2 medium-energy IPs (s < 3000) ELIC =high-energy (s = 20000?) (E p ~ 250 limited by JLab site) Use CEBAF “as-is” after 12-GeV Upgrade E e = 3 – 11 GeV (upgradeable to 20+ GeV) E p = 20 – 60+ GeV (12 GeV injection energy) (upgradeable to 250 GeV) E cm 2 = s = 4E e E p MEIC/ELIC Design Process at JLab

MEIC Design Choices Achieving high luminosity  Very high bunch repetition frequency (1.5 GHz)  Very small β* to reach very small spot sizes at collision points  Short bunch length (σ z ~ β*) to avoid luminosity loss due to hour-glass effect (unless other mitigation schemes used)  Relatively small bunch charge for making short bunch possible  High bunch repetition restores high average current and luminosity MEIC High repetition rate Small bunch charge Short bunch length Small β* MeRHIC Low repetition rate High bunch charge Long bunch length (but…) Large β* (but…) VS. This luminosity concept has been tested at two B-factories very successfully, reaching luminosity above cm -2 /s -1

Current Ideas for a Collider Energiessluminosity to 11 x Close to Future Up to 11 x 250 (22? x 250) (22000?) Close to Staged  IP12/main ring Up to 4 x x 250? (?)-5000(?) Few x Close to (?) to 20 x Few x to 3 x 15180Few x to 70 x Design Goals for Colliders Under Consideration World-wide Present focus of interest (in the US) are the (M)EIC and Staged MeRHIC versions, with s up to ~3000 and ~5000, resp.

Both laboratories are working together to get advice on the best steps towards a US Electron-Ion Collider. Sam Aronson and Christoph Lehmann/Hugh Montgomery have named an international EIC Advisory Committee: Joachim Bartels Allen Caldwell Albert De Roeck Walter Henning (chair) David Hertzog Xiangdong Ji Robert Klanner Alfred Mueller Katsunobu Oide Naohito Saito Uli Wienands 1 st meeting Feb. 16, 2009 at SURA headquarters, D.C. 2 nd meeting Nov. 2&3, 2009 at Jefferson Lab 3 rd meeting around September???, 2010 At BNL??? Concrete design for requested by this meeting Internal reviewed cost estimate requested by this meeting

Near-Term MEIC Design Parameters ElectronProton Collision energyGeV3 – Ion booster 3–12 GeV, ring accepts 12 GeV injection Max dipole fieldT6Not too aggressive after LHC Max SR powerkW/ m 20Factor two beyond best achieved? Max currentA21~ max B-factory current, HOM in component HERA 0.15 A (?) RHIC 0.3 A RF frequencyGHz1.5 Use combination of gap (crossing angle) and RF shift to accommodate lower ion energies Bunch lengthmm556 mm demonstrated in B-factory, 10 cm in RHIC (?) IP to front face of 1 st quad (l) m+/- 3 to 4+/- 7 Vertical β*cm22Keep β max below ~2 km, with  max = l 2 /  * Crossing anglemrad10050 to 150 desired for detector advantages Luminosity expected to be around 1 x e-nucleons/s/cm 2 around 60x5 GeV 2, and be well above at “s edges”

Plan and Deliverables Accelerator Design “Contract” –Medium energy with scaled down parameters (ELIC version M.1) –“Contract” revision (end of 2010), after user workshops and the next EIC AC meeting “Design Manual” –A 20 to 30 page document, archived in web –Explanation of high level design choices –Main and secondary parameters, schemes –Major components, and interfaces between them Action items –Finish “action items/decision points” in about a week each –Work scope Collecting information/references Performing estimations/calculations if applicable Formulate a solution/recommendation Present in ELIC R&D meeting Write a (minimum) half page on each item for the “design manual” Similar Action Item: Detector/IR document Slide from Yuhong Zhang

MEIC/ELIC Design Process - Status Near-term design concentrates on parameters that are within state-of-the-art (exception: small bunch length & small vertical  * for proton/ion beams) Detector/IR design has concentrated on maximizing acceptance for deep exclusive processes and processes associated with very-forward going particles (detect remnants of struck quark & spectator quarks!) Exact energy/luminosity profile still a work in progress Summer 2010: MEIC design review followed by internal cost review (and finalizing input from user workshops) Many parameters related to the detector/IR design seem to be well matched now (crossing angles, magnet apertures/gradients/peak fields, field requirements), such that we do not end up with large “blind spots”.

Electron-Ion Collider – Roadmap beyond JLab user EIC workshops EIC (eRHIC/ELIC) webpage: Weekly meetings at both BNL and JLab Wiki pages at & EIC Collaboration has biannual meetings since 2006 Last EIC meeting: January 10-12, Stony Brook Next meeting: July 29-31, Catholic University, DC Long INT10-03 Institute for Nuclear Theory, centered around spin, QCD matter, imaging, electroweak Sept. 10 – Nov. 19, 2010 Periodic EIC Advisory Committee meetings (convened by BNL & JLab) After INT10-03 program (2011 – next LRP) need to produce single, community-wide White Paper laying out full EIC science program in broad, compelling strokes and need to adjust EIC designs to be conform accepted energy-luminosity profile of highest nuclear science impact followed by an apples-to-apples bottom-up cost estimate comparison for competing designs, folding in risk factors and folding in input from ongoing Accelerator R&D, EICAC & community

Backup

Quotes from EICAC Report on Accelerator R&D Priorities Highest priority:  Design of JLab EIC  High current (e.g. 50 mA) polarized electron gun  Demonstration of high energy – high current recirculation ERL  Beam-Beam simulations for EIC  Polarized 3He production and acceleration  Coherent electron cooling High priority, but could wait until decision made:  Compact loop magnets  Electron cooling for JLab concepts  Traveling focus scheme (it is not clear what the loss in performance would be if it doesn’t work; it is not a show stopper if it doesn’t)  Development of eRHIC-type SRF cavities Medium Priority:  Crab cavities  ERL technology development at JLAB Slide from Steve Vigdor

EIC – JLab User Meetings Roadmap March 12 + Electron-Nucleon Exclusive Reactions March 14 + Partonic Transverse Momentum in Hadrons: Quark Spin-Orbit Correlations and Quark-Gluon Interactions April 07, 08, Nuclear Chromo-Dynamic Studies May 17 Electroweak Studies June 04 + MEIC Detector Workshop June 07,08, JLab Users Group Meeting In parallel: MEIC/ELIC design worked out following highest EICAC (Nov meeting) recommendation related to accelerator Energy-Luminosity profile of EIC design will likely be optimized over time to adjust to novel accelerator science ideas & the nuclear science case  For now we assume a base luminosity, say e-ions/cm 2 /s  Fold in what energies are needed for e.g. L/T separations, imaging, range in Q 2 required at fixed x given y cuts, etc.  Study what luminosity is required at what energies to optimize the science output, and fold in implications for the detector/acceptance

EIC Project - Roadmap YearCEBAF UpgradeElectron-Ion Colldier st CEBAF at Higher Energies Workshop 1996 (LRP)CEBAF Upgrade an Initiative ~2000Energy choice settled, “Golden Experiments” 1 st workshops on US Electron-Ion Collider 2002 (LRP)JLab 12-GeV Upgrade 4 th recommendation Electron-Ion Collider an Initiative 2007 (LRP)JLab 12-GeV Upgrade highest recommendation Electron-Ion Collider “half-recommendation” 2010EIC “Golden Experiments”??? 2013? (LRP)JLab 12-GeV & FRIB construction highest recommendation? EIC a formal (numbered) recommendation? 2015JLab 12-GeV Upgrade construction complete EIC Mission Need, formal R&D ongoing? 2025?EIC construction complete?