ELK MEADOWS HOA Water Master Plan (Supply, Treatment, Distribution, and Storage) May 2005.

Slides:



Advertisements
Similar presentations
Arsenic/Iron Co-Precipitation and High Rate Filtration in the City of Portage Christopher Barnes, P.E., City of Portage Kendra Gwin, P.E., City of Portage.
Advertisements

1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
DESIGN LAYOUT OF DISTRIBUTION SYSTEMS
C. T Calculation Math for Water Technology MTH 082 (pg. 468) Math for Water Technology MTH 082 (pg. 468) “Required by Law”
The Town of Discovery Bay Community Services District Wastewater Treatment Plant Master Plan NOVEMBER 9, 2011.
TEXAS COMMISSION on ENVIRONMENTAL QUALITY. PROPOSED STUCTURE FOR CHAPTER 217 < Subchapter A Administrative Provisions < Subchapter B Design Bases < Subchapter.
Washington State Department of Health Division of Environmental HealthOffice of Drinking Water Mike Dexel Water Resources Policy Lead Municipal Water Law.
Water Services Department Arizona Mexico Commission Bi-National Meeting March 9-11, 2008 David Cavazos Deputy City Manager Water Services Department Arizona.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
Brushy Creek Municipal Utility District Water Facility Project Status Update Presented at April 9, 2009 Board Meeting Joseph Jenkins, P.E., CH2M HILL.
Surface Water Treatment Plant
Managing Water Shortage for Livestock Operations Shawn Shouse ISU Extension Ag Engineer.
Seismic Improvement Program Presented to: The Northern California Earthquake Hazards Workshop February 12, 2014.
City of Willits WTP Design and Funding Procurement Update February 24 th City Council Meeting Scott Buecker, P.E.
Rule Change Update MPCA 1/13/ Mid-Sized ISTS (MSTS)
BOB BROZ UNIVERSITY OF MISSOURI EXTENSION (573) ISE #78 WATER MANAGEMENT STRATEGIES FOR DROUGHT MITIGATION AND SUSTAINABLE AGRICULTURAL PRODUCTION.
Sustained Compliance for Public Water Systems, Chapter 2, Workshop Department of Environmental Conservation Drinking Water Program Anchorage, September.
The City of North Bend Sanitary Sewer System
11 City of Hallandale Beach Water, Wastewater and Stormwater Facilities Plan Public Meeting.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems  Filtration avoidance criteria  Alternatives to Filtration.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration.
NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration? ä Where should the plant(s) be located?
Cornerstone Engineering Group The Foundation for Your Civil Engineering Needs Camanche Reservoir Water Treatment Plant Project Cecilia Zamora Evangelina.
Molalla Water Treatment Plant Field Trip 4/24/07 Molalla Water Treatment Plant Field Trip 4/24/07.
POTABLE WATER CVEN 451 Term Project. Demand Estimate Water Use Average Flow (GPD/Capita ) # of People ADD (GPD ) MDD^ (ADD*2.4) PHD^ (MDD*1.85) Residential.
EXISTING OVERALL PLAN | UICN Plant 3 and Willow Creek Golf Course Figure 1 – Existing Overall Plan Legend Lien Holder (498,584 SF or 12 Acres) UICN (7,000,103.
Distribution System Control Strategies.  Tank Management/Operations  Flushing  Rerouting Water  Others  optimizing existing booster chlorination.
 Groundwater Supply ◦ Quantity ◦ Quality  Infrastructure ◦ Treatment ◦ Transmission ◦ Distribution  Response Plans ◦ Long-term ◦ Short-term ◦ Emergencies.
WATER DEPARTMENT BUDGET WORKSHOP FY16 RECOMMENDED BUDGET March 12, 2015.
LONG-RANGE PLANNING FOR SMART-WATER NETWORK IN BOSTON APRIL 17,2015 John P. Sullivan, P.E. Chief Engineer and Operations Officer.
WESTERN CARY WATER STORAGE TANK Town of Cary Preliminary Engineering Report Progress Meeting June 8, 2015.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
City of Polson April 5, 2010 PUBLIC HEARING Water System Improvements PRESENTATION ON PRELIMINARY ENGINEERING REPORT.
1. DWS NPDES Permit Enrollment   Who is required to enroll Water Purveyors that are Community Drinking Water Systems (CDWS) with 1000 connections or.
February 24, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
2015 Needs Assessment Our Strategy for Success Scott Torpie Washington State Office of Drinking Water.
SPWSTAC 2006 From POU to Centralized Arsenic Treatment: A Small Water System Case Study 2006 NGWA Naturally Occurring Contaminants Conference J. Mitchell.
The Orange County Water District Riverbed Filtration Pilot Project Jason Keller 1, Michael Milczarek 1, Greg Woodside 2, Adam Hutchinson 2, Adam MP Canfield.
Future Water Supply - for the Ashley Valley D. Gerard Yates Central Utah Water Conservancy District.
Effective Project Planning, Community Capacity Building, & Partnership Development in Indian Country LT Bradley Sherer Environmental Engineer Indian Health.
Best for the Buck: Using Asset Management for Project Design at Highline Water District Matthew J. Maring, P.E. April 30, 2008.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Infrastructure management system Managers and engineers need clear guidelines for life-cycle management of infrastructure systems for water, sewer, and.
Portland Drinking Water. Bull RunBull Run--Source primary drinking water supply for Portland Located 26 miles from downtown Portland in Sandy River basin,
STATE OF OREGON WATER EFFICIENCY STANDARDS PNWS-AWWA Conference Eugene, Oregon May 2014 Lisa Jaramillo Water Right Services Division Oregon Water Resources.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
Investing In Our Future. Statement from Mayor Tom Murphy “The Gillette Regional Water Supply Project is essential for quality of life and economic development.
1 NORTH VALLEY REGIONAL WATER AND WASTEWATER PROJECTS MEETING OF THE NEW MEXICO-TEXAS WATER COMMISSION May 19, 2005.
Water Treatment Plant Austin and Alison.
EXPANSION OF BRUNSWICK COUNTY’S NORTHWEST WATER TREATMENT PLANT Public Utilities.
Webster Water System Board of Selectmen Public Hearing on Water Quality October 13, 2015 Doran Crouse, Webster Water Department Scott Charpentier, P.E.,
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
University of Wyoming Environmental Engineering Senior Design Team Leah Birgen Brent Brouillard.
1 EASTERN MUNICIPAL WATER DISTRICT Water Supply Strategic Plan Brian Jack Powell, P.E. Director of Planning June 17, 2015.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
WATER SYSTEM WORKSHOP February 27, 2012
Water Supply Municipal Water Demand Civil Engineering Department Faculty of Engineering and Technology The University of Jordan Instructor: Ghada Kassab,
Water Filtration Plant Improvements Project Summary
Lecture (11): Water Distribution Systems
Recycled Water Project Basis of Design Report
GOOSE CREEK WATERSHED LEVEL I STUDY SCOPING MEETING
DORSET Water System Information Meeting
Pilot testing services and a case study to reduce organics Devendra Borikar, Laura Zettler, Jeff Avedesian, Lindsay Ariss, Luc Léonard, Denis Dolbec,
City of Roundup, Montana
Class III Estimate for Regional Consolidation
ENG421 (5c) – Water Treatment Plant Costs
Southwest Section AWWA 2018 – Baton Rouge, LA
City of Sunrise Wastewater Reuse Program
Metropolitan Tunnel Redundancy Program Update
Presentation transcript:

ELK MEADOWS HOA Water Master Plan (Supply, Treatment, Distribution, and Storage) May 2005

OBJECTIVES  Evaluate Existing Water Supply and Water Treatment Facilities  Hydraulic Modeling  Recommend Improvements for a Buildout System (Without Fireflow Protection )  Recommend Improvements for a Buildout System (With Fireflow Protection)  Recommend Improvements for Water Supply, Treatment and Distribution  Estimate Costs and Investigate Funding Alternatives for Recommended Improvements

PROJECT APPROACH  Collect Background Information  Review CDPHE and EPA Requirements  Conduct Site Investigations  Inventory and Photograph Existing Facilities  interview System Operator(s)  Hydraulic Analysis with WaterCAD® Software  Develop Water Demands  Evaluate Existing Facilities (Max Day, Peak Hour)  Model Short-Term and Long-Term Alternatives

WATER SUPPLY SOURCES Groff Spring  Classified as ‘Directly Under Influence of Surface Water’  Produces 28,000 gpd (20 gpm)  High Raw Water Turbidity (5 NTU up to 100 NTU)  No Hazardous Metals, Volatile Organics Elk Meadows Well  Completed in May 2003 as Supplemental Source  Produces 15,000 gpd (10 gpm)  Acceptable Raw Water Quality  No Hazardous Metals, Volatile Organics Most recent boil-order in May of Water rights allow a TOTAL of 53,800 gpd (37gpm) for combined well and spring source.

WATER DEMAND SUMMARY *Estimated from Operations Data During for 2004 per Elk Meadows HOA. ** Assumes Average Annual Demand: Peak Hour Demand Factor = 4.00 (Mayes, 2000). CONNECTION TYPE NUMBER OF CONNECTIONS 2004 SCENARIO (gpcd) BUILDOUT SCENARIO (gpcd) Average Day Demand (gpcd) Maximum Day Demand (gpcd) Average Annual Demand (gpd) 2004 Max Day Demand (gpd) 2004 Peak Hour Demand (gpd) Max Day: Avg Day Factor Peak Hour: Avg Day Factor4.00** 11,520* 36,100* 46,080** 3.10

WATER TREATMENT PLANT

 Building is 30 Years Old  Upgraded in 2002 To Include Coagulation and Pressure Filtration  Hypochlorite Disinfection  No Baffling in Clearwell to Provide Chlorine Contact Time  Currently Backwashes with Raw Water (not allowed by CDPHE)  Inappropriate for higher turbidity (>5 NTU) Raw Water per (CDPHE)  Backwash Wasted to Unlined Pond (not allowed by CDPHE)  Need Additional Treatment Capacity  No Redundancy or Expandability

WATER TREATMENT Existing WTP  Capacity of 22,680 gpd  In-line Flocculation Coagulant Added to Raw Water Forms ‘Flocs’  Pressure Filtration Bag Filter Redundancy Effluent to Disinfection

WATER TREATMENT Wet Well Groff Spring Well Pressure Filter Sodium Hypochlorite Bag Filter Unbaffled Clear Well Raw Water Backwash PAC Coagulant (Alum) To Distribution & Storage

FILTRATION Vertical Pressure Filter  2-ft Diameter Yardney®  3.15 ft 2 Filtration Area  Current Filtration Rate = 8 gpm/ft 2  CDPHE Max. Filtration Rate = 5 gpm/ft 2 Bag Filter  Strainrite®  Filters Down to 1.0 Micron

WATER TREATMENT OPTIONS *Present worth analysis assumes life cycle = 20 years and rate of return = 8% APR. **Engineering & Admin. is approximately 15% of construction subtotal. RETROFIT EXISTING WTP  Add 2nd New Pressure Filters  Additional Building Space Required  Install larger capacity Backwash Pump That Draws from Clearwell  Install Baffles in Clearwell  May or May Not Fix Finished Water Turbidity NEW WTP OPTION  New Building with Package Plant or Membrane Plant  Install Baffles in Clearwell  More Expensive than Retrofitting Existing WTP  Will Handle Peaks in Raw Water Turbidity  Long-term Solution

DISTRIBUTION SYSTEM

EXISTING DISTRIBUTION SYSTEM

WATER DISTRIBUTION SYSTEM  Serves 80 Unmetered Connections  Most Piping is 30 Years Old  Comprised largely of 2-inch Diameter Piping  Materials Vary from PVC to HDPE  Problems with Pipe Leaks and Freezing  HOA Incurs Significant Costs for Repairs and Replacement ($150,000 from 2000 to 2004)  No Fireflow Protection  No Hydrants

EXISTING HYDRAULIC PROFILE  Single 5-HP Transmission Pump Located at WTP  12,000-gal Tank Serves Zones Through PRVs  CDPHE Pressure Criteria Maximum = 100 psig Minimum = 35 psig  Pressure Zone Boundaries Zone 1 = 8,500 to 8,580 ft Zone 2 = 8,581 to 8,719 ft Zone 3 = 8,720 to 8,864 ft

STORAGE

Storage  12,000-gal Capacity  Aged  Serves Entire Community  Need Additional Capacity

WATER STORAGE NEEDS STORAGE COMPONENT CDPHE REQUIREMENT with FIRE (GALLONS) CDPHE REQUIREMENT without FIRE (GALLONS) Fireflow120, Domestic Buildout Domestic 60,000* 100,000 60,000* 100,000 Emergency00 Operational00 TOTAL AT BUILDOUT220,000120,000 *CDPHE requires 300 gallons per capita; Assumes 80 homes with 2.5 persons per home.

HYDRAULIC MODEL

HYDRAULIC ANALYSIS  Haestad Methods WaterCAD®  Steady-State Analysis  Multiple Scenarios 2004 Max Day 2004 Peak Hour Buildout Max Day Buildout Max Day + Fireflow  Identify Problems  Two Buildout Scenarios Option I – No Fireflow Protection Option II – Provide Fireflow Protection

HYDRAULIC ANALYSIS RESULTS  Reservoir Drains During Max Day Demand  Low Pressures in Zone 3 at Peak Hour (<20 psig)  Max Day Demand Approaching Available Water Supply  Max Day + Fire Demand Indicates Significant Piping and Storage Improvements Needed  Modeled Buildout System Without Fire Protection  Modeled Buildout System With Fire Protection

SHORT-TERM IMPROVEMENTS

ID, DESCRIPTION UNITSQUANTITYCOST ST 1A, Add 2” PRV Zone 3 to Zone 2EA1$ 9,000 ST 1B, New Zone 3 Piping (3” DIA)LF850$ 13,000 ST 2, Zone 2 Looping (3” DIA)LF240$ 3,600 ST 3, Zone 3 Looping (3” DIA)LF460$ 6,900 ST 4, New Pipe from WTP to Zone 3 (3” DIA)LF2,670$ 40,000 ST 5, Line Replacement (Replace w. 3” DIA)LF5,000$ 75,000 Existing Well EnlargementLS1$ 7,500 Remedial Treatment PlantLS1$ 6,000 SUBTOTAL$ 161,000 ENGINEERING AND ADMINISTRATION (20%)$ 32,200 TOTAL PROJECT COST$193,200

BUILDOUT SYSTEM SCENARIOS  Option I – Maximum Day Demand Only (No Fire) Implement all Short-Term Improvements Recommend All New Piping be 3-inch Diameter or larger  Option 2 – Maximum Day Demand (+ Fire)  Implement all Short-Term Improvements  All New Piping 6-inch Diameter  Require 6-inch Fire Hydrants  Use 1997 UFC Requirement of 1,000 gpm at 2-hour Duration with Residual Pressure of 20 psig = 120,000-gal Storage

OPTION 1 IMPROVEMENTS (NO FIREFLOW PROTECTION)

OPTION 1 SYSTEM COSTS ID, DESCRIPTION UNIT S QUANTIT Y INSTALL ED COST O1-1, West Zone 3 Piping (3” DIA) LF1,000$15,000 O1-2, East Zone 3 Piping (3” DIA) LF620$9,300 O1-3, Central Zone 3 Piping (3” DIA) LF1,460$21,900 O1-4, Zone 2 Loop Piping (3” DIA) LF940$14,100 New Coated Steel Storage Reservoir MG0.100$70,000 SUBTOTAL$130,300 ENGINEERING & ADMIN. (20%)$26,000 TOTAL PROJECT COST$156,300 The costs in do not include new water meters, improvements to the WTP or maintenance costs for existing piping, which are included in the short-term improvements and should also be budgeted in the HOA’s capital improvements plan. Also, the storage volume is the minimum domestic storage required by the CDPHE and doesn’t include an emergency storage component.

OPTION 2 IMPROVEMENTS (FIREFLOW PROTECTION)

OPTION 2 SYSTEM COSTS ID, DESCRIPTION UNITSQUANTITY INSTALLED COST O2-1, Zone 3 Piping (8” DIA)LF4,250$170,000 O2-2A, Zone 3 Piping (6” DIA)LF10,430$313,000 O2-2B, Zone 3 Fire HydrantsEA12$12,000 O2-3A, Zone 2 Piping (6” DIA)LF6,340$190,200 O2-3B, Zone 2 Fire HydrantsEA4$4,000 O2-4, New PRVs with VaultsEA1$40,000 O2-5A, Zone 1 Piping (6” DIA)LF320$9,600 O2-5B, Zone 1 Fire HydrantsEA1$1,000 New Storage ReservoirMG0.220$110,000 SUBTOTAL$849,800 ENGINEERING & ADMIN. (20%) $170,000 TOTALPROJECT COST$1,020,000 The costs in do not include water meters or improvements to the WTP present an economic challenge for the Elk Meadows HOA and residents. Funding options available for financing these improvements are discussed in Section 6.3. Also, the improvements could be phased over a long period with the storage reservoir and Zone 3 piping improvements taking priority over improvements in Zones 1 and 2. This is due to the fact that Zone 3 piping and PRVs provide storage and distribution to Zones 1 and 2 and any restrictive piping in Zone 3 would be apparent in the downstream Zones.

SUMMARY OF RECOMMENDED SYSTEM IMPROVMENTS Project DescriptionProject Cost Short-Term Improvements$ 193,000 Option 2 (Build-out with Fire)$ 958,000 Additional Source Development$ 100,000 Treatment Plant Replacement$ 500,000 Meters$ 70,000 Total $ 1,821,000

ALTERNATIVE SYSTEM IMPROVMENTS Project DescriptionProject Cost Short-Term Improvements$ 177,000 Option 1 (Build-out with Fire)$ 199,000 Additional Source Development$ 100,000 Treatment Plant Upgrades (if permittable) $ 75,000 Meters$ 50,000 Total $ 601,000

FUNDING OPTIONS  Colorado Rural Water Association - Loans  Colorado Water Conservation Board - Grants Up to 75% of Project Cost  Department of Agriculture - Grants and Loans Objective to Improve Rural Areas Priory Given for Public Safety Projects  Department of Local Affairs (DOLA) Offers Grants and Loans  Other (595, Special Legislative Grants, etc.)  In general, Government Grants require formation of a legal Governmental Entity (i.e. District)  Low to Moderate Income Eligibility (Income Survey)