IBTTA April 19, 2009 Bay Area Toll Authority San Francisco-Oakland Bay Bridge East Span Seismic Replacement Project
Loma Prieta Earthquake (1989)
New East Span of San Francisco-Oakland Bay Bridge
Self Anchored Suspension Span (SAS)
A long history…. Extensive Public Input Multiple Design Alternatives Multiple Administrations September 11 Single Bid
On the right track…. Accountable Project Delivery –AB 144 established the Toll Bridge Program Oversight Committee, composed of Director of the California Department of Transportation (Caltrans), and the Executive Directors of the California Transportation Commission (CTC) and the Bay Area Toll Authority (BATA), to be accountable for delivering the seismic project. WILL KEMPTON Director California Department of Transportation STEVE HEMINGER Executive Director Bay Area Toll Authority Bimla Rheinhart Executive Director California Transportation Commission
2.25 miles ZPMC - Shanghai, China
ZPMC Fabrication Facilities
Shop Drawing Preparation Sub-Assemblies Fabrication Segment Assembly Blast, Paint & Fit Up Ready To Ship Shop Drawing Preparation Sub-Assemblies Fabrication Segment Assembly Blast, Paint & Fit Up Ready To Ship
Steel Roadway Decks Steel Roadway Boxes Under Fabrication
Roadway Deck Fabrication Shop Steel Roadway Boxes Under Fabrication
Steel Roadway Decks Steel Roadway Boxes Under Fabrication
Steel Roadway Boxes Ready for Fit-up
Tower Leg Fabrication
Tower Leg in Rotating Jig
Fabrication Inspection
1,700 Ton Shear-leg Crane Barge Undergoing testing
Shear-leg Crane Barge Arrival in San Francisco Bay
Temporary Supports Temporary Support Structures
Temporary Support Truss Looking East Temporary Support Structures
Yerba Buena Island Detour Construction
Stage 1 - Skid Beams and Temporary Support
Stage 2 – Construct New Roll-in Truss
Stage 3 – Complete Roll-in Truss
Stage 4 – Close Bridge and Cut Loose Roll-out Truss
Stage 5 – Roll-out Existing Truss
Stage 6 – Roll-in New Truss
Stage 7 – Open Detour to Traffic
Yerba Buena Island Detour Construction
Oakland Touchdown Under Construction
Completed Skyway
Skyway (2007) Completed Skyway