MONROVIA ELEMENTARY SCHOOL PLAYGROUND IMPROVEMENT PLAN

Slides:



Advertisements
Similar presentations
Playground Safety Amy Hill Playground Safety. Defining the Playground Injury Problem Defining the Playground Injury Problem.
Advertisements

Insert Pictures of People Playing
PLAYGROUND SAFETY 1. 2 Why is playground safety so important? 76% of injuries to children occur on public playgrounds 44% of all injuries are caused by.
1 Welcome to New Leader Essentials 2 Video No. 1: Introduction.
Avenida La Pata/Avenida Vista Hermosa Community Park PRESENTATION TO CITY COUNCIL and PARKS AND RECREATION COMMISSION December 15, 2004.
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
Joint Presentation Children's Council & Evangelism Committee Childrens Playground.
2013 State of the Town Meeting POOLESVILLE PARKS, STREETS AND RECREATION BOARD.
The Parks of the City of Fredericksburg. Parks Staff The Parks Maintenance Division is currently staffed with: –One Division Manager –One Supervisor of.
Playground Renewal Project: Proposed Design, Budget and Timeline January 2013.
No Name Park March 7, Citizen Park Committee Volunteers 3 Official Meetings Other subcommittee meetings Developed Vision for Park Developed General.
Children Aged 5 to
City of Palm Beach Gardens Tennis Center Expansion Project ITB PF.
Whitney Park East General Landscaping Plan Summer 2009.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
Public Playground Safety Basics For Child Health Liaisons.
Radius Engineering Inc. Landscape Water Harvest Project Dr. Ty Harrison, consultant Example of a water conserving commercial landscape project Radius Engineering.
Changes to the 2011 Landscape Projects Grand Haven.
1 Al Thomas Playground Replacement & Park Improvements March 16, 2011 Presenters: Amanda Peterson Jeanette Sanchez Joliette Woodson.
Urban Game. WELCOME TO: THE YEAR 1700  A River across your paper connecting east to west (should be about an inch wide)  Draw a wooden bridge across.
The Industrial Revolution…
Lawns are a major part of most home landscapes. The three main reasons for lawns: They add beauty to the landscape They are used as play areas for sports.
Reconstruction of the Eads Bridge Highway Deck
Playground Project Rosiland Jackson & Deandra Downey.
Playground Project.  Sloping ground provides drainage problems  All slides need replaced (cracked)  Several gaping holes in play structure  Steps.
Alpha Borough Community Recreation Project Preliminary Design Presented by Group 3 February 28, 2002 From left to right: Pamela Vislocky, Erin O’Brien,
Design Overview for: Wright’s Mill Pool Amenity Center Madison, MS Problem: This +/- 220 home community was built in the mid-1990’s. The developer built.
Simms’ Park Re-loaded Dace Steinke, Layton Rohrer, Sabia Reiche, Branden Bulik-Chism Geometric Construction.
Information Update and Moving forward 05/01/
Under The Sea Playground By: Amanda Henriksen, Taylor Hile, & Kara Mclaughlin.
Establishing the Lawn Original PowerPoint Created by Howard Henderson Modified by the Georgia Agriculture Education Curriculum Office June 2002.
A Florida-Friendly Landscape Adopting University of Florida Fall 2009
Welcome to the Coral Learning Garden. Nature is astounding. Plants, with only the water and food that shows up; with no tending, fertilizer, or pesticides.
Proposal to Renovate the Gunter Park By Brooke Hogan By Brooke Hogan.
Physical Plant Department Special Activities/ Movers Division
EarthCare Services Service you can count on. Who We Are Founded in 1991 Provide garden and landscape design services Twelve locations throughout the US.
November 18, 2008 BCC Called Public Hearing on BZA #SE , 9/4/08 APPLICANT: Avalon School.
Services you can count on 4/30/2010.  Founded in1991  Provide garden and landscape design services  Twelve locations throughout the U.S.  More than.
Football Field Design TRF 230. Introduction Football exerts different stresses on turf than other sports Turf acts simply as a surface to move player.
Service you can count on! Jordan Waddell 4/30/10 Period 8.
January 30, Annual Meeting January 30, 2007.
How many students like the slides and the swings best? Favorite Playground Equipment Key =1 seesaw slide swing monkey bars.
Golf Course PBL By: Student B. Introduction In this lesson, I will investigate different uses for the land plot currently being used as a golf course.
Field of Dreams Phase VI Discussion Agenda February 13, 2007 Parks and Recreation Division February 13, 2007 Parks and Recreation Division.
SAGHA Annual Homeowners Meeting August 28, Agenda  Collect ballots  Treasurer’s Report  Common Area Maintenance Presentation  Election Results.
Presentation to the Chamber of Commerce Friday, April 23, 2010.
Sustainable Landscape Planning for Learning Environments Jennifer Dukes Jeffrey Aiken Matthew Smith Clemson University.
PTA General Meeting April 24 th, :30am. Financial Report as of March 1st O Beginning Balance: O $54, O Total Income: O $2.33 O Total Expenses:
Willamette Christian Center Site Analysis for Sustainable Development Sustainable Building Advisor Class Lane Community College Proposed by.
Chapter 9 Working with Young Children. Developmentally appropriate programs value outdoor areas as much as indoor areas The outdoor required area per.
Magna Utah Sadie Rodriguez 5A Cultural landscape photo story assignment.
Your assignment Design a new landscape for the front of our school. Measure from front of building to the street Measure from the sidewalk at the front.
Wellton Elementary School / Fort Yuma Rotary Project San Jose Ave, Wellton, AZ
Friends of Christ Church School Welcome You. Who Are We? Friends of Christ Church School (formally the Parent Teachers Association) is made up of volunteers.
By: Elise and Caitlyn. Your Visit to Saturn Need to Bring Jacket Rollerblades or skates Smell repellent Basketballs, soccer balls, activities.
Playground Equipment Elizabeth Wagner. Problem The problem in this project is to create a set of playground equipment that can be used by children from.
By: Mike Capasso. Recreation Center We have decided that the construction of a recreation center, based on the meeting’s results, would be a good idea.
BASKETBALL.
Miller Farms Condominium Association 2016 Annual Meeting 7:00 p.m. May 18, 2016 Springfield Plains Elementary School.
ESNI Community Outdoor Classroom
All-Play fully accessible playground Progress report #1
Windmill Natural Playground
CENTRAL JERSEY COLLEGE PREP CHARTER SCHOOL PLAYGROUND PROJECT
Planning Commission January 20, 2016
Playground Research Project
Helms PTA November General Meeting
JD's Paving Stones. JD’s Paving Stones is a locally owned paving stone and landscaping company located in Saskatoon, Sk. We.
Anderson Elementary Playground Renovation
Park and Recreation Board…Did You Know?
Presentation transcript:

MONROVIA ELEMENTARY SCHOOL PLAYGROUND IMPROVEMENT PLAN This past summer the community advisors asked me to help put together a detailed plan for the playgrounds at MES. By detailed plan we need quotes, lead times, installation plans, and schedule/timelines. What I’m about to share with you is an update on our progress, we are still seeking funding for several of these projects. We need to complete this detailed plan before Oct, so that we can put in requests for funding. Introduce playground committee: Community Advisors: T. Clemons, Q. Thomas, R.Wietlake; Teacher representative: T.Jones; Parent Volunteers Brian Mellburg and M.Price I’d also like to recognize our school board representative Jeff Anderson & principle Dr.Davis for their continued support, and commitment towards making this possible.

Current South Playground Situation Play equipment capacity for ~ 60 children Drainage problems near building Major sidewalks not connected Very little grass Pea gravel spread everywhere No shade Sloped landscape on west side Railroad ties need replacing Wooden play structure in poor condition and needs replacing Here’s a look at our current situation. targeting South playground, since MCBOE has plans to extend the bus lane in the front of the school. Planning on expanding the south playground and opening it up to all grade-levels. Fencing already moved to create wide-open spaces

New Playground Equipment Project Lead: Timmy Clemmons & Tammy Jones CAPACITY : Up to 54 Children AGE: 5-12 yrs. SIZE: 32’L X 37’W USE ZONE: 44’L X 49’W WEIGHT: 4,827 lbs. PLAYLAND MODEL PS3-18782 KIDSPLAY MODEL 400-01607 New equipment to replace the wooden structure Currently have two quotes & seeking a 3rd from MCBOE suppliers. 8-10 week lead times – 17 Play Events Featuring: Deep Rung Arch Climber Chute Slide Cargo Net Climber Triple Rail Slide Lily Pad Bridge Open Spiral Slide Arched Bridge Wave Slide

Basketball and Soccer Equipment Project Lead: Brian Mellberg & William Powell Plan to add two HEAVY-DUTY b-ball goals, one on the existing concrete pad and MCBOE is pouring a new 25 x 25 Pad for the second – two week lead times on goals Brian has approached local AYSO organization and they are willing to help with purchasing the goals.

Grade Appropriate Playground Supplies Project Lead: Quintessa Thomas The ball packs are on order, considering other suppliers such as Jump Rope etc. Plan is to have at least two b-balls, footballs, soccer balls, kick balls, and jump ropes for each grade level.

Pavilion Project Lead: Richard Wietlake & Mike Price Plan calls for a 15 x 15 foot wooden structure with a blue metal roof, located in the center of the playground. Home Depot is helping build the structure as part of a community service project. Plan calls for a 15 x 15 foot pavilion, located in the center of the playground. Home Depot is helping build the structure as part of a community service project.

Future Playground Layout New Sidewalk New Equipment New B-Ball Goals Pavilion Mulch/Juniper Soccer Goals Fencing Grass – Sod/Seed Jeff Road at the bottom, school in top right corner……

Irrigation / Sprinkler System Unscheduled Projects Replace Railroad Ties Irrigation / Sprinkler System Need to identify a Project Lead Specify design / zoning / system Obtain quotes from MCBOE approved sources Present detailed plan and request funding Landscaping / Sod Include Trees, Juniper, Mulch, & Topsoil Unscheduled projects – need help Looking for volunteers with experience in irrigation and landscaping Realistically, these are spring/summer projects. However, we need to develop these plans NOW, so that we can solicit funding. So if you are interested…PLEASE get with myself or one of the other committee members after the meeting. Or visit the PTA website and contact Mrs. Edwards. In closing, we are very excited about the active projects that are underway and hope to make a difference in our children’s development both in and outside the classrooms. Thanks you for your time. Volunteers Please Contact: PTA VP Volunteers Lorita Edwards