Online Parking Reservation System

Slides:



Advertisements
Similar presentations
Technical System Options
Advertisements

Project Management CHAPTER SIXTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Systems Analysis and Design: What is it? Systems analysis: the systematic study of the information needs and problems of some organizational domain in.
RESTORETECH SOLUTIONS ® SYSTEM REQUEST. RESTORETECH SOLUTIONS ® PROJECT TEAM: Chetana Yogeesh Alicia Hanibald Gerrit Stroh.
Chapter 2 The Analyst as a Project Manager
Rafiki Airways Online Booking and Check-in system.
The Systems Development Life Cycle
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Chapter 6 Initiating and Planning Systems Development Projects 6.1.
© Prentice Hall CHAPTER 9 Application Development by Information Systems Professionals.
Unit Five – Transforming Organizations
Modern Systems Analysis and Design Third Edition
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Introduction to Software Engineering Dr. Basem Alkazemi
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
The Analyst as a Project Manager
By Michael Hebron. Task Mode Task NameDurationStartFinishPredecessorsResource Names Auto Schedul ed Initiation42 daysMon 1/10/11Tue 3/8/11 Auto Schedul.
Project Identification and Selection
PowerPoint Presentation for Dennis, Wixom & Tegardem Systems Analysis and Design Copyright 2001 © John Wiley & Sons, Inc. All rights reserved. Slide 1.
Flowers North Development of a Web Site and Online Store for.
Initiating and Planning Systems Development projects
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Project Planning Class 7. SDLC Project Identification & Selection Project Initiation & Planning *** Analysis Logical Design Physical Design Implementation.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 6 Initiating.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 4.1.
Team Members.
Chapter 14 Managing Projects.
Web Interface Technology™ System Request Project Sponsor: Michael Brown, Manager Marketing Project Team: Dan Luciano, Josh Owen, Nick Rose.
Managing the development and purchase of information systems (Part 1)
Summer Internship Working in Japan - Different Culture/Environment Kana YASUDA.
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 15 Project Management McGraw-Hill/Irwin.
1 Phases in Software Development Lecture Software Development Lifecycle Let us review the main steps –Problem Definition –Feasibility Study –Analysis.
Chapter 13: Developing and Implementing Effective Accounting Information Systems
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 6 Initiating.
Topic Cafeteria Management System
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 3 Systems Planning and Selection 3.1.
PowerPoint Presentation for Dennis, Wixom, & Roth Systems Analysis and Design, 3rd Edition Copyright 2006 © John Wiley & Sons, Inc. All rights reserved.
Software Requirements Engineering: What, Why, Who, When, and How
PRESENTED BY: CHAKRADHAR CHILAKAPATI CHRISTINA NALLY KHALID NOUR VISHALI VELI In Bloom Flower Shop.
Lecture 3 Managing the Development Project SFDV Principles of Information Systems.
1 Unified Modeling Language Michael K. Wildes University of California, Riverside – Extension Program Presentation 2.
Systems Development Lifecycle (SDLC) Jason C. H. Chen ( 陳周宏 ), Ph.D. Visiting Professor National Taipei University of Technology Professor of MIS Graduate.
PowerPoint Presentation for Dennis, Wixom, & Tegarden Systems Analysis and Design with UML, 3rd Edition Copyright © 2009 John Wiley & Sons, Inc. All rights.
Bayou Corporate Airways Project Identification Presented By: Manan Mehra Gerson Morales Mayuri Sriram.
Topic Cafeteria Management System GROUP : 9 TEAM 1.
CUSTOM CLOTHING “YOU DON’T HAVE TO COME TO US, WE’LL COME TO YOU” PRESENTATION 1: SYSTEMS REQUEST Project Sponsors: Ambarish Regmi Han Le Miriam Barrera.
When an engineer or technician is using a Tektronix oscilloscope, they often have both hands busy probing a circuit board. Sometimes they need a “third.
3 1 Project Success Factors u Project management important for success of system development project u 2000 Standish Group Study l Only 28% of system development.
NURHALIMA 1. Describe steps involved in the project initiation and planning process Explain the need for and the contents of a Statement of Work and Baseline.
Structures Team Team Leader: Jonathan Piccoli Secretary: Nicholas Baker Think Tank Lead: Daniel Morehouse CAD Lead: Parth Patel Design Report: EDSGN 100.
SMARTSHOP By: EVN BHARGAV NAGARAJU NAIDU – SASHI TERLI Belligerents.
Online Clothing Houston Bongard Jennifer Kurata Lori McDonald Tyler Shelton Jane Yune.
Slide 1 Software Construction Software Construction Lecture 3.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 6 Initiating.
Systems Analysis & Design David Walkiewicz March 31, 2012.
The Information Systems Development Processes Chapter 9.
March 24, 2016 Kentucky Municipal Energy Agency Project Schedule Update.
Supervisor : Trần Vinh Thu
What is E-Commerce?.
TIM 58 Continuing Ch 2: Project Management
Systems Analysis and Design in a Changing World, 4th Edition
Modern Systems Analysis and Design Third Edition
Chapter 6 Initiating and Planning Systems Development Projects
Systems Planning: Project Feasibility
Introduction to Projects
Lecture 6 Initiating and Planning Systems Development Projects
Modern Systems Analysis and Design Third Edition
MANAGING THE DEVELOPMENT AND PURCHASE OF INFORMATION SYSTEMS
BITCOIN prediction Mark Perelman ISI 490.
Chapter 6 Initiating and Planning Systems Development Projects
Week 10 Systems Development
Presentation transcript:

Online Parking Reservation System Mahindra Bheodari, Eric Palmer, Evbusogie Okhomina, Furkan Dindar IS 8060 / Spring 2015

Project Proposal and Specification Problem Definition (Project) The Hartsfield-Jackson Atlanta International Airport (HJAIA) is the world busiest passenger airport and has been for over a decade but has poor parking arrangements. Difficulty for first time parkers Hard time determining if lot is full Paper ticket system as tool to purchase Project Goal System Request –Project Name, Sponsor, Business Need Project Functionality

System Request (Contd) Expected Value Tangible – Increase number of online bookings, reduction in manpower cost Intangible – Customer satisfaction Special Issues or Constraints – Compliance with government regulations, budget, skills gap Feasibility Analysis Legal Feasibility Operational Feasibility Economic Feasibility Technical Feasibility Market Feasibility Organizational Feasibility

Work Breakdown Structure Summary Duration: 105.5 Days Starts 3/12/15 Ends 8/6/15 Total Cost: $40,912.00 Resources / Team Management, Project Managers, Analyst, Developers, Technical Communicators, Testers, Trainers, Deployment Team Task Name Duration Start Finish Cost Online Airport Parking Reservation System 105.5 days Thu 3/12/15 Thu 8/6/15 $40,912.00 Business Modeling 14 days Tue 3/31/15 $7,280.00 Requirements 19.5 days Wed 4/1/15 Tue 4/28/15 $6,400.00 Analysis 6 days Wed 5/6/15 $2,784.00 Design 38 days Mon 6/29/15 $14,288.00 Implementation 10 days Mon 7/13/15 $4,688.00 Test Tue 7/21/15 $1,920.00 Deployment 12 days $3,552.00 Online Airport Parking Reservation System Complete 0 days $0.00

Requirements Determination Non-Functional Requirements Operational Requirements Performance Requirements Security Requirements Cultural and Political Requirements Functional Requirements Administrators can generate real time information Add new products and promotional products Interface with existing Parking Revenue Control System (PRCS)

Requirements Determination- Functional Requirements..contd.. Have the ability to store customer information Give customer ability to change / cancel reservation Ability to save and print reservation Have shopping basket showing order details Ability to incorporate surcharges outside reserved period

As-Is System

As-Is System: Use Case Diagram Use Case Diagram: Airport Parking System Use Case 1: Get Ticket Use Case 2: Payment Use Case 3: Submit Receipt Ticket

As-Is System: Class Diagram

As-Is System: Sequence Diagrams

To-Be System

To-Be Use Case Diagram User Case Diagram for Online Airport Parking Reservation System Use Case 1: Reservations Use Case 2: Update Payment Use Case 3: Get Ticket Use Case 4: Payment Use Case 5: Submit Ticket Receipt

To-Be System: Sequence Diagrams

To-Be System: Class Diagram

To-Be System: Behavioral State Machine Diagrams

To-Be System: User Interface Design Step 1 Dates Step 2 Space Step 3 Car Spa Oil Change Step 4 Booking Details Step 5 Confirmation

To-Be-System: Phased Conversion Strategy What is Phased Conversion? Why Project chose this method of conversion? Advantages of Phased Conversion Disadvantages of Phased Conversion

CONCLUSION AND QUESTIONS