CMS Tracker Week, CERN, 26-29 October 2004 28 Oct 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.

Slides:



Advertisements
Similar presentations
CMS Week, CERN, Sep Sep 2003Tracker Week - Bonding WGSalvatore Costa - Catania Working Group Business.
Advertisements

CMS Week, CERN, June Jun 2004CMS Week - Bonding WGSalvatore Costa - Catania Documentation of the loop of the to-be-pull-tested bonds placed.
16 Jul 2002Tracker Week - Bonding WGSalvatore Costa - Catania Status Report on Bonding at Catania Salvatore Costa University and INFN – Catania.
ARCs cut definition for TEC modules Javier Fernandez Menendez Institut für Experimentelle Kernphysik Karlsruhe University TEC meeting 14 th July 2004.
03 Dec 2002CMS Week - Bonding WGSalvatore Costa - Catania Status Report on Bonding at Catania Salvatore Costa University and INFN – Catania.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
Slide 1CMS Database Issues-Derek BargeDOE review, January 20, 2004 CMS Database Issues Derek Barge.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
CSC 160 Computer Programming for Non-Majors Lecture #7: Variables Revisited Prof. Adam M. Wittenstein
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
1 JD.Berst, U. Goerlach, CMS TRK APR 2003 Status of Hybrid Qualification and Tender Final Technical Specifications –Hybrid types –Quality control, intermediate.
March 17, 2003 Catania, Meeting ST - CMS CMS Sensor Quality Frank Hartmann – University of Karlsruhe 1 Summary of Sensor Quality Tests List of Problems.
The Project AH Computing. Functional Requirements  What the product must do!  Examples attractive welcome screen all options available as clickable.
04 Dec 2001CMS Week - Bonding WGSalvatore Costa - Catania Writing Bonding Data into the CMS Tracker Construction Database Salvatore Costa University and.
CMS Tracker Week, CERN, July July 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting.
CMS Tracker Week, CERN, Apr Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Module Production ___________ Report on.
Status Brussels GANTRY Ê Overview of the pilot run (second week of October) 4 aims and achievements 4 accuracy on position and angles 4 residual features.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
CMS Week, CERN, December Dec 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
CMS Tracker Week, CERN, April Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Status Brussels GANTRY Ê Recovered from the Gantry PC crash during Pilot Run R6 4 same situation as before the Pilot Run is achieved for R6 Ë Comparison.
Cavity Yield Re-Evaluation Plan C.M. Ginsburg (Fermilab) July 10, 2009 (Essentially a copy of presentation June 24, 2009 to SCRF-ML WebEx meeting with.
CMS Week, CERN, September Sep 2003CMS Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 16 Sep.
CMS Week, CERN, Mar Mar 2004CMS Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università di.
22 Oct 2002Tracker Week - Bonding WGSalvatore Costa - Catania Status of Database Interface for Bonding Data Salvatore Costa University and INFN – Catania.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
10 April 2003Salvatore Costa, INFN Catania1 CMS Tracker Week CERN, 10 Apr 2003 Entering Bonding Data in TrackerDB.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
CMS Tracker MPR, CERN, 22 November Nov 2004CMS Tracker MPRSalvatore Costa - Catania Module Bonding Working Group Salvatore Costa Università di.
CMS Week, CERN, June June 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
22 Jan 2002Tracker Week - Bonding WGSalvatore Costa - Catania Writing Bonding Data into the CMS Tracker Construction Database Salvatore Costa University.
CMS Tracker Week, CERN, February Feb 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, June June 2004CMS Week - TPOSalvatore Costa - Catania Repair Centers, from a Bonder’s point of view Reported by: Salvatore.
Tracker Visualization Tool: integration in ORCA Maria S. Mennea, Giuseppe Zito University & INFN Bari, Italy Tracker b-tau Cosmic Challenge preparation.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Cavity Yield Re-Evaluation Plan C.M. Ginsburg (Fermilab) June 24, 2009.
Report from Florence Bonding of Modules L12p Mirko Brianzi 20 April 2004.
Strasbourg status Ring 7 pilot run François Didierjean.
CMS Tracker Week, CERN, February Feb 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
Tracker Week, CERN, Feb Feb 2004Tracker Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università.
Preparation for silicon sensor arrival sensor delivery schedule aggressive expect 130 L2-L5 sensors each in July and August sensor lot/batch will likely.
CMS Tracker Week, CERN, April Apr 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Bonding WGSalvatore Costa - Catania Which strips should the Bonders skip because of known.
Status Report on Bonding at Catania
Status of PQC Florence, Strasbourg, Vienna
EXPLORING descriptions of SPREAD Math 6 Plus Unit 13
EXPLORING descriptions of SPREAD UNIT 13
Bonding web site, renovated
Executive summary from Bonding WG Meeting 21 Oct 2003
Hamburg Bonding Report
Vienna Module Production
CMS Perugia Modules Production Review
Module production in Italy
TEC Module Production Overview
Bari production centre resp. M. de Palma
Module Production in Brussels
CMS Perugia Gantry Status Report
L.Fiore Gantry Meeting during the CMS TK week
Mean Absolute Deviation
TEC module quality overview
TOB Module Production Overview and Plan
EXPLORING descriptions of SPREAD Math6-UNIT 10
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
EXPLORING descriptions of SPREAD
FNAL Bonding Since our last report we have built and bonded an additional 10 TOB 4-chip modules 3 RMT pitch adapters 7 Planar pitch adapters By adjusting.
Università di Catania and INFN – Sezione di Catania
Università di Catania and INFN – Sezione di Catania
Presentation transcript:

CMS Tracker Week, CERN, October Oct 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore Costa Università di Catania and INFN – Sezione di Catania

28 Oct 2004CMS Tracker Week - Module Production2 Salvatore Costa - Catania Outline 1.Global info on production bonding of the Modules 2.Global review of Module bonding quality indicators 3.Selected highlights from Center reports 4.Decision on Module Grading initiative

CMS Tracker Week, CERN, October Oct 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Global info on production bonding review of Module bonding quality

28 Oct 2004CMS Tracker Week - Module Production4 Salvatore Costa - Catania Production Summary

28 Oct 2004CMS Tracker Week - Module Production5 Salvatore Costa - Catania Module Pull Tests Performed # Modules pull tested after 01Dec2003 (at last Mtg) Results in DB from 13 Centers out of 14 CenterPA TAPA-SenSen-Sen Bari98 (83 )101 (86 ) n/a Catania51 (51) n/a Firenze9 (9) 5 (5) n/a Padova18 (18) 99 (99) n/a Pisa18 (10) 46 (37) n/a Torino119 (114)46 (46) n/a Fermilab121(119)35 (33)35 (34) Santa-Barbara51 (51) 58 (58)76 (76) Aachen Hamburg69 (62)50 (45)n/a Karlsruhe0 (0)20 (20)n/a Strasbourg20 (20)65 (65) Vienna55 (19)91 (28)n/a Zurich0 (0) 42 (38) n/a

28 Oct 2004CMS Tracker Week - Module Production6 Salvatore Costa - Catania Center Averages BA CT FI PD PI TO FL FL SB SB HA KA ST ST VI ZH. ss ss ss 5g Not angle-corrected yet!

CMS Tracker Week, CERN, October Oct 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Selected highlights from the Bonding WG Meeting of 26 Oct 2004

28 Oct 2004CMS Tracker Week - Module Production8 Salvatore Costa - Catania TEC centers In general production Bonding has slowed down or has now come to a stop However, for some TEC centers this was their first chance of reporting on bonding of a significant number of Modules: –Aachen tuned machine parameters using some 5 faulty modules, after which was able to bond 10 with very good results [pull forces 9-10 g and mostly heel breaks, pull test data now in DB]. –Karlsruhe received 23 Ring-5 Modules from Brussels Gantry, bonded 17. At the moment they have problems bonding on the PA, resulting into as many as 20 re-bonds per Module. Perhaps they have to still tune parameters. Also complained that modules arrive with very dusty carrier plates and cleaning them is tricky as that tends to wash the dust on Sensors. –Vienna has now bonded ~115 modules and now is looking into buying a new machine (likely Hesse & Knipps). Zurich has bonded 335 Ring-4 Modules with final 97% acceptance. Bonds are of excellent quality in general as testified by the pull test results. Some specific problems encountered are: –19 modules delivered in July had the pitch adapter protruding over the sensor. –Out of those, 8 modules with variable distance PA – Sensor. –There were about 20 % floating modules. Preparing new jigs to avoid that the stiffener can touch the jig.

28 Oct 2004CMS Tracker Week - Module Production9 Salvatore Costa - Catania TIB centers In general production Bonding has slowed down or has now come to a stop –Catania still has a few modules to bond. Had failure in electronics board of Hughes  fixed. –Firenze also had a serious failure of Delvotec which required service. –Padova reported some technical problems bonding the TIB Layer1/2 stereo modules because of conflict between some jig areas and a certain ceramic support piece of this type of modules. –Pisa said they noticed the same problem and solved by simply milling out a small piece of the jig. Having run out of modules to bond, the other task of monitoring bonding quality of Sensor batches by executing pull test in the half-moon Sensor Test Structures will be now resumed.

CMS Tracker Week, CERN, October Oct 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Decision on Module Grading initiative

28 Oct 2004CMS Tracker Week - Module Production11 Salvatore Costa - Catania Module Grading (Gantry  Bonding) Hybrid position check at Gantry –The Gantry group continues to measure, and record in the usual DB tables, data concerning position of the hybrid, –But they no longer write into the DB a NEGATIVE flag (=FAULTY module) based on values of those data AND ship the modules to Bonding REGARDLESS of those data. –Gantry writes a flag anyway (but a POSITIVE one!) to the DB  New Bonding DB interface version (in the works) checks that variable and displays a warning (in the Pre-Bond Inspection Section) if appropriate

28 Oct 2004CMS Tracker Week - Module Production12 Salvatore Costa - Catania Module Grading from Bonding (1) Grading based on # unbonded strips BONDSTATUS_VALFirst flag in BONDSTATUS_VAL vector: – 0 if n_unbonded <1 – 1 if 1% - 2 – -1 if >2% These are consistent to grades A,B,C of ModTest and the module is faulty with >2% unbonded strips.

28 Oct 2004CMS Tracker Week - Module Production13 Salvatore Costa - Catania Module Grading from Bonding (2) In addition to that, we have now adopted a second, independent, Grading scheme based on based on mechanical quality of the bonds –Idea emerged in June 2004 within TIB bonders community –Presented for first time at July 2004 Tracker week –Mixed reactions, different opinions… –The Bonding WG Technical Advisor supports it and has contributed to determining the criteria for this grading –I will now implement it with the next release of the Bonding DB I/F and start looking after its adoption by Centers

28 Oct 2004CMS Tracker Week - Module Production14 Salvatore Costa - Catania Module Grading from Bonding (3) Grading based on mechanical quality of the bonds Technical implementation: –Add in the BONSTATUS_VAL vector a second flag –Possible second flag values would be again 0,1,-1 corresponding to grades A,B,C. –For example a module with BONDSTATUS_VAL=“:0:1:” would be of grade A for # of unbonded strips, but grade B for mechanical quality of the bonds

28 Oct 2004CMS Tracker Week - Module Production15 Salvatore Costa - Catania Module Grading from Bonding (4) Grading based on mechanical quality of the bonds Criteria to generate this second flag: –# Bias Bonds (Spec: 5, 15 for TIB back) >2: grade A (flag 0) 2: grade B (flag 1) <2: grade C (flag -1) –# “critical” readout bonds [definition list of “critical” by Alan]: ≤ 2%: grade A (flag 0) > 2%: grade B (flag 1) > 20%: grade C (flag -1) –Operator judgment on all other bonds [guidelines to issue this judgment by Alan]: A, B, C. These criteria will be or’ed together to generate flag.

28 Oct 2004CMS Tracker Week - Module Production16 Salvatore Costa - Catania Module Grading from Bonding (5) Grading based on mechanical quality of the bonds Method to generate this second flag: –Add to Bonding DB I/F section where operators may enter: –Number of bias bonds in each spot –Number of “critical” readout bonds as defined by Alan –Judgment on non-critical readout bonds as per Alan’s guidelines –Explanation of reason(s) why a module may be non-trustworthy I/F script will calculate final flag Of course all these new fields will default to “perfect module” values Normally operator will have nothing to type if Module was bonded with no problems