M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 The FCC-ee machine Michael Koratzinos, University of Geneva SEVENTEENTH LOMONOSOV CONFERENCE.

Slides:



Advertisements
Similar presentations
Introducing LEP3 zero M. Koratzinos TLEP3 day, 9 January2013.
Advertisements

Beam-Beam Effects for FCC-ee at Different Energies: at Different Energies: Crab Waist vs. Head-on Dmitry Shatilov BINP, Novosibirsk FCC-ee/TLEP physics.
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
European Strategy for Particle Physics 2013 Preparatory group->Strategy group Individual town meetings Town meeting in Krakow: september 2012 Drafting.
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
Luminosity Prospects of LHeC, a Lepton Proton Collider in the LHC Tunnel DESY Colloquium May F. Willeke, DESY.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
Patrick Janot Introduction  TLEP / FCC-ee u Physics, Experiments, Detectors break-out session l Conveners: Alain Blondel, Patrick Janot è Follows six.
Beam-Beam Optimization for Fcc-ee at High Energies (120, 175 GeV) at High Energies (120, 175 GeV) Dmitry Shatilov BINP, Novosibirsk 11 December 2014, CERN.
Working Group 3 Summary M. Sullivan / Y. Funakoshi.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
‘’Wisdom is the child of wonder’’ Happy New Year 2014!
March 2011Particle and Nuclear Physics,1 Experimental tools accelerators particle interactions with matter detectors.
Future Accelerators at the energy frontier Peter Hansen february 2010 University of Copenhagen.
Round-table: Discussion on Future Machines. With the discovery of the Higgs Boson Self-consistent model (SM) accounting for all Particle Physics phenomena.
The FCC Magnet Program: Challenges and Opportunities for HTS
Future Accelerators at the High Energy Frontier
M. Koratzinos, ICNFP2014, 5/8/2014 CERN: the next 60 years (the FCC study) Picture courtesy: Jörg Wenninger Michael Koratzinos, UNIGE and CERN 3rd International.
HF2014 Workshop, Beijing, China October 9 th -12 th, 2014 Constraints on FCC-ee lattice design Bastian Haerer Constraints on the.
The time line Autumn 2011CERN Council initiated an update exercise to the European Strategy for Particle Physics which was approved by a special Council.
1 Tunnel implementations (laser straight) Central Injector complex.
1 Physics Input for the CLIC Re-baselining D. Schulte for the CLIC collaboration.
Flat-beam IR optics José L. Abelleira, PhD candidate EPFL, CERN BE-ABP Supervised by F. Zimmermann, CERN Beams dep. Thanks to: O.Domínguez. S Russenchuck,
Plan for Review of FCC- ee Optics and Beam Dynamics Frank Zimmermann FCC-ee Design Meeting 31 August 2015.
1 BINP Tau-Charm Project 3 February 2010, KEK, Tsukuba E.Levichev For the BINP C-Tau team.
30 April 2014FCC-ee Physics Coordination meeting1 WELCOME to the 1st coordination meeting «Experiments at the FCC-ee» Within the FCC-ee DESIGN STUDY.
1 Experience at CERN with luminosity monitoring and calibration, ISR, SPS proton antiproton collider, LEP, and comments for LHC… Werner Herr and Rüdiger.
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Inputs from GG6 to decisions 2,7,8,15,21,27,34 V.Telnov Aug.24, 2005, Snowmass.
Glion Colloquium / June Accelerating Science and Innovation R.-D. Heuer, CERN HL-LHC, Aix-les-Bains, 1 Oct ECFA HL-LHC Experiments Workshop.
M. Koratzinos, HKUST Jockey Club Institute of Advanced Study, January 2016 Challenges of modern e+e- colliders Michael Koratzinos, University of.
30 April 2014FCC-ee Physics Coordination meeting1 FCC-- ee coordination meeting 12 Nov 2015 Brief news.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement High Efficiency Work.
Lattice design for FCC-ee Bastian Haerer (CERN BE-ABP-LAT, Karlsruhe Institute of Technology (KIT)) 1 8 th Gentner Day, 28 October 2015.
Transverse polarization for energy calibration at Z-peak M. Koratzinos With valuable input from Alain Blondel ICFA HF2014, Sunday, 12/10/2014.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
Salam, NTU Singapore, Peter Jenni (Freiburg and CERN) LHC, Higgs and Beyond (part II - ATLAS) 1 Dijet mass of 8.8 TeV The future of particle.
Problems of charge compensation in a ring e+e- higgs factory Valery Telnov Budker INP, Novosibirsk 5 rd TLEP3 workshop, FNAL, July 25, 2013.
Optics with Large Momentum Acceptance for Higgs Factory Yunhai Cai SLAC National Accelerator Laboratory Future Circular Collider Kick-off Meeting, February.
HF2014 Workshop, Beijing, China 9-12 October 2014 Constraints on FCC-ee lattice design Bastian Haerer Constraints on the FCC-ee.
HF2014 Workshop, Beijing, China 9-12 October 2014 Challenges and Status of the FCC-ee lattice design Bastian Haerer Challenges.
Please check out: K. Ohmi et al., IPAC2014, THPRI003 & THPRI004 A. Bogomyagkov, E. Levichev, P. Piminov, IPAC2014, THPRI008 Work in progress FCC-ee accelerator.
Choice of circumference, minimum & maximum energy, number of collision points, and target luminosity M. Koratzinos ICFA HF2014, Thursday, 9/10/2014.
BINP tau charm plans and other projects in Turkey/China A. Bogomyagkov BINP SB RAS, Novosibirsk.
1 FCC-ee as Higgs Factory Jörg Wenninger CERN Beams Department Operation group - LHC 23/07/2014 Future Circular Collider Study Acknowledgments to my FCC-ee.
FCC-ee injector complex including Booster Yannis Papaphilippou, CERN Thanks to: M.Aiba (PSI), Ö.Etisken (Ankara Un.), K.Oide (KEK), L.Rinolfi (ESI-JUAS),
Note presentation: Performance limitations of circular colliders: head-on collisions M. Koratzinos TLEP ACC meeting no. 8, 25/8/2014.
News from the interaction region study Bernhard Holzer, Anton Bogomyagkov, Bastian Harer, Rogelio Tomas Garcia, Roman Martin, Luis Eduardo Medina Presented.
FCC-ee Interaction Region design
Visit to IHEP September 2015: recommendations for CEPC
1st FCC Infrastructure & Operation meeting
FCC summary report March 2015 Washington.
Future Circular Collider
CLIC Klystron-based Design
Future Collider Projects at CERN
Luminosity Optimization for FCC-ee: recent results
CEPC-SppC Accelerator CDR Copmpletion at the end of 2017
CEPC partial double ring scheme and crab-waist parameters
Comparison of the final focus design
LHC (SSC) Byung Yunn CASA.
Interaction Region Design Options e+e- Factories Workshop
SuperB CDR Machine P. Raimondi for the SuperB Team Paris, May 9, 2007.
Parameter Optimization in Higgs Factories Beam intensity, beam-beam parameters, by*, bunch length, number of bunches, bunch charge and emittance.
Beam-Beam Effects in High-Energy Colliders:
SuperB IRC Meeting Frascati, Nov. 13th 2007
M. E. Biagini, LNF-INFN SuperB IRC Meeting Frascati, Nov , 2007
Power Consideration of CEPC
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Presentation transcript:

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 The FCC-ee machine Michael Koratzinos, University of Geneva SEVENTEENTH LOMONOSOV CONFERENCE ON ELEMENTARY PARTICLE PHYSICS

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 Contents Why? A bit of history Principles of circular machines FCC-ee major design considerations/challenges? Something extra 2

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 Acknowledgements I would like to thank –the pioneers of the modern circular Higgs factory idea: Roy Aleksan, Alain Blondel, John Ellis, Patrick Janot, Frank Zimmermann –The whole FCC community –In particular A. Blondel, M. Benedikt, F. Zimmermann, K. Oide, A. Butterworth, D. Shatilov and the whole team at BINP, Novosibirsk for the liberal use of material 3 A. Blondel F. Zimmermann M. Koratzinos J. Ellis P. Janot R. Aleksan

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 Why? 4

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 The backdrop The Standard Model is complete, but it is not a complete theory Major problems: –What is the origin of lepton/baryon asymmetry? –What is the origin of dark matter? –What is the nature of neutrinos? –What is the solution to the hierarchy problem? –(plus even more profound questions) 5

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 Where is the new physics? The Higgs is light and SM-like No indication of new physics so far => the energy scale of new physics (Beyond the Standard Model) Λ has been pushed above ~few×100GeV The new LHC run will extend this by a factor ~2 A new project will be needed to push the Λ reach to O(10) to O(100)TeV (although there is no guarantee of discovery, the fine-tuning needed goes with the square of Λ, making the SM increasingly problematic) 6

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 Precision needed – Higgs sector 7 Therefore the Higgs boson couplings need to be measured with a per-cent accuracy or better to be sensitive to 1 TeV new physics, and with a per-mil accuracy to be sensitive to multi- TeV new physics.

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 A possible strategy 1.A first step could require a facility that would measure the Z, W, top-quark and Higgs-boson properties with sufficient accuracy to provide sensitivity to new physics at a much higher energy scale. 2.This strategy could then be followed by a second step that would aim at discovering this new physics directly, via access to a much larger centre-of-mass energy than the LHC. 3.(The details of the optimal strategy for the next large facility can only be finalized once the results of the LHC run at TeV are known.) 8 The FCC project answers points (1) and (2) above: a new circular tunnel can house a high-luminosity Z,W,t,H factory (E CM 90 to 350GeV) and later on a 100TeV collider

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 How much luminosity is needed? The desire from our experimental colleagues to make full use of expected accuracies, translates to the following table with the desired statistics. The question is, what kind of luminosities can be achieved and, therefore, how long would this physics programme have to be? 9 No. of events Time with 4 IPs (years) Time with 2 IPs (years) × × × See talk by D. d’Enterria, this conference (Answer: with the luminosities that will be presented, ~10 years of physics will cover these physics goals) Z W H t

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 History of the FCC and milestones: from an idea to an international collaboration 10

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 A brief history 11 In 1982, when the then Prime Minister Margaret Thatcher visited CERN, she asked the then CERN Director-General Herwig Schopper why CERN was building a circular collider rather than a linear one up to a CM energy of at least ~350GeV the circular collider with superconducting RF is the cheapest option Schopper’s argument: cost of construction Herwig Schopper, private communication, 2014

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 The brief history of FCC 12 Following a recommendation of the European Strategy report, in fall 2013 CERN Management set up the FCC project, with the main goal of preparing a Conceptual Design Report by the time of the next European strategy update (~2018) Links established with similar studies in China and in the US, already a series of successful workshops First international discussions: HF2012 at Fermilab: The paper that revived the idea: arXiv: [hep-ex]arXiv: FCC kick-off meeting took place on February 2014 at University of Geneva Very successful, almost 350 participants, strong international interest

13 Future Circular Collider Study Michael Benedikt CERN, 26 th May 2014 with emphasis on proton-proton and electron-positron high- energy frontier machines. These design studies should be coupled to a vigorous accelerator R&D programme, including high-field magnets and high- gradient accelerating structures, in collaboration with national institutes, laboratories and universities worldwide. (The committee urges CERN)...“to propose an ambitious post-LHC accelerator project at CERN by the time of the next Strategy update”: d) CERN should undertake design studies for accelerator projects in a global context, European Strategy Update 2013 Extracts: Design studies and R&D at the energy frontier

14 Future Circular Colliders Michael Benedikt 2015 Higgs Hunting, Orsay International FCC collaboration (CERN as host lab) to study: pp-collider (FCC-hh)  main emphasis, defining infrastructure requirements km infrastructure in Geneva area e + e - collider (FCC-ee) as potential intermediate step p-e (FCC-he) option ~16 T  100 TeV pp in 100 km Future Circular Collider Study GOAL: CDR and cost review for the next ESU (2018)

15 Future Circular Colliders Michael Benedikt 2015 Higgs Hunting, Orsay 90 – 100 km fits geological situation well LHC suitable as potential injector 90 – 100 km fits geological situation well LHC suitable as potential injector Site studies First look at geology: Tool exists J. Osborne & C. Cook

16 Future Circular Colliders Michael Benedikt 2015 Higgs Hunting, Orsay Collaboration Status 58 institutes 22 countries + EC Status: July 30, 2015 FCC International Collaboration FCC International Collaboration

17 Future Circular Collider Study Michael Benedikt CERN, 26 th May 2014 FCC Kick-off Meeting University of Geneva February 2014 ~340 participants

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 …if the FCC was build in Moscow 18

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 Principles of circular machines 19

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 The circular e+e- collider approach What kind of luminosities can be achieved? How big a ring needs to be? How much power will it consume? 20 For the high luminosities aimed at, the beam lifetimes due to natural physics processes (mainly radiative Bhabha scattering) are of the order of a few minutes – the accelerator is ‘burning’ the beams up very efficiently A “top-up” scheme (a la B factories) is a must injector Booster ring Main ring A. Blondel Booster ring the same size as main ring, tops up the main ring every ~O(10s) Main ring does not ramp up or down

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 Luminosity of a circular lepton collider 21

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 The beam-beam parameter (closely related to tune shift) is a measure of the blow-up of one beam as it goes through the other and has a maximum value on every implementation Increasing the beam current or squeezing more when the beam-beam limit has been reached will not increase luminosity The more damping in the machine (higher energy, smaller radius) the higher the maximum beam-beam parameter The maximum beam-beam parameter has been a limit in the performance of circular e+e- accelerators for the last 50 years… 22

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 Beamstrahlung 23

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 Can we do better? Using the crab waist scheme we can gain substantially wrt the beam-beam limit 25 z e+e+ e-e- x βyβy  P. Raimondi, 2006 – Piwinski angle, should be >> 1 Colliding at an angle, with long beams suppresses instabilities (in other words the machine can operate at larger beam- beam values) Beam-beam Beamstrahlung Beam energy yy allowed

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 CW has an advantage in beam stability Typical tune scan for CW scheme with high beam-beam parameter (~0.2) for a Super c-  factory 26 Tune scan for FCC-ee head-on collision scheme without CW (120 GeV) Tune scans: blue: resonances, beams disappear quickly Red: safe area, possible running point

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 FCC-ee luminosity vs energy Ph. Lebrun 27 ZWH crab waist & improved parameters baseline / IP / IP A. Bogomyagkov, E. Levichev, D. Shatilov The crab waist approach looks very promising and might well become our baseline approach

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 Advertised luminosity of e+e- colliders 28 LEP1: 0.2×10 32 LEP2:1.2×10 32 Linear colliders: energy reach Circular colliders: high lumi for Z,W,t,H Crossover: ~ GeV

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 Challenges of modern circular colliders 29

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 Circular colliders: challenges Although the technology used is mature and used for 50 years… To squeeze the maximum possible luminosity there are a number of challenges: –Very small emittances although the rings are very large –Large momentum acceptance –The Interaction Region optics are complex –100MW of SR power needs to be managed –Energy efficiency is important for responsible power management – currently the RF system has an efficiency (wall to beam) of 50% - we would like to have this figure increased Not to be underestimated the political and financial challenges for making the project a reality 30

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 Emittances 12/10/2015 8th FCC-ee Physics Workshop - Paris - J. Wenninger 31  Low emittances (especially vertical) is essential for delivering the luminosity promised and for mitigating the beamstrahlung problem  FCC-ee is a very large machine, scaling of achievable emittances (mainly vertical) is not straightforward (Coupling, spurious vertical dispersion).  Low emittances tend to be more difficult to achieve in colliders as compared to light sources or damping rings (beam-beam) R. Bartolini, DIAMOND FCC-ee LEP2  FCC-ee parameters: o  y /  x = or 0.002, o  y ≥  2 pm with a ring ~ larger than a typical light source.  Very challenging target for a ring of this size! Emittances of past and future machines

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 SR spectrum and absorption Some critical photon energies: superKEKb: ~2keV (LER) FCC-hh: ~5keV LEP1: ~70keV LEP2: ~700keV (arc) FCC-ee: ~350keV (arc, 175GeV) 32 H. Burkhardt <10keV easy >100keV difficult >10MeV impossible Most importantly: minimize the amount of SR radiation shining at the experiments and its critical energy

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 An example optics around the IR IP Local CCS + 30 mad crossing + crab waist + solenoids Local CCS + Crab Waist These plots of beam optics are not always the latest ones. K. Oide Very long straight section, ∼ km / IP, max. beam separation ~25m

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 SR (power and critical energy) at the IR IP keV kW u c P SR /dipole These plots of beam optics are not always the late ones. K. Oide The critical energy and power of the SR from the dipoles looks manageable

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 A zoom close to the IR: main, compensating and screening solenoids 35 Main detector solenoid Quad screening solenoid Compensati ng solenoid Final quads This is a very complex layout with stringent space limitations that needs a strong coordinated effort The 30mrad crossing angle together with the detector solenoid and the small L* will result in emittance blow-up if no measures are taken

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 Power consumption It is more efficient to run at maximum power for the shortest period of time One of the first choices was to operate the FCC-ee at 100MW of SR lost for both beams The power consumption of the whole facility would be 300MW+ This is a high energy consumption (~1TWh per year, costing ~50MCHF at current CERN contract prices), but still corresponds to less than 1% of the construction cost of the facility per year But “energy costs might not be a true reflection of its value to society”, so every effort should be made to reduce this number Largest consumer: RF system, where our efforts must be concentrated 36

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 RF power consumption One single efficiency that, if improved, would have the largest impact: RF power source efficiency Klystron efficiency currently ~65%, R&D to take this to ~90% Other technologies: IOTs (inductive Output Tube), Solid state amplifiers 37 wall plug AC/DC power converter RF power source useable RF beam loss Φ & loss Modulator η≈ 93% Klystron saturation η ≈ 64% IOT η ≈ 65% overhead for LLRF, Q o, Q ext, HOM power, power distribution,… ~50% of wall plug power

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 Before I finish 38

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 A tunnel to house a Higgs factory exists today somewhere closer than you think 39 A very wide 21km tunnel exists in the Moscow region! It is 30% smaller than LEP, so the RF voltage needed at 120GeV would be a bit more than the RF voltage needed fro FCC-ee running at 175GeV (~10GV) The achieved luminosity would be a factor of ~3 less than FCC-ee …but the tunnel (representing ~30% of the cost) is there! A very wide 21km tunnel exists in the Moscow region! It is 30% smaller than LEP, so the RF voltage needed at 120GeV would be a bit more than the RF voltage needed fro FCC-ee running at 175GeV (~10GV) The achieved luminosity would be a factor of ~3 less than FCC-ee …but the tunnel (representing ~30% of the cost) is there!

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 The UNK tunnel to house a Higgs factory? 40 …but infrastructure is missing Tunnel is very wide…

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August 2015 Conclusions The FCC-ee project offers unique opportunities to further explore Nature… …by changing the name of the game of precision physics – it offers unprecedented statistics at an E CM of 90 GeV (Z), 160 GeV (W), 240 GeV (ZH) and 350 GeV (tt) It is based on mature technology Work on the CDR has already started And it paves the way for a 100TeV hadron collider 41

Is history repeating itself…? When Lady Margaret Thatcher visited CERN in 1982, she asked the then CERN Director-General Herwig Schopper how big would the next tunnel after LEP be. Herwig Schopper, private communication, 2013; curtesy F. Zimmermann Margaret Thatcher, British PM Herwig Schopper CERN DG built LEP John Adams CERN DG & built PS & SPS Was lady Thatcher right? Dr. Schopper‘s answer was there would be no bigger tunnel at CERN. Lady Thatcher replied that she had obtained exactly the same answer from Sir John Adams when the SPS was built 10 years earlier, and therefore she did not believe him.

M. Koratzinos, 17 th Lomonosov Conference, Moscow, 25 August End Thank you