131211975432 6’ tall Empty space below this metal sheet 66’ 14’ 4’ 10’ Ceiling tiles = 24 Concrete blocks 14’ long There are two “styles” of Ceiling tile,

Slides:



Advertisements
Similar presentations
Architectural Drawing
Advertisements

Microwave Tubes.
Geometry Unit Project 6th grade.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Accelerator Laboratory 1 CFS Review of Asian Region (S. Fukuda) June 1/2010 DRFS HLRF System KEK S. Fukuda Introduction: Basic Concept of DRFS Progress.
FAA/NASA Joint University Program for Air Transportation Research Jeff Dickman Chris Bartone June 20, 2003 A New Anechoic Chamber for Nearfield Antenna.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate.
Carlos A. Martins ESS – Accelerator Division - RF Electrical Power Systems August 19 th, 2015 C4 – RF sources and related.
Air / Sound Lock Iso-Booth Mix Tape EFX Step Up ~18” Raised floor in CR Glass GLASSGLASS Bulkhead Plate with inputs to board below glass EFX rack also.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Upgrade Injector Test Facility: UITF Why Build It? HDIce commissioning Bubble chamber physics with Bremsstrahlung x-rays: photo-disintegration of oxygen.
MC Beamline Tom lackowski L1 Manager. Project Organization Jan. 2013T. Lackowski - MC Beamline2.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
David Regidor, Moisés Weber (CIEMAT, Madrid, Spain) The IFMIF-EVEDA Accelerator Prototype will be a 9MeV, 125mA CW deuteron accelerator to validate the.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF Project Status Meeting Matt Poelker July 31, 2015.
February 17-18, 2010 R&D ERL Alex Zaltsman R&D ERL High Power RF Systems Alex Zaltsman February 17-18, 2010 High Power RF Systems.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Anders Sunesson RF Group ESS Accelerator Division
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
Low Energy RHIC e - Cooling Meeting Minutes – 11/19/14 1. Cooling Section Magnets and Power Supplies –Most of power supplies will be from ERL (R. Lambiase).
Grounding Guidelines Developed for LBNE
Aug 23, 2006 Half Current Option: Impact on Linac Cost Chris Adolphsen With input from Mike Neubauer, Chris Nantista and Tom Peterson.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF Project Status Meeting Matt Poelker October 21, 2015.
L-band test stations in End Station B Richard Swent.
1 Collaboration Meeting 33 - Glasgow 26 th June 2012 Design Layout Andrew Moss for Alan Grant, STFC.
12 GHz Stand alone power source at CERN G.McMonagle AB/RF.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Re-scoping UITF Matt Poelker November 14, 2015.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
Xbox and Structure testing news N. Catalan Lasheras, R. DeGiovanni, J. Giner-Navarro, G. Mcmonagle, I. Syratchev, B. Wooley, X. Wu
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
CMTF GROUNDING FOR PIP-II K. Carlson PXIE Electrical Coordination Meeting December 19 th, 2013.
PX FY14 Budget PXIE Infrastructure R. Stanek J. Leibfritz.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting What we started with… UITF as imagined Upgraded Injector Test Facility - UITF.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting What we started with… UITF as imagined Upgraded Injector Test Facility - UITF.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Upgrade Injector Test Facility: UITF Why Build It? HDIce commissioning Bubble chamber physics with Bremsstrahlung x-rays: photo-disintegration of oxygen.
Name ____________Class_____ Date______ Area of Rectangles The ________ _ of a figure is the amount of surface it covers. It is measured in ________ __.
Report Technical Director Storage-Ring-Installation Completed
RF Systems and Controls for the LERF CM Tests
RF cell Anders Sunesson RF group leader
Cryomodule test stand at ESS site
CATHODE RAY OSCILLOSCOPE
LERF as Cryomodule Testing Facility Set-Up and Installation Logistics
Schedule CM SPS G.Vandoni.
Update of MVD services and requests
E4 hall technical specifications
CLEX* Status and Plans CTF3 complex CLEX
Construction and Commissioning of Electronic Test Benches
UITF – Upgrade Injector Test Facility
352MHz Klystron Control for the 3MeV Linac test stand
Extension SR1 WP3 Electrical installations
UITF Project Status Meeting
UITF MPS system requirements
One quarter of RFQ vessel + vacuum pumps and supports
Upgraded Injector Test Facility
NISSAN Z31 & Z32 OIL PUMP DIFFERENCES
Upgraded Injector Test Facility
Ion Source and LEBT Beam Diagnostics
UITF Conduct of Operations Review
Hardware integration and interfaces
RF introduction Anders Sunesson RF group leader
Presentation transcript:

’ tall Empty space below this metal sheet 66’ 14’ 4’ 10’ Ceiling tiles = 24 Concrete blocks 14’ long There are two “styles” of Ceiling tile, square and rectangular cross sections New stairs here

PSS Rad Con DC power magnets Network and communications bpmsI&C High power rf Gun HV power supply LLRFcryo Buncher solid state amp vacuum Old layout

’ tall Empty space below this metal sheet 66’ 4’ Ceiling tiles = 24 Concrete blocks 14’ long There are two “styles” of Ceiling tile, square and rectangular cross sections New stairs here klystrons Completely empty One waveguide and LCW Two waveguides New electric here HDIce 14’10’ New layout

’ tall Empty space below this metal sheet 4’ klystrons Completely empty One waveguide and LCW Two waveguides New electric here HDIce 14’10’ PSS Rad Con DC power magnets Network and communications bpms I&C Gun HV power supply LLRF cryo Buncher solid state amp vacuum

Dimensions will be checked, more dimensions added

Walkway: Backs of racks here Metal plate, rad shielding Electronics racks, side view Front of rack here Grating-type floor

Walkway: Backs of racks here Electronics racks, side view Front of rack here 68” 39” ?” Should we install sides and backs?

DeviceQtyAC Power EachTotal AC PowerLCWLocation Gun High Voltage power supply 1 30A / 208 VAC 3 phase NoneTop of cave ODH rack needs emergency power 1 20A/120 VAC single phase None from an emergency power loop Trim Rack2 50A / 208 VAC 3 phase 100A/208 3Phase NoneTop of cave Chicane power supply 1 30A / 208 VAC 3 phase 30A/208 3PhaseNoneTop of cave Chicane magnets3none4 GPMCave LLRF/Master Oscillator 1 20A / 120VAC single phase NoneTop of cave Water skids for chopper & buncher 2 20A / 208 VAC 3 phase 40A/208 3Phase4 GPMCave Solid state RF amps for choppers 4 20 Amp / 208 VAC single phase 80 Amp / 208 VAC single - phase to phase Top of cave 4 Amplifiers at 400 Watts each Solid state amplifier for 750 MHz buncher 125A/480 VAC 3 phase 25A/480VAC three phase Top of cave Cathode Power Supply for klystrons 1 100A / 480VAC 3 phase NoneTop of cave also for High power RF VAC three phase and 120 VAC Top of cave Klystrons3none 16.5 GPM Top of cave5.5 GPM each Circulators & loads3none6 GPMTop of cave2 GPM each Cave Vacuum & Utility power 20A / 208 3Phase XX A / 240 VAC X circuits 20 A / 120 VAC 20A/208 3Phase 240 VAC Cave Ion Pump power supplies 1 20A 120VAC single phase noneTop of cave Control Racks including cryo 12 20A / 120VAC single phase Amps Top of cave Control Room1 20A / 120VAC single phase Amps Control Room Inside the Cave 20A / 120VAC single phase Amps along perimeter of the cave HDIce gets power from Big Bertha. Big Bertha will get power fed from a distribution panel in the annex. This distribution panel is attached to the generator. Ground isolated lines Walt thinks we might want two additional 480 VAC welding receptacles installed inside the cave too. These additional lines do not need to be attached to a generator.

Rf system for VTA750 MHz buncher rf system Front width 32”, depth 39”, height 68”