1 HBD Air Cooling System TK Hemmick for the HBD group 8/25/06.

Slides:



Advertisements
Similar presentations
Extrusion-Based Processes
Advertisements

1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
HVACR316 - Piping Piping and Fitting.
April 7, 2010D.R. Lynch 1 PHENIX Shutdown 2010 April 7,2010 Don Lynch.
Investigating the Temperature of Air
Gas Welding (Oxy-acetylene)
WACH4 26/11/2002Julien Cogan CERN/EP/CMA-1- M0 COOLING IN H4 Cooling is a key issue : –APD gain : ~ -2.4 % /  C –XTAL response (scintillation) : ~ -1.9.
19 May 2015 AirGuard Protection System Protection units for compressed air.
Thermal Analysis of short bake out jacket version 1 12-Nov-2013.
New Mexico FFA Agricultural Mechanics Career Development Event Plumbing.
POWER PLANT.
Steel Pipe Plumbing Systems
Hydronic Mechanical Controls
2006 Oct. 19 DES Project -- Vaidas Simaitis, University of Illinois1 DHE – Detector Head Electronics Monsoon 80mm Crate Heat Load.
Scavenging System A&A Pg 356  To reduce exposure to waste anesthetic gases  Can be active or passive scavenging system Active Scavenging System  Connected.
1 Some Water Extreme Calculations TK Hemmick for the Tent Crew.
Pipe Sizing Sizing Gas Pipe for Low-Pressure Systems
Engineering Models 1 By: Ross King & Daniel Luddeke.
Central Region Discussion Power and Cooling GDE Beijing-CFS.
Mounting Direction Water Cooler Best solution OK Risk of air bubbles in the system Heatsink Water channels Inlet Outlet.
FEASIBILITY OF COMPONENTS CLARA ECHAVARRIA & JONATHON LOCKE.
1 Jim Thomas - LBL Latest News on Cooling the SSD Jim Thomas Lawrence Berkeley National Laboratory 1/21/2011.
Automotive Algebra Maintaining the cooling system Using Algebra for a simple solution Joe Agruso,Xochitl Molina.
Batteries The purpose of the battery is to act as a reservoir for storing electricity.
1 Calorimeter Thermal Analysis with Increased Heat Loads September 28, 2009.
NSTX TF Bundle & Center Stack Curing Oven Mike Viola Joe Rushinski Frank Jones April 14, 2003.
1 On Rate for Fuel Oil Equipment. 2 Purpose To insure that the equipment is delivering the correct heating value Oil fired equipment must fire within.
NCSX Helium Bakeout System M. Kalish 3/25/02
Calorimeter Analysis Tasks, July 2014 Revision B January 22, 2015.
7.3.5 Student Book © 2005 Propane Education & Research CouncilPage Identifying the Function and Characteristics of Draft Fans & Controls High efficiency.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
HVAC523 Piping and Fittings.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
What are common results of heat transfer? Case #1, no phase transition or work done. How much does the temperature vary? Heat is energy in transit! Positive,
LiH Casting & Testing1 Lithium Hydride Disc Casting & Testing Approaches C. M. Lei March 2, 2007.
Hall D Cryostat Heat load and Flow calculations What are we doing ? 1. Measuring the heat leak into the magnet for all the 4 coils 2. Determining of number.
20 th June 20111Enrico Da Riva, V. Rao Project Request and Geometry constraints June 20 th 2011 Bdg 298 Enrico Da Riva,Vinod Singh Rao CFD GTK.
NEWTON Objective: Describe five types of commercially available pipe and tubing : steel pipe, ductile iron pipe, steel tubing, copper tubing, and plastic.
HVACR116 – Trade Skills Pipe Sizing Sizing Gas Pipe for Low-Pressure Systems.
SC Project Review of NCSX, April 8-10, 2008 NCSX Coil Services P.L. Goranson Work Package 161.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
CLIC Prototype Test Module 0 Super Accelerating Structure Thermal Simulation Introduction Theoretical background on water and air cooling FEA Model Conclusions.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
1 Jim Thomas - LBL A New Proposal for Cooling the SSD Jim Thomas Lawrence Berkeley National Laboratory 10/27/2008.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
Proprietary Material – Innovative Research, Inc. Hands-On Use System-level analysis of an air-cooled cabinet  Model will be set up for successively complex.
Automotive Engines: Theory and Servicing, 7/e By James D. Halderman Copyright © 2011, 2009, 2005, 2001, 1997 Pearson Education, Inc., Upper Saddle River,
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
CO2 Cooling For the CMS Pixel detector 11 November 20081Hans Postema & Antti Onnela.
NSTX OH Coil Optimization Ali Zolfaghari. Optimization Parameters: Coolant channel diameter –Larger coolant diameter will lead to coil temp above 100°
© 2012 MITSUBISHI HEAVY INDUSTRIES – MAHAJAK AIR CONDITIONERS CO., LTD. All Rights Reserved. Bad case of Installation RAC-B-A07.
Manoj kumar 2009JE0406 Mining machinery engineering.
Eliminator 38 Pounds 19,100 BTU’s 200 CFM 15amp outlet compliant amps per heat elements Precise Temperature Settings Years of Field Testing Listed.
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
WBS Readout Infrastructure Craig Dukes University of Virginia Bill Gilbert University of Minnesota CD2/3a DOE Review of NO  A October 23-25, 2007.
ARÇELİK TİCARİ KLİMA EĞİTİM DÖKÜMANI APPENDIX.
SPS High Energy LSS5 Thermal contact & cooling aspects
Power consumption (Watts) LBB27 ROS18 TSC50 TIM8 1 SC crate416 Alignment20 TOTAL per rack906~1 kW X2J22X2J02 With a water flow of 10 l/min, it should.
Chapter 14 Heating, Ventilation & Air conditioning (hvac)
Fixed Orifice Tube Cycling Clutch System (FOTCC)
For the CMS Pixel detector
BCP Analysis Update Thomas Jones 22/7/16.
Thunderbird Water Pump Upgrade
Tracer Applications.
STUB configuration Mats Pålsson
Grid A plastic grid covers the open end of a cylindrical vessel containing water. The grid is covered and the vessel is turned upside down. What is the.
For the CMS Pixel detector
Presentation transcript:

1 HBD Air Cooling System TK Hemmick for the HBD group 8/25/06

2 Why is Cooling Needed?  The noise debugging of the HBD showed that RF shield covers must be applied above the pre-amp cards.  These covers give excellent noise performance but trap heat.  The pre-amps & LDO regulators reach C.  These temperatures are not a fire hazard, but they would limit the lifetime of the pre- amps.  So…we designed a way to cool them.

3 How can cooling be accomplished?  The covers: Block normal convention (the problem). Form a channel for air (the solution).  There are 6 covers around the azimuth and 6 gaps between the covers.  The gaps have sufficient room for a 3/8” tube from which to supply air. How much air? How to deliver air?

4 Overview of Information  System requirements: Power load handling.  Amount of air required (theory)  Amount of air required (measurement) Air handling system.  Pressure & Flow (theory)  Pressure & flow (measurement)  System parts (Prototype & Proposal) Exploded view of parts. Materials list. MSDS links.

5 Power load.  One preamp card requires: +6V at 1.8 A -6V at 1.2 A 18 Watts  LDO regulators on board can handle higher temp, preamps cannot. Pre-amps = +5V at 1.8 A & -5V at 1.2 A 15 Watts.  Air flow should remove 15 Watts from every board.

6 Air requirements (theory)  One board…  15 Watts = 15 Joules/sec.  Air can be approximated well as an ideal diatomic gas (C P =7/2 R)  15 Joules in one second.  Allow 20 degree rise.  Requires 0.64 liters in one second.  Requires ~40 l/min~80 cfh NOTE: Upper limit (ignores natural convective cooling)

7 Air requirements (measurement)  One circuit card was outfitted with a small tube to spread air flow over card.  Tube = 3/8” diameter, 2.5” water, 5 small holes (uniform flow w/ reasonable pressure & small holes)  Pre-amp temp as a function of flow is plotted.  50 cfh is good target for cooling each board.  6 board per side = 300 cfh = 5 cfm per side.

8 Pressure and Flow (theory)  P in final tube = 2.5” water P tot <0.2” water to assure uniform air delivery. F = 5 cfm, L=15” (conservative) =1.8x10 -5 Pascal x sec r = 0.26 inches (d=0.52 inches).  Flow is not purely laminar… Set ID of tubing to ¾” F 5/6 F 4/6 F 3/6 F 2/6 F 1/6 F

9 Pressure & Flow (measurement-1)  Assemble prototype manifold.  All tubing dimensions correct.  Measure air flow parameters.

10 Pressure & Flow (measurement-2)  Measured parameters: 5 cfm flow. Pressure in tubes = 2.5” water. 0.1” water difference from first to last tube. 6” water is pressure at supply.  Design parameters met exactly. 100% success. Air flow uniform in all holes.

11 Exploded (Prototype) Part List  Tubing ¾” ID Poly-flow tubing ½” ID Latex (surgical) tubing  Nylon plumbing TEE, coupling; hose barb; elbow; cap.  PTEG Plastic: 3/8” nominal tubing. Link pointing to MSDS Files:

12 Example Commercial Blower…  The above small (2” x 2”) commercial blower meets all the specifications for our needs.  This will be evaluated and compared to other similar units.  Blower selection will be discussed separately.

13 Proposed System  Manifold: PVC pipe, ¾” ID, running underneath HBD cable tray. Nylon NPT  3/8”Hose Barb at 6 locations.  Jumper (manifold  individual tube) 3/8” latex surgical tubing.  Flow tube: 3/8” ID mylar tube (0.010” thick wall) Nylon cap.