Generation Inputs Workshop July 24, 2014. BPA Balancing Authority Reliability Tool.

Slides:



Advertisements
Similar presentations
1 ACE Diversity Interchange. 2 ADI Pilot Project Founded on Negotiation Theory: A transaction should occur if the parties involved are either held harmless.
Advertisements

© 2009 The Williams Companies, Inc. All rights reserved. ______________ WECC November 12, 2012.
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
POTF Status update.
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
Aidan Tuohy Sr. Project Engineer NWPCC Flexibility Metric Roundtable April 2013 Metrics and Methods to Assess Power System Flexibility.
1 Utility Wind Integration Group Workshop ACE Diversity Interchange (ADI) Project Sharing Area Control Errors July 2007 Sponsoring Utilities: British Columbia.
Lisa Grow Vice President, Delivery Engineering & Operations Our Energy Future.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Bonneville Power Administration - Pumped Storage Evaluation Northwest Hydroelectric Association.
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004.
1 Generation Adequacy Task Force Report to TAC April 7, 2005.
3/16/20001 BPA’s traditional revenue stream varies with water supply (higher water conditions, higher revenues) BPA’s revenues from Slice are independent.
© 2014 HDR, Inc., all rights reserved. Catawba-Wateree Water Management Group Water Supply Planning.
Wind Turbines and Water Heaters Load Control For Providing Power System Balancing Services Ken Dragoon Renewable Northwest Project PNDRP July 2010.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Introduction to Bonneville Power Administration
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
© 2013 McNees Wallace & Nurick LLC October 17, 2013 Robert A. Weishaar, Jr. ON SITE ENERGY – INTERPLAY WITH PJM DEMAND RESPONSE PROGRAMS Harrisburg, PA.
11 Why BPA Transmission Customers Aggregate Reservations Feb. 20, 2013.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N WIAB WECC Interchange Authority Backup BY LOU MIRANDA BONNEVILLE POWER ADMINISTRATION TRANSMISSION.
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
PDCWG Report to ROS August 12, 2010 Sydney Niemeyer.
NASUCA Meeting Integration of Intermittent Renewable Resources Panel Michael McMullen MISO June 10, 2013.
Transfer Service Meeting, October 19, 2005 Bonneville Power Administration Long-Term Transfer Service (GTA and OATT) Customer Kick-Off Meeting Garry Thompson.
Large Generator Interconnection Procedures Reform Stakeholder Meeting February 19, 2009.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2009 Draft Resource Program Released: September 30, 2009 Accepting Comments until: November 30,
California Energy Commission Drought Impacts on Electricity Generation Joint Workshop on California’s Drought Response Sylvia Bender, Deputy Director Energy.
Klondike Wind Power Project, Oregon Donald Furman Senior Vice President - Business Policy and Development December 3, 2009 Energy Bar Association Mid-Year.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Transfer Service Issues Meeting Bonneville Power Administration (BPA) “Considerations” From Exhibit A, of the 20-Year Contract OTHER ISSUES AS THEY RELATE.
Montana Energy Summit April 22, 2008 Ancillary Service – Regulating Reserves.
California’s Proposed DR Cost-Effectiveness Framework January 30, 2008.
1 Demand Response: A Reliability Tool Today; A Renewable Integration Tool Tomorrow Dave Waller, VP Customer Service Hawaiian Electric Company.
©2004 PJMwww.pjm.com 1 PJM's Perspective on Reliability – Summer 2004 and Beyond Karl Pfirrmann President -- PJM Western Region FERC Summer Reliability.
City of Port Angeles Strategic Planning Workshop for Power Supply June 7, 2011 Scott Corwin Executive Director Public Power Council.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
2013 Wind Conference. Congestion Management & Communication Processes CJ Brown.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 Non-Treaty Storage Agreement non-Binding Terms for Storage Accounts.
ERS Update – DSWG Presentation September 21, 2012.
1. Non-Dispatchable Resources and EIS Market Carrie Simpson May 30,
PDCWG Report to ROS Sydney Niemeyer Chair NRG Energy Don Blackburn Vice Chair Luminant Energy.
Responsive Reserve Service Deliverability Review September 15,
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
PacifiCorp and CAISO Expanding Regional Energy Partnerships
Regional System Operator Issues Analysis Ron Lehr Western Clean Energy Advocates January 7, 2016.
BAL-001-TRE-1 CPS2 Waiver FERC-Ordered Modification to ERCOT waiver CPS2 Report to RSC December 16, 2008.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
California Senate Energy, Utilities and Communications Committee Oversight Hearing May 10, 2016 Southern California Edison Colin Cushnie Vice President,
EIM AWG July 5, Guiding Principles The intent of the group is to work collaboratively to better understand the WECC EIM costs and benefits analyses.
California Product Offerings
Wind Management at MISO
Consolidated EIM Initiatives from 2017 Roadmap Issue Paper
Current FRRS Language & Explanation of Posted Data
Pseudo-tie business procedure
Solar Eclipse Overview August 2017
MIT tour of the California ISO Control Center March 31, 2015
Proposed Energy Imbalance Market The Basics
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
Technical Committee Meeting January 27, 2012
NERC Congestion Management
Pseudo-tie business procedure
Presentation transcript:

Generation Inputs Workshop July 24, 2014

BPA Balancing Authority Reliability Tool

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Balancing Authority Reliability Tool BA Reliability Tool and System Reliability  The reliability of the system is at risk if BPA is unable to maintain load and resource balance in the balancing authority area because of extreme generator station control errors (SCE).  The BA reliability tool is being designed to reduce generation station control error on the system when available balancing reserve capacity is exhausted to prevent the occurrence of a system emergency.  For example, generation station control error may exceed available balancing reserve capacity from both the Federal system and third parties, as was observed this past Spring.  During these rare events, BPA must be able to take steps to mitigate adverse impacts to system reliability. July 24, 2014 Generation Inputs Workshop Predecisional. For Discussion Purposes Only. 3

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Balancing Authority Reliability Tool  Expands operational reliability protocols to all non-controlling generation in the BA. – The Big 10 Generation (10 Federal Dams on the Columbia River and lower Snake River) are the excluded units, as they provide the FCRPS balancing reserves. – During over-generation events, plants must reduce generation to relieve the reliability event. – During under-generation events, schedules (or eTags) are curtailed to relieve the reliability event. – For Level 1 events (90% of balancing reserves deployed), reserve allocations are given to generators to allow for deviation from schedule within acceptable ranges. – For Level 2 events (currently 100% of balancing reserves deployed), The system must have already recently experienced a Level 1 event. No reserve allocations are given to greater assist the system in getting back to a reliable state. July 24, 2014 Generation Inputs Workshop Predecisional. For Discussion Purposes Only. 4

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Balancing Authority Reliability Tool  “Netted” groups of plants will be allowed to combine their SCEs and reserve allocations for BA Reliability Tool events. – A “netted” group will combine its SCE for diversity benefits and its allocation of reserves for a larger operational deadband. – For under-generation (INC) events, when/if the group is subject to a curtailment, the curtailment amount will be a pro-rata curtailment applied across the plants within the netted group who are outside of their INC allocation. For Level 1, this would be the difference between the “netted” group’s basepoints and the “netted” group’s generation plus allocated reserves. For Level 2, this would be the difference between the “netted” group’s basepoints and the “netted” group’s generation. July 24, 2014 Generation Inputs Workshop Predecisional. For Discussion Purposes Only. 5

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Balancing Authority Reliability Tool  “Netted” groups, continued – For over-generation (DEC) events, the “netted” group must keep their combined generation below: For Level 1, this would be the “netted” group’s basepoint (schedules) plus allocated DEC reserves For Level 2 this would be the “netted” group's basepoint (schedules). – Any parties who wish to sign a netting agreement together may form a netted group, including different owners/operators and different resource types (VER, DER, etc.).  Link to existing documentation: controls.aspx controls.aspx July 24, 2014 Generation Inputs Workshop Predecisional. For Discussion Purposes Only. 6

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Balancing Authority Reliability Tool: Under-Generation (INC) Events  Under-generation events are the times where the BA uses all (or a majority) of it’s INC balancing reserves due to: – Under-generation of non-controlling generation within the BA – Over-consumption of loads within the BA  For under-generation (INC) events, generators will automatically have their schedules (eTags) curtailed by: For Level 1, the difference between their basepoint (sum of schedules) and generation plus allocated INC reserves For Level 2, the difference between their basepoint (sum of schedules) and generation No generator operator action is required.  It is BPA’s intent to apply the under-generation BA Reliability Tool events to all non-controlling generation within the BPA BAA. July 24, 2014 Generation Inputs Workshop Predecisional. For Discussion Purposes Only. 7

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Balancing Authority Reliability Tool: Under-Generation (INC) Events  Behind-the-Meter Generation will be exempt from BA Reliability Tool Under-Generation (INC) Events, due to these generators: – Only serve internal load – Do not have eTags to curtail; They submit generation estimates only. – BPA would receive no relief from the reliability event by altering their basepoints. – These projects amount to 195 MW of thermal generation and 294 MW of hydro generation in the BPA BAA. July 24, 2014 Generation Inputs Workshop Predecisional. For Discussion Purposes Only. 8

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Balancing Authority Reliability Tool: Over-Generation (DEC) Events  Over-generation events are the times where the BA uses all (or a majority) of it’s DEC balancing reserves due to: – Over-generation of non-controlling generation within the BA – Under-consumption of loads within the BA  For over-generation (DEC) events, generators must keep their generation below: – For Level 1, the requirement is the generator’s basepoint (sum of schedules) plus allocated DEC reserves – For Level 2, the requirement is the generator’s basepoint (sum of schedules)  It is BPA’s intent to only apply the over-generation BA Reliability Tool events to variable generation (VER) within the BPA BAA. July 24, 2014 Generation Inputs Workshop Predecisional. For Discussion Purposes Only. 9

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Balancing Authority Reliability Tool: Over-Generation (DEC) Events  Dispatchable Energy Resources (DER) would not be subject to the Over-Generation (DEC) side of the BA Reliability Tool – These include federal non-VER/non-controlling generation, thermal generation and non-federal hydro generation in the BPA BAA. – Historical analysis of over-generation events has not revealed DERs as a contributing factor. – The two-way communication required to reliably participate in the over- generation side of the BA Reliability Tool is virtually non-existent for DERs. Four existing DER generators in the BPA BAA have this equipment installed. Installation of this equipment posses a significant cost to BPA and the DER resources. A best-case timeline for the design, construction and testing of new two-way communication for all DERs is well beyond the FY Rate Period. July 24, 2014 Generation Inputs Workshop Predecisional. For Discussion Purposes Only. 10

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Balancing Authority Reliability Tool: Over-Generation (DEC) Events  Dispatchable Energy Resources (DERs) would not be subject to the Over-Generation (DEC) side of the BA Reliability Tool, continued. – DERs are already subject to several rates/costs that incentivize them to decrease generation to schedule. July 24, 2014 Generation Inputs Workshop Predecisional. For Discussion Purposes Only. 11 Dispatchable Gen (DER)Variable Gen (VER) Generation Imbalance Band 3?Subject to itNot subject to it ACS Rate StructureUse Based RateNameplate Based Flat Fee Accurate Scheduling Incentive?Persistent DeviationIntentional Deviation PTC/REC Compensation? No; with minor exceptions for Biomass Yes; One or Both Fuel Cost?Over-gen results in expenseNo cost for fuel Capability of Technology? Slower Movement (Governor Actions) Fast Movement (Power Electronics) Interdependent on other industrial processes? Yes for Co-GensNo

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Balancing Authority Reliability Tool Reserve Allocation Example  Today (July 2014), BPA holds 942 MW of INC Balancing Reserves – VER generators are allocated 569 MW of the total – Because BPA will not drop load (unless directed by the RC and/or an Energy Emergency Level 3 is reached) and not all generators/loads are going to be off at the same time in the same direction, the remaining 373 MW of INC reserves can get spread among all of the non-VER/non-AGC generation Federal Non-VER Non-AGC Generation = 3467 MW Nameplate Non-Federal Non-VER Non-AGC Generation = 3948 MW Nameplate – Non-Federal Non-VER Non-AGC Generation would receive a pro-rata INC allocation of 199 MW = 373 * 3948 / ( ) – Non-Fed Non-VER Non-AGC Generation would receive 199 MW, which would spread out as the greater of 4.75% of nameplate (rounded to the nearest MW) or 1 MW. These generators could opt to form a netted group to potentially shield each other. July 24, 2014 Generation Inputs Workshop Predecisional. For Discussion Purposes Only. 12

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Balancing Authority Reliability Tool  Sample Curtailment Event #1 July 24, 2014 Generation Inputs Workshop Predecisional. For Discussion Purposes Only. 13

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Balancing Authority Reliability Tool  Sample Curtailment Event #2 July 24, 2014 Generation Inputs Workshop Predecisional. For Discussion Purposes Only. 14

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Balancing Authority Reliability Tool  BA Reliability Tool Development – Design details will be further flushed out in Spring/Early-Summer 2015 – A customer meeting will be set up to discuss the final draft design and seek customer comment This may be in the form of an JOC meeting, ACS Meeting and/or Rate Case Workshop – Implementation will be October July 24, 2014 Generation Inputs Workshop Predecisional. For Discussion Purposes Only. 15