ALMA Integrated Computing Team Coordination & Planning Meeting #2 Santiago, 28-29 January 2014 Control Group Planning Rafael Hiriart, Control Group Lead.

Slides:



Advertisements
Similar presentations
General Activities Stuartt Corder April 9, 20141ASAC telecon.
Advertisements

Software Delivery. Software Delivery Management  Managing Requirements and Changes  Managing Resources  Managing Configuration  Managing Defects 
Bill SahrEVLA M&C Transition System Software CDR December 5-6, EVLA Monitor & Control Transition System Software Overview.
U-Mail System Design Specification Joseph Woo, Chris Hacking, Alex Benson, Elliott Conant, Alex Meng, Michael Ratanapintha April 28,
CSCI ClearQuest 1 Rational ClearQuest Michel Izygon - Jim Helm.
1 Software Testing (Part-II) Lecture Software Testing Software Testing is the process of finding the bugs in a software. It helps in Verifying and.
University of Palestine software engineering department Testing of Software Systems Fundamentals of testing instructor: Tasneem Darwish.
Software Development *Life-Cycle Phases* Compiled by: Dharya Dharya Daisy Daisy
Module CC3002 Post Implementation Issues Lecture for Week 6 AY 2013 Spring.
LSST Scheduler status Francisco Delgado Sr. Software Engineer Telescope & Site.
ALMA Integrated Computing Team Coordination & Planning Meeting #3 Socorro, June 2014 Control Group Planning Rafael Hiriart.
Understand Application Lifecycle Management
Nightly Releases and Testing Alexander Undrus Atlas SW week, May
50mm Telescope ACS Course Garching, 15 th to 19 th January 2007 January 2007Garching.
1 Software Development Configuration management. \ 2 Software Configuration  Items that comprise all information produced as part of the software development.
McMullinEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Data Post-processing: SSG (AIPS++/CASA) Development J. McMullin.
ALMA Integrated Computing Team Coordination & Planning Meeting #2 Santiago, January 2014 ASDM relational database Rafael Hiriart / Jorge Avarias.
A Scheduling Algorithm with Dynamic Priorities Status Presentation Matias Mora Klein UTFSM Computer Systems Research.
Cycle-3 Capabilities and the OT Andy Biggs ALMA Regional Centre, ESO.
TelCal Phasing Engine description Draft Robert Lucas
The ALMA Software and Release Management Ruben Soto Software Operations Group & Release Manager Joint ALMA Observatory.
ALMA Integrated Computing Team Coordination & Planning Meeting #4 Santiago, November 2014 Reporting Software Principles M Chavan, ESO R Soto, ALMA.
ALMA Integrated Computing Team Coordination & Planning Meeting #1 Santiago, April 2013 Relational APDM & Relational ASDM models effort done in online.
The ALMA TelCal subsystem Dominique Broguière, Institut de RadioAstronomie Millimétrique (IRAM) TelCal Phasing meeting – Grenoble -10/12/2012.
ALMA Integrated Computing Team Coordination & Planning Meeting #1 Santiago, April 2013 ICT Group Planning: Control Rafael Hiriart ICT Control Group.
JVLA capabilities to be offered for semester 2013A Claire Chandler.
PI Data Archive Server COM Points Richard Beeson.
ALMA Integrated Computing Team Coordination & Planning Meeting #1 Santiago, April 2013 ACA plan Manabu Watanabe National Astronomical Observatory.
Software Status Sonja Vrcic Socorro,
Introduction to Software Development. Systems Life Cycle Analysis  Collect and examine data  Analyze current system and data flow Design  Plan your.
ALMA Integrated Computing Team Coordination & Planning Meeting #4 Santiago, November 2014 Telescope Calibration Planning Dominique Broguière.
LSST Scheduler construction plan Francisco Delgado Sr. Software Engineer Telescope & Site.
ICALEPCS’ GenevaACS in ALMA1 Allen Farris National Radio Astronomy Observatory Lead, ALMA Control System.
Software Phase V Testing and Improvements to Test Procedures S. Corder and L.-A. Nyman April 18, 20131ICT Planning Meeting, Santiago.
Observing Modes from a Software viewpoint Robert Lucas and Philippe Salomé (SSR)
ALMA Integrated Computing Team Coordination & Planning Meeting #1 Santiago, April 2013 Telescope Calibration Planning Dominique Broguiere.
ALMA Integrated Computing Team ICT Coordination and Planning Meeting #2 Santiago January 2014 Alarm system A.Caproni.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Data Processing Progress.
EPICS EPICS Limitations Bob Dalesio Marty Kraimer.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
ES Slowdown, Optimization, Testing. Plan for shutdown: Timeline April: Focus on resolution of major outstanding issues: – Bulk data deployment  stable.
Jan 28, 2005Elizabeth_Gallas D0_Trigger_Database 1 D0 Trigger Database Status Elizabeth Gallas Fermilab CD/D0CA Margherita Vittone, Vijay Murthi, and Steve.
Program Development Cycle
Configuration Mapper Sonja Vrcic Socorro,
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
ALMA Integrated Computing Team Coordination & Planning Meeting #1 Santiago, April 2013 ICT Group planning: Scheduling Jorge Avarias ICT Scheduling.
Correlator GUI Sonja Vrcic Socorro, April 3, 2006.
Intelligence and Information Systems 1 3/17/2004 © 2004 Raytheon Company USC/CSE Executive Workshop on Agile Experiences March 17, 2004 A Raytheon Agile.
Pavel Nevski DDM Workshop BNL, September 27, 2006 JOB DEFINITION as a part of Production.
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing End-to-end (E2e) software.
ALMA Integrated Computing Team Coordination & Planning Meeting #3 Socorro, June 2014 Online system tools and Control's scope expansion Rafael Hiriart.
Software Requirements for the Testing of Prototype Correlator Sonja Vrcic Socorro, December 11, 2007.
Master Correlator Control Computer (MCCC) Requirements & Status Sonja Vrcic Socorro, December 12, 2007.
Simulation Production System Science Advisory Committee Meeting UW-Madison March 1 st -2 nd 2007 Juan Carlos Díaz Vélez.
Parasoft : Improving Productivity in IT Organizations David McCaw.
Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array ALMA Correlator.
Online Software November 10, 2009 Infrastructure Overview Luciano Orsini, Roland Moser Invited Talk at SuperB ETD-Online Status Review.
ALMA Integrated Computing Team Coordination & Planning Meeting #3 Socorro, June 2014 Observation with ACA correlator for Cycle3 Manabu Watanabe NAOJ.
Simulink Interface Layer (SIL)
Software Overview Sonja Vrcic
ALMA Software Scheduling subsystem Planning for cycle5 onwards
Tracker Upgrade Simulations Software Harry Cheung (Fermilab)
Computing Architecture
Simulation Requirements
IEEE Std 1074: Standard for Software Lifecycle
DBA Coordination Group Update José Parra
DSO Prototype Software
Gustaaf van Moorsel September 9, 2003
Quality Assurance in an Agile Development Team Michelle Wu 2018 PNSQC
Mark McKinnon EVLA Project Manager
Presentation transcript:

ALMA Integrated Computing Team Coordination & Planning Meeting #2 Santiago, January 2014 Control Group Planning Rafael Hiriart, Control Group Lead

Status since ICT-CPM1(Apr 2013) 2 open positions filled (Rachel & Patrick), one remaining open. CONTROL/OBOPS position now under NRAO's Web App Group. Alexis hired by NRAO SW test group. 3 releases delivered (10.2, 10.4, 10.6), which included Correlator support for more than 16 calibrations. TMCDB versioning improvements (CLI interface to retrieve history). Address DataCapturer memory issues with Pointing table. Fast scanning (delivered with Ralph's mission to the OSF). Full correlator data rates (Rodrigo's mission to the OSF). DataCapturer relational database. First version of the phasing loop (Matias' mission to the OSF). New Quicklook GUI. ASDM Ephemeris table.

Cumulative New Features

Cumulative Bugs

Status (2), about testing New NRAO testing group was formed, covering ALMA and CASA testing (i.e., this group will cover both ALMA data production and validation). Socorro and Charlottesville STEs now have same configuration than OSF. They are also synchronizing with the same build. Problems can be more easily reproduced. Simulation improvements allow us to test more, more easily. Simulation tests running daily in Socorro. We are working with IRM on the automatization of tests, and the inclusion of CSV test SBs and scripts. This should help freeing ADC resouces, which can then help us on getting more bugs fixed.

Risks & Issues Since April 2013, 237 bug tickets have been submitted, we have resolved 105 and 20 are in progress. Delta = 112. More tickets have been submitted that we have been able to handle. What to do about it? We haven't reached a stable point in the project lifecycle. Rate of tickets should decrease at some point. New hires (Patrick & Rachel) are coming up to speed. When APP ramps down, Matias can also help. Implement code reviews with ADC. Improve their knowledge of some areas of the Control SW.

Risks & Issues (2) Avoid introducing more bugs with new features. Implement internal code reviews. A second pair of eyes will be reviewing software modifications, and policing documentation and code test coverage. This will also help on decreasing risk on areas where only one developer have been involved. It will also help getting our new hires up to speed. With CSV reducing its activities (2 week ES, 1 CSV block), the project is reaching a point where stability is becoming more important than pushing new capabilities.

Risks & Issues (3) Emphasis will be on getting longer baselines working. We may need to improve algorithms used for WVR correction. We may discover hitherto hidden timing problems. BL correlator subarrays is a big capability! The End of Commissioning worry us some. We do have good communication/relationships with CSV. We should maintain this in full operations. ADC doesn't have resouces for new FrontEnd developments. We need to take over these modules.

Pending Features & Tentative Schedule See JIRA filter It shows 31 candidate features for

Antenna, LO & Timing HW Release 10.8 ICT-959, “Develop the software to implement fast scanning”. ICT-1797, “Implement focus Z axis correction term using temperatures from antenna metrology sensors”. ICT-899, “Implement storage of proper WVR parameters in ASDM”. ICT-1867, “Add sequencing to the total-power processor”. ICT-1019, “Array band management”. Release ICT-719, “Improve error handling in Control's observing mode layer”. ICT-2288, “Implement flagging for antenna shadowing”. ICT-693, “LS and WCA failure reports”. ICT-136, “Operational State confidence”.

Antenna, LO & Timing HW (2) Release and (2nd semester 2014) ICT-52, “Support for Observations of Fixed Calibration Source”. ICT-54, “Scan sequences II”. ICT-2285, “Review SOS scripts”. For 2015 ICT-2287, “Integrate Nutator Device with the Observing Modes”. ICT-2282, “Sideband Separation for Single-dish Data”.

HW monitor/control points and alarms Release 10.8 Release Release and (2nd semester 2014) ICT-2281, “Monitoring and alarm improvements”. Not yet accepted ICT-1445, “Request to add monitor points and alarms from the power system to the on-line system”.

HW configuration database Release 10.8 Release ICT-2286, “Refactor tmcdb-explorer”. Release and (2 nd semester 2014)

Other Tasks Release 10.8 XXX, “Estimate effort to port Control/Correlator to RedHat 6 in 64 bits”. APP features. Release ICT-2290, “Integrate CASA in the Control subsystem”. APP features. Release and (2 nd semester 2014) ICT-2289, “Port Control/Correlator software to RedHat 6 in 64 bits”.

DataCapturer & QuickLook Release 10.8 Release Release and (2 nd semester 2014)

BL Correlator Release 10.8 ICT-273, “Concurrent sub-arrays – preconditions”. ICT-2284, “DC bias and archive data scaling in TDM”. Release ICT-1764, “Concurrent sub-arrays – completion”. ICT-1683, “Quantization correction for 3 bit sampler in FDM”. Release and (2 nd semester 2014) ICT-153, “LO offsetting (sideband separation)”. Pending modes (ICT-152, ICT-155, ICT-156, ).