1 LONG BEACH, CALIFORNIA. 2 Matt Davis Assistant Director of Planning Hartsfield-Jackson Atlanta International Airport

Slides:



Advertisements
Similar presentations
Federal Aviation Administration 1 Collaborative Decision Making Module 2 Developing A Collaborative Framework.
Advertisements

Total Airport Management CARE Innovative Study
Presented by United Arab Emirates MID ATM ENHANCEMENT PROGRAM (MAEP) TECHNICAL PROPOSAL.
Air Traffic Analysis, Inc Using WITI for Airport Arrival Performance Analysis A report on work-in-progress December 2010.
October 18-20, 2010 LONG BEACH, CALIFORNIA.
Modeling Airport Capacity
Airport Planning and Design
Westchester County Airport PASSUR OPSnet Field Condition Report
Comprehensive Development Plan Sea-Tac International Airport Briefing to: Mediated Role Determination Committee April 20, 2006.
Ken Jacobs Airport Planning & Environmental Division March 3, 2010 Federal Aviation Administration Federal Aviation Administration 33.
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
Federal Aviation Administration Examples of OR Practices at FAA WINFORMS Nastaran Coleman, Ph.D. January 28, 2014.
Heather Bell GMFIR Vancouver November 9, 2010 NAV CANADA.
Runway Incursion’s Affect on FAA Approved Pilot Training and Pilot and Flight Instructor Certification and Part 121 Pilot Checking – Andy Edwards – Manager.
Airport Planning. errata Traditional forecasting techniques are still in play, but are considered archaic. US airlines are focused on international travel.
Welcome Air Traffic Control Procedures For: SAFECON 2015 Competition.
FAA Strategic Planning Flight Plan Update James Ballough Director, Flight Standards Service November 2004 Flight Standards Service.
Airspace Resource Allocation -Operations Impact Prof. R. John Hansman, Director MIT International Center for Air Transportation
1 Federal Aviation Administration Mid Term Architecture Briefing and NextGen Implementation 1 Federal Aviation Administration Mid Term Architecture Briefing.
1 FPAW Fall Meeting, October 22, Develop an analytical model that explicitly incorporates weather forecasts, and their uncertainty, in estimating.
AN AIR TRAFFIC CONTROL PERSPECTIVE ON VOLCANIC ASH HOW TO DEAL WITH IT.
Runway Safety Teams (RSTs) Description and Processes Session 5 Presentation 1.
Gate-to-Gate Project: Implementing Sequencing, Merging, and Spacing Captain Bob Hilb September 11, 2006.
Date: 18 February 2008 Federal Aviation Administration Collaborative Decision Making at the FAA/ATO A look at how CDM is applied in the U.S.
Presented to: By: Date: File: apo130\Airport Efficiency\TAER SAER Updated Briefing(2).ppt 1030 Federal Aviation Administration Presentation of System Airport.
RST processes Session 6 Presentation 3. A framework for RST processes Establishing an RST Membership Terms of reference Work programme (schedule, agenda,
ProModel Solutions Conference 2006 Delta Air Lines - ACS Planning & Performance Jennifer Meucci.
Federal Aviation Administration FOR OFFICIAL USE ONLY (Public availability to be determined under 5USC 552) Data Communications Program DCL Benefits Modeling.
PASSUR Airport Solutions. Completely unique information.
ICRAT 2004 Airport Surface Operations Analysis Tarja Kettunen ISA Software International Conference on Research in Air Transportation Zilina, Slovakia,
Weather Satellite Data in FAA Operations Randy Bass Aviation Weather Research Program Aviation Weather Division NextGen Organization Federal Aviation Administration.
Federal Aviation Administration Valuation of NextGen Capacity Benefits A Consumer Surplus Approach to the Monetization of NASPAC Results For: INNOVATIONS.
AIR TRAFFIC CONTROL Presented by S.SUMESWAR PATRO Regd no:
Outcome: Zero fatalities resulting from runway incursions.
0 Downloaded from FAA Runway Safety Briefing Sun ‘n Fun EAA Fly-In April 2002.
Jeff Pearse Director of Marketing and Business Development Hartsfield-Jackson Atlanta International Airport April 7, 2008 Hartsfield-Jackson Capital Improvement.
Presented to:FAA field personnel By:AOSC Date:February 17, 2006 Presented to:FAA field personnel By:AOSC Date:February 17, 2006 Federal Aviation Administration.
Federal Aviation Administration ATO Future Schedule Generation Performance Analysis and Strategy January 27, 2010.
Federal Aviation Administration ASPIRE Update APEC TPT-WG Aviation Emissions Taskforce Singapore 15/16 Sept 09.
1 1st ANNUAL WORKSHOP NAS-WIDE SIMULATION IN SUPPORT OF NEXTGEN: REQUIREMENTS AND CAPABILITIES Lance Sherry Center for Air Transportation Systems Research.
LMINET2: An Enhanced LMINET Dou Long, Shahab Hasan December 10, 2008.
San Antonio Airport System Overview Presented to the Airport Ground Transportation Association September 13, 2010.
Presented to: NAS-Wide Simulation Workshop By: Kimberly Noonan, FAA NextGen and Ops Planning Date: January 28, 2010 Federal Aviation Administration NextGen.
1 ATM System Wide Modeling Capabilities in Fast-Time Simulation 1 st Annual Workshop – NAS-Wide Simulation in Support of NextGen Dec. 10th – George Mason.
East Hampton Airport Safety, Noise and Operational Management Plan Peter J. Kirsch December 1, 2011.
Airport Markings & Signs
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Federal Aviation Administration System Airport.
September 25, 2009 BASELINE CAPACITY AND DELAY ANALYSIS Prepared for: Regional Airport Planning Committee Prepared for: Regional Airport Planning Committee.
U.S. National Airspace System: Runway Safety
Wes Timmons, Director of Runway Safety, FAA April 2009 Federal Aviation Administration Runway Safety: Sun ‘N Fun Update.
Benefits of CDM Within AFI Region Presented by: Mikateko Chabani.
COLLABORATIVE DECISION MAKING
Reduced/Low Visibility Operations – ATAC AGM, November, 2010.
Presented to:GMU System-Wide Modeling Workshop By: Joseph Post, ATO NextGen & Ops Planning Date: 10 December 2008 Federal Aviation Administration FAA System-Wide.
1© 2009 by Nelson Education Ltd.. 2 The Airline Industry Chapter 6.
Federal Aviation Administration 1 Collaborative Decision Making Module 5 “The Collaborative Environment”
Using Simulation in NextGen Benefits Quantification
Joint Planning & Development Office Evaluations & Analysis Preliminary Scenario Analyses Strategy Assessment to Provide a Basis for Prioritizing Investments.
Air Traffic Control System Command Center Activities and Perspective Steve McMahon, Manager, System Efficiency.
NY/NJ/PHL Metropolitan Area Airspace Redesign Project and Implementation Update Presentation to: Congressional Staffers By: Steve Kelley, Airspace Redesign.
Analysis of Demand Uncertainty in Ground Delay Programs Mike Ball University of Maryland.
1 Surface CDM Sub-team Concept of Operations Briefing Marshall Mowery (FAA CDM Lead) Dan Allen, FedEx Express (Industry CDM Lead) Carl Calcasola, ATM PBI.
PRESENTATION TO: CITRUS COUNTY BOARD OF COUNTY COMMISSIONERS 11 AUGUST 2015 INVERNESS AIRPORT MASTER PLAN UPDATE.
Port of Bellingham Briefing BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN BRIEFING April 2014.
RSPA/Volpe Center Arrival/Departure Capacity Tradeoff Optimization: a Case Study at the St. Louis Lambert International Airport (STL) Dr. Eugene P. Gilbo.
St. Pete-Clearwater International (PIE). Discussion Topics 1.Airport Operational Overview 2.Task Force Update 3.Aircraft Operations 4.Noise Abatement.
Presented by United Arab Emirates
Collaborative Decision Making “Developing A Collaborative Framework”
Presentation transcript:

1 LONG BEACH, CALIFORNIA

2 Matt Davis Assistant Director of Planning Hartsfield-Jackson Atlanta International Airport Airside Capacity Evaluation Techniques LONG BEACH, CALIFORNIA

3 Agenda Define the Problem What’s the Appropriate Tool? What are Your Data Sources? Challenge Your Assumptions Gain Consensus

4 Define the Problem What Is Your Airfield Problem? –What Do Your Stakeholders Think the Problem is? –Is it in the Airspace? Other Airport Conflicts? Obstacles? Noise Abatement Routes? –Is it on the Ground Taxi in/Taxi Out Delay? Runway Crossings? Apron Congestion/Gate Availability? How Do You Define Your Problem? –Demand versus Capacity, Delay, Or Something Else? Air and/or Ground Delay Gate Utilization Payload/Range

5 Sample Problems San Antonio Airspace –San Antonio International Airport Runway 3-21 Vs Randolph Air Force Base –Stinson Municipal ILS on Runway Kelly Air Force Base – Runway Stinson Municipal Airport – Runway San Antonio International Airport Runway 12-30

SAT Airspace Image 6

7 Sample Problems Ground –Hartsfield-Jackson Atlanta International Airport 6 th Runway? –Air and/or Ground Delay versus Taxi times South Gate Complex? –Gate Utilization/Availability –Air and/or Ground Delay versus Taxi times Extension of Runway 9L-27R –Payload/Range Extension of Runway –Air and/or Ground Delay versus Taxi times vs. 6 th Runway

ATL 2009 Comprehensive Development Plan 8

Gate Metrics 9

10

2008 ATL Gate Analysis 11

2008 ATL Gate Analysis 12

Gate Metrics Airfield Capacity vs Gates 13 Source: Jacobs Consultancy, February 2008

Gate Metrics Airfield Capacity vs Gates 14 Source: Jacobs Consultancy, February 2008

FAA ASV Delay Curve 15

16 What’s the Appropriate Tool? Traditional Airfield Capacity Tools –AC 150/5060-5a Airport Capacity Handbook (ACRP currently studying an update to this 1985 document). –FAA Airfield Delay Model (Another 1980’s cheap solution) –Airfield Simulation Models (Very Complex & Very Expensive) SIMMOD, TAAM, Airport Machine and FAA Technical Center RDSIM. This is not an exhaustive list. Gate Scheduling Models –Numerous commercial and proprietary software packages are available. Airfield Models Are Data Sensitive. The Lack of Quality Data Can Make Your Results Suspect.

Tool Box Handbooks/nomographs –(FAA Airport Capacity and Delay Advisory Circular) “Analytical” models –(time-space diagrams, FAA Runway Capacity and Annual Delay models) Runway queuing models –(L&B’s AirSim, Delays) Microsimulation models –(SIMMOD, ADSIM/RDSIM, TAAM) Real-time simulation methods –(FAA and NASA tower simulators) 17

ATL ASV Calculation 18

VTASIM Range of Results 19

VTASIM Range of Results 20

SIMMOD Sample Simmod Video clip 21

22 What Are Your Data Sources? Analysis is only as good as the data from which it is derived from. –Official Airline Guide (OAG) for Airline Schedule Information Does not include Cargo, Charter, Military or General Aviation Operations –FAA - ASPM, Tower Counts, and ASR-9 records. –RITA BTS Only includes those airlines that provide ACARS data to FAA No International Flight Information –Airport Records Recorded Observations Sensis Aerobahn Passur

VTASIM Range of Results 23 AeroBahn clip

24 Challenge Your Assumptions How Do the Airlines/ATC Respond to These Events at Your Airport –IMC Conditions: What is the split between VMC and IMC? –CAT II and below: how often are you in low visibility conditions? –Snow/Icing Conditions: Throw their hands up in the air and quit? What is the Impact of the Airlines’ Business Plans on Your Analysis? What Are the Little Things You Can Do To Make Valuable Improvements? –End Around Taxiways –Strategically Placed High Speed Exits –New Runway Crossing Locations There Are Several Small Improvements That Can Pay Off In The Long Run.

25 Gain Consensus Get Agreement Up Front on The Metrics You Will Use –How Detailed Do The Results Have To Be? Delay in the Apron Areas, Runway Crossing, or Departure Queue Overall Taxi times. (Delay plus unimpeded taxi time) –What’s Important and to Whom? How Important is Safety When You are Preparing a Benefit/Cost Analysis? How Do You Measure Safety if Your Concern is Efficiency? What if There is No Differential Savings in the Results, but the Outcome is More Predictable? What’s Your Definition of Acceptable Delay?