Burkard Reisert June 11 th, 2004 Fermilab, High Rise, Hornet Nest Pulsar Meeting Ted’s overview talk: Pulsar production/testing success !  all hardware.

Slides:



Advertisements
Similar presentations
Questionnaire Response
Advertisements

Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
 Project Overview & System Integration Ted Liu June 11th, 2004 Fermilab, High Rise, Hornet Nest Pulsar Meeting.
Final Commissioning Plan and Schedule Cheng-Ju Lin Fermilab Installation Readiness Review 09/27/2004 Outline: - Work to be done during shutdown - Work.
Slink TX Slink merger Teststand setup Slink merger firmware and testing Firmware features - DAQ RAMs for saving out input and output data - Possible to.
PXL RDO System Requirements And meeting goals 11/12/2009BNL_CD-1_SENSOR_RDO - LG1.
Introduction Ted Liu, FNAL Feb. 9 th, 2005 L2 Pulsar 2rd IRR Review, ICB-2E, video: 82Pulsar
Summary Ted Liu, FNAL Feb. 9 th, 2005 L2 Pulsar 2rd IRR Review, ICB-2E, video: 82Pulsar
A presentation by Angela Little SULI Program 8/4/04 Pulsar Boards and the Level II Trigger Upgrade at CDF.
1 Pulsar firmware status March 12th, 2004 Overall firmware status Pulsar Slink formatter Slink merger Muon Reces SVT L2toTS Transmitters How to keep firmware.
1 Pulsar firmware status June 11th, 2004 Slink format Transmitter firmware Transmitter firmware status Receiver firmware overview Receiver firmware status.
Using the Trigger Test Stand at CDF for Benchmarking CPU (and eventually GPU) Performance Wesley Ketchum (University of Chicago)
1 MICE/AFE II t Update IIT Analog Front End (AFE) Test Stand AFE Conceptual Design Report (CDR) Terry Hart, Illinois Institute of Technology, February.
Pulsar System Overview and Commissioning Plan Cheng-Ju Lin Fermilab Installation Readiness Review 02/08/2005 Outline: - Items from last review - Pulsar.
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
XTRP Hardware Mike Kasten University of Illinois 2/24/00.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Cluster Finder Report Laura Sartori (INFN Pisa) For the L2Cal Team Chicago, Fermilab, Madrid, Padova, Penn, Pisa, Purdue.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
Technical Part Laura Sartori. - System Overview - Hardware Configuration : description of the main tasks - L2 Decision CPU: algorithm timing analysis.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Commissioning Experience and Status Burkard Reisert (FNAL) L2 installation readiness review:
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
1 Pulsar Design Mircea Bogdan Level 2 Pulsar - Production Readiness Review Friday, Nov.7, 2003.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
Svtsim status Bill Ashmanskas, CDF simulation meeting, Main authors: Ashmanskas, Belforte, Cerri, Nakaya, Punzi Design goals/features: –main.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
For more information on Pulsar board: Burkard Reisert (FNAL) Nov. 7 th, 2003 PULSAR Production Readiness.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
L2 Upgrade review 19th June 2007Alison Lister, UC Davis1 XFT Monitoring + Error Rates Alison Lister Robin Erbacher, Rob Forrest, Andrew Ivanov, Aron Soha.
5/7/2004Tomi Mansikkala User guide for SVT/XTRP TX firmware v1.0 XTRP out Control FPGA Tomi: - Introduction - Control bit descriptions - Test Pattern format.
Simple ideas on how to integrate L2CAL and L2XFT ---> food for thoughts Ted May 25th, 2007.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
Tracker Week October CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel University,
SP04 Production Lev Uvarov RICE Muon Trigger Meeting August 27, 2004.
Domino Ring Sampler (DRS) Readout Shift Register
Project Overview Ted Liu Fermilab Sept. 27 th, 2004 L2 Pulsar upgrade IRR Review
L2 Status and Plan Matt Worcester, Heather Ray, Monica Tecchio, Myron Campbell, Jane Nachtman, David Saltzberg, Tom Wright, Steve Kuhlmann, Karen Byrum,
Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, 2000 Level 2 Calorimeter and Level 2 Isolation Trigger Status Report Monica Tecchio University.
Online monitor for L2 CAL upgrade Giorgio Cortiana Outline: Hardware Monitoring New Clusters Monitoring
New L2cal hardware and CPU timing Laura Sartori. - System overview - Hardware Configuration: a set of Pulsar boards receives, preprocess and merges the.
Pulsar Status For Peter. L2 decision crate L1L1 TRACKTRACK SVTSVT CLUSTERCLUSTER PHOTONPHOTON MUONMUON Magic Bus α CPU Technical requirement: need a FAST.
Electronics for HPS Proposal September 20, 2010 S. Boyarinov 1 HPS DAQ Overview Sergey Boyarinov JLAB June 17, 2014.
Pulsar Status Report Ted Liu Friday Trigger Meeting, May 10th. 02 PULSAR: PULSer And Recorder Pulsar design overview:  from L2 teststand tool to a general.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
L2TS and Plan for Integration Cheng-Ju Lin Fermilab Pulsar Meeting 06/11/2004.
First group planning meeting: Introduction Introduce new people A brief history of time Goals of this meeting Project overview Roadmap Guideline for the.
L2toTS Status and Phase-1 Plan and Pulsar S-LINK Data Format Cheng-Ju Lin Fermilab L2 Trigger Upgrade Meeting 03/12/2004.
L2 CAL Status Vadim Rusu For the magnificent L2CAL team.
Gueorgui ANTCHEV PH-TOT TOTEM Collaboration Meeting – March TOTEM System in H8 - Overview, Block Diagram and Main Characteristics Applications -
Pulsar Hardware Status Burkard Reisert (FNAL) March, 14 th 2003.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
16th May 2007 MICE tracker phone meeting 1 Setup test bench/ Installation DATE Hideyuki Sakamoto 16 th May 2007 MICE phone meeting.
XTRP Software Nathan Eddy University of Illinois 2/24/00.
TELL1 readout in RICH test: status report Gianluca Lamanna on behalf of TDAQ Pisa Group (B.Angelucci, C.Avanzini, G.Collazuol, S.Galeotti, G.L., G.Magazzu’,
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
ATLAS Pre-Production ROD Status SCT Version
Initial check-out of Pulsar prototypes
NUUO Tools Welcome to NUUO general education service. This session allows users to have the overview of NUUO tools for system design. (Click)
Update on CSC Endcap Muon Port Card
Pulsar WG Meeting (C-J Lin)
University of California Los Angeles
Tracker Software Status
L2 CPUs and DAQ Interface: Progress and Timeline
Sector Processor Status Report
FED Design and EMU-to-DAQ Test
Presentation transcript:

Burkard Reisert June 11 th, 2004 Fermilab, High Rise, Hornet Nest Pulsar Meeting Ted’s overview talk: Pulsar production/testing success !  all hardware in place (see Burkard’s talk) New VME DAQ readout code in place (see Jane and Burkard’s talk) Pulsar crate almost FULL  platform for integration in place (see Burkard’s talk) Lots of stuff to cover: Title on Agenda: Muon/XTRP/L1/SVT/Merger readiness Ted’s Beam tests coordination. "In God we trust, everything else we test with beam" come up with plans on how to do this. train people to rotate on weekly bases... all requests coordinate with trigger SPLs. setup web page for instructions...etc. plans... train people in the next few weeks for all data paths. start rotation by end of month.

Test Stand for Production Testing TS L1 Mezz. VME access Internal RAM and SRAM Internal com. TS interface SVT/XTRP L1 Signals Mezzanine card Interface Slink Interface AUX Tx Rx Mezz. SVT/XTRP SLINK

Production batch: 45 boards 43 delivered (2 more to be assembled) 24 w/o P3 connector 15 boards w/o P3 available for SVT all boards passed Pulsar test stand test and SVT RW test stand tests (~10 boards w/ P3 have been tested for SVT as well) 5 out of 43 had minor problems 2 already fixed, HR, 1 demo for Zita Young (our summer student)  Very successful production & testing PULSAR Production Testing (~Last Month) Up to 9 boards tested per day

Test of Slink formatter on Muon board: - standalone (with Pulsar Tx) March - in beam (Muon input splitted, DAQ readout for Muon and Merger Input) April - release Slink formatter for use on other paths April SLink Formatter & Slink Merger (schedule as given on 03/12/04, revisited 04/22/04) Beam Test of Slink Merger: - Merge Muon Slink package with other Slink inputs DAQ readout of Merger inputs and outputs May - Platform for system integration in June Working hard to make it happen Conclusion: on Track Slink Tx for now Some data recorded, but not looked at It’s coming !

Move test stand setup to Pulsar crate in Trigger room Input to Muon Pulsar: split muon signals and Pulsar XTRP Test pattern Enable one input on Slink Merger Some DAQ issues: - FER code overwrites SLink input enable register - only 2 fiber inputs per FPGA  FER expects 8 work around: use standalone Pulsar VME code to - load proper values manually in RC CONFIG state - Dump Muon and SLink DAQ RAMs in RC HALT state  Cosmic and L2 Torture runs look promising muon fibers Muon Rx Muon & Slink Merger Installation in Trigger Room SLink Merger XTRP SLink formatter XTRP Tx L2 Muons CDF RunIIa “  ” April 21 th

muon fibers Muon Rx April 22 nd Status in Trigger Room SLink Merger XTRP Tx L2 Muons CDF RunIIa “  ” 16/48 RECES Reces Rx Cluster Rx CList & IsoList Muon Rx L2 Muon  Merger Reces Rx Reces  input DAQ Output  SLink Tx Cluster Rx Cluster  input DAQ Output  SLink Tx Plan for next week: -- solve DAQ issues -- go for Cosmic, L2Torture & Beam  Fibers are split

DAQ issues: Why we needed a new Readout? Readout of 1 board takes 0.7 ms ! Why? 1 board full cycle 2 boards full Data volume Front end readout: Overhead ~ 5  s block transfer setup time ~ 0.5  s/word Same as most CDF boards (hadron TDC is twice as fast)

New parameters Dial number of words per DAQ RAM Board level Readout list Deal with remapped Fiber Input DAQ Solution: more flexible Readout Configurartion: C0C0 C1C1 D1 0 D1 1 D2 0 D2 1 Muon var Reces SVT var (var) Cluster var---8*64---8*64--- Merger var---var (var) L2toTS --- var--- Thanks to Bill & Jane

While new DAQ code was developed We made use of COT downtime during store  read two boards Muon Rx SLink Merger XTRP L2 Muon Slink Tx XTRP Tx Compare: Muon Output  Slink Merger (input & output) Test pattern  Slink Merger (input & output)  50k events 0 errors ready to distribute Slink Formatter Beam test of Slink Merger

Firmware factory LVDS Fanout board L1 SVT XTRP TS Clist These guys have been busy as bees while the new DAQ code was developed.

Pulsar methodology at work at its best: Testing of the new DAQ Code Reces Rx SLink Merger SVT SVT Rx Reces Tx SVT Tx Reces Fibers SLink Tx Enjoy the flexibility of the new readout code e.g.: readout 1,2,3 Pulsars 1,2,6 Buffers etc.. Add some features, fix some bugs ready for prime time!

Pulsar Crate in Trigger Room B0L2PU00 Muon (w/o L1) XTRP L2 Muons Run IIa Level 2 Decision Crate  - Processor 1/3 RECES Reces Cluster SVT CList Master CList ISOList MergerSlink Rx Pulsar Tx B0L2PU00 Level2_Pulsar_00 Tx crate is filling up (= SVT DataIO)

TRACERTRACER SVTSVT RECESRECES CLUSTERCLUSTER SLINKMERGERSLINKMERGER CRATECPUCRATECPU TRACERTRACER MUON /XTRPMUON /XTRP SLINKRX SVTSLINKRX SVT RECESRECES CLUSTERCLUSTER TXRECES&SVTTXRECES&SVT SLINKMERGERSLINKMERGER SLink Tx CRATECPUCRATECPU TRACERTRACER MUON MUON L2TS?L2TS? CLUSTERCLUSTER RECESSVTRECESSVT CRATECPUCRATECPU RECESRECES RECESRECES RECESMERGERRECESMERGER MUON /XTRPMUON /XTRP L2TS?L2TS? Future Pulsar crate (one possible config.) Present Pulsar Crate RECES XTRPRECES XTRP RECESRECES Pulsar Transmitter crate Boards w/o P3 fit in “Bottom  ” crate We have Hardware (Pulsars, Mezz., Aux. fiber & LVDS splitters) the DAQ Code (new TP2D) the Monitoring frame work We need to test all Firmware in beam to do system level tests to make a plan Crates are filling up

Beam tests coordination: "In God we trust, everything else we test with beam“ With beam? Yes with beam! (parasitically of course ) Ted’s charge to me: “Come up with plans” BR: “Learn from the past” CDF RunIIa (our legacy at CDF): “Level 2 pager carrier” That is exactly as much as I can do for the present system, carry the pager (more or less) (my previous experiment): “Expert on call” Note the difference in attitude !

1 st attempt on a plan of three phases Time we spent in beam 100% Single board tests: Need access to debug connectors on the board Firmware completion: L1, PreFred, Cluster Algo now Aug ??th “Online” Monitoring Monitoring massaging High stat System level tests, Firmware massaging (performance) Fill up the crate: System level tests Single board high statstic Firmware massaging (make it work) Monitoring Completion Hardware/Firmware End of June 4 th July End of July PC PC receives beam data (incomplete event) PC returns something Pulsar Level2 triggers on Cosmics What will we be able to do in beam?

I know all this is common knowledge, but worth spelling it out Motivation: “I want to be an expert” “I want to know more than just my system” Education: Teaching = share knowledge Learning = spent time on the system try things out Training = do it all over again Communication (means of communication): group: informal meeting (Tue), bi-weekly meeting (Fr), point-to-point: list of phone numbers, cell phones are superior to pagers Documentation: e-log entries HowTo pages for useful tools and trouble shooting Informal & CDF notes Celebration: have fun