Water Resources Advisory Commission January 5, 2006.

Slides:



Advertisements
Similar presentations
creating a sustainable world The Chesapeake Bay TMDL A Policy Model for Nutrient Pollution Reductions James Noonan October.
Advertisements

Rivanna Water & Sewer Authority Community Water Supply Plan Update Public Meeting Monticello High School September 21, :00 pm.
What are TMDLs? and What Might They Mean to MS4 Permittees?
To response to litigation, thirty Minnesota Cities were directed to perform antidegradation reviews or Loading Assessments for two time periods: (1) (1)
O Adopted in 1972, the CWA is known mostly to the public by its mandate for “swimmable and fishable” waterways. o With the CWA, states evaluate all of.
Agricultural and Biological Engineering SWFREC, UF/IFAS Immokalee.
Flood the Sugar Cane Farms Now to Save the Estuaries: Is This Feasible ? Water Resources Advisory Commission January 5, 2006 Meeting.
The Central and Southern Florida Project Conceived by Florida Built by the Corps Integrates a Large Dynamic Economy and Multiple Valuable Ecosystems How.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Paradise Preserved: Springs Protection In Wakulla County.
Santa Ana Region Stormwater Permit TMDL Requirements and Costs
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
Florida Water Forum Everglades Restoration June 3, 2011.
The South Florida Watershed
Lee County Government Division of Natural Resources TMDL/BMAP Update TMDL/BMAP Update November 30, 2010 Roland Ottolini, Director Lee County Division of.
Shell and Prairie Creek Watershed Management Plan – Reasonable Assurance Documentation And Agricultural Reservoirs Southwest Florida Water Management District.
Expedited Projects + Innovative Teamwork = Measurable Improvements to the Health of Lake Okeechobee and the St. Lucie and Caloosahatchee Estuaries.
Introduction to TMDLs for Nutrients Presented by: Dr. Scott Emery January 15, 2009.
Naples Bay Surface Water Improvement and Management (SWIM) Plan
Presented by Ralf Topper, CPG 30 th Colorado Water Workshop July 28, 2005.
Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator
Lake Okeechobee Regulation Schedule Study Lieutenant Colonel Andrew Goetz U.S. Army Corps of Engineers Jacksonville District Lieutenant Colonel Andrew.
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
SKAGIT COUNTY SHORELINE REGULATIONS Planning Commission Workshop April 3, 2012.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
Steve Harrison, Environmental Manager Bureau of Entomology and Pest Control -Mosquito Control Section.
May 5, 2015 Water Resources Meeting Heather Gutherless Jefferson County Planning & Zoning
The South Florida Region and its Water Management System Linda Lindstrom, P.G. Director Environmental Resource Assessment Department South Florida Water.
Robert Beltran, P.E., BCEE Assistant Executive Director.
Pelican Group of Lakes Improvement District Public Hearing on Facilities Plan Agenda Introduction of PGOLID Board of DirectorsDale Haakenstad Introduction.
Orange Creek Basin Management Action Plan Alachua County Commission December 11, 2007 Fred Calder, FL DEP (850)
River of Grass Phase I Planning Water Resources Advisory Commission Issues Workshop February 3, 2009.
WRAC Issues Workshop EAA/STA-2 Expansion Cell 4 April 11, 2005 Acceler8 Overview.
Water Resources Advisory Commission Lake Okeechobee Committee January 25, 2006 Susan Gray, Ph.D.
Florida’s Unified Stormwater Rule Status Lake Okeechobee WRAC November 2007 FDEP, Chad Kennedy Presenting for Eric Livingston and Michael Bateman.
Regulatory Developments Affecting Southwest Washington Land Use in Southwestern Washington Law Seminars International Vancouver, WA February 11, 2008 Bill.
Orange County Board of County Commissioners Update on USEPA Rulemaking for Numeric Nutrient Criteria Utilities Department January 26, 2010 Utilities Department.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Wisconsin’s Nutrient Reduction Strategy for Water Quality Wisconsin Crop Management Conference January 16, 2014 Ken Genskow, PhD Associate Professor, Department.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Basin Specific Feasibility Studies Everglades Stormwater Program Basins Preliminary Findings Contract C-E024 HSA Engineers & Scientists DB Environmental.
Lee County Water Resource Initiative: Community Sustainability Committee June 16, 2010 Kurt Harclerode Operations Manager Lee County Natural Resources.
WRAC Acme Basin B Discharge Project February 2, 2006.
Governing Board Meeting January 11, 2006 Susan Gray, Ph.D.
Central & Southern Florida Project George Horne Deputy Executive Director Operations & Maintenance Resource Area.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Chapter 10 Local, Regional, State, and Multistate Water Management Agencies.
Revisions to the Long-Term Plan for Achieving Everglades Water Quality Goals November 18, 2004 Gary Goforth Chief Consulting Engineer South Florida Water.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
The Lake Okeechobee Protection Plan Evaluation Update, 2007 The Lake Okeechobee Protection Plan Evaluation Update February 8, 2007.
AN INTRODUCTION TO STORMWATER AND STORMWATER MANAGEMENT Eric H. Livingston Bureau of Watershed Management Florida Dept. of Env. Protection Tallahassee,
Lake Okeechobee Regulation Schedule
76. The central U.S. law regulating water quality is the Clean Water Act (CWA), adopted in The Act initially focused on point sources, which it.
SB 536 Study and Report WateReuse Florida November 9, 2015 Janet G. Llewellyn Office of Water Policy Florida Department of Environmental Protection.
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
Maryland’s Nutrient Trading Program How Trading Works John Rhoderick Maryland Department of Agriculture.
Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.
Susan Sylvester Department Director Operations Control Department Mechanics of the Primary Water Management System.
Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.
Dan Pennington Florida Department of Economic Opportunity Division of Community Development.
Nutrients and the Next Generation of Conservation Presented by: Tom Porta, P.E. Deputy Administrator Nevada Division of Environmental Protection President,
Beth Kacvinsky - Lead Project Manager Office of Everglades Policy and Coordination March 1, 2016 IRL-S / C-44 Overview.
Williamsburg’s Local Strategies to meet the ChesBay TMDL March 2012 Chesapeake Bay Watershed Virginia Maryland Pennsylvania New York Delaware West Virginia.
City Council March 4, Introduction The UCRA recommends the development of a storm water storage basin just to the east of FM 1223, south of Avenue.
THE CORPS REGULATORY AUTHORITY
Building a Phase III WIP for Wastewater, Stormwater & Septic Systems
May 12, 2016 Study of the State’s Riparian Buffer Protection Program Pursuant to SL Karen Higgins, Division of Water Resources.
Water Quality Improvement Projects and Engineering Planning Grant
May 11, 2016 Study of the State’s Riparian Buffer Protection Program Pursuant to SL Karen Higgins, Division of Water Resources.
Florida Water Forum Springs and Estuaries Drew Bartlett
Presentation transcript:

Water Resources Advisory Commission January 5, 2006

2 Lake Okeechobee and Estuary Recovery  A combination of capital projects and numerous interagency initiatives  Designed to provide measurable and meaningful improvements to water quality and water quantity in Lake Okeechobee and the St. Lucie and Caloosahatchee Estuaries

3 LOER Components and District Lead Responsibilities  Lake Okeechobee Fast Track Projects  Revise Lake Okeechobee Operating Schedule (will require significant District support)  Set TMDLs for tributaries  Mandatory fertilizer BMPs  Revise ERP  Alternative storage/disposal of excess surface water  Innovative land use planning  Eliminate land application of wastewater treatment residuals  Lake Okeechobee Protection Program  CERP Lake Okeechobee Watershed Project

4 Lake Okeechobee Fast-Track Projects 5 construction projects north of Lake Okeechobee: Nubbin Slough STA Expansion Taylor Creek Reservoir Lakeside Ranch STA Rerouting Runoff from the S-133 Basin Rerouting Runoff from the S-154 Basin 5 construction projects north of Lake Okeechobee: Nubbin Slough STA Expansion Taylor Creek Reservoir Lakeside Ranch STA Rerouting Runoff from the S-133 Basin Rerouting Runoff from the S-154 Basin

5 Lake Okeechobee Fast-Track Projects  Constructed wetland for treating basin runoff before it enters the lake  Approximately 1,300 acres in size  Removes about 22 to 24 metric tons of phosphorus/year Nubbin Slough STA Expansion Wetland restoration area Wetland restoration area Wetland Inflow structure

6 Lake Okeechobee Fast-Track Projects  Storage for holding water before treatment in an STA  4,000-acre footprint, holding 32,000 acre-feet of water  Also removes about 3 to 5 metric tons of phosphorus/ year Taylor Creek Reservoir

7 Lake Okeechobee Fast-Track Projects  Constructed wetland for treating basin runoff before it enters the lake  Approximately 2,700 acres in size  Removes about 39 to 48 metric tons of phosphorus/year Lakeside Ranch STA

8 Lake Okeechobee Fast-Track Projects  Canals and pumps to divert stormwater runoff into an STA for treatment  Rerouting runoff from the City of Okeechobee  Additional connection moves only treated water into Lake Okeechobee Rerouting Runoff from the S-133 Basin

9 Lake Okeechobee Fast-Track Projects  Canals and pumps to divert stormwater runoff into an STA for treatment  Keeps untreated water from entering the southern end of the Kissimmee River (C-38 canal) Rerouting Runoff from the S-154 Basin

10 Lake Okeechobee Fast Track Projects  Point of Contact:Harold Aiken/Mark Long/Denise Arrieta  Steps to implementation/Schedule:  Initial design and data collectionNov ‘05 – Mar ’06 (Conceptual design being conducted by CDM)  Develop Basis of Design ReportApr ‘06 – Oct ‘06  Obtain Design Criteria Approval Nov ‘06  Obtain PermitsOct ‘06 – Sept ‘07  Nubbin Slough expansion permitsJan ‘06 – Aug ‘06  Nubbin Slough constructionSep ‘06 – Dec ‘07  Construct remaining Fast TrackOct ‘07 – Dec ‘09 projects

11 Permanent Forward Pumps for Water Supply during Droughts  Point of Contact:Larry Carter/Karen Counes  Steps to implementation/Schedule:  Develop Basis of Design ReportJan ’06 – Aug ’06 (SOW, preliminary operating criteria under development)  Obtain Design Criteria Approval Sept ‘06  Design Pumps/StructuresOct ’06 – Sept ‘07  Obtain PermitsOct ’06 – Sept ‘07  Construct Pumps/StructuresOct ’07 – Sept ’09

12 Revise Lake Okeechobee Regulation Schedule Revise the Lake Okeechobee Regulation Schedule  Work with U.S. Army Corps of Engineers to revise federal regulation schedule levels  Achieve a better balance among lake management objectives

13 Revise Lake Okeechobee Operating Schedule  Point of Contact:Kim O’Dell  Steps to implementation/Schedule:  SSM & water shortage modeling Oct ’05 – Aug ‘06  Re-map lake sedimentsApr ’06 – Apr ‘07  Review in-lake dredging optionsJun ’06 – May ‘07  Ecological/hydrological modelingOct ’05 – Sept ‘07  Purchase temporary pumpsFeb ’06 – Aug ’06  Electrical, installation platforms forAug ’06 – Jan ‘07 temporary pumps  Seed bank evaluationOct ’06 – Jan ‘07  Replant estuary SAV2008

14 Revise ERP Criteria  Revise the Environmental Resource Permit (ERP) criteria to better address the water quality impacts due to new development and land- use changes within the Kissimmee, Lake Okeechobee, Caloosahatchee Estuary and St. Lucie Estuary watersheds Supplement the Environmental Resource Permit (ERP) Criteria

15 Revise ERP Criteria  Point of Contact:Damon Meiers  Steps to implementation/Schedule:  Revise Lake O Protection ActJan ’06 - July ’07  Develop guidelines to determineJan ’06 – Dec ’07 P loading and BMP credits  ERP rule revisionsFeb ’06 – May ’08  Coordination with State-wide ERPFeb ’06 – Dec ‘06 review

16 Alternative Storage/Disposal of Excess Surface Water  Identify alternative sites on public, private, and tribal lands for moving and storing excess water from the lake and its tributary basins to help reduce high discharge volumes to the estuaries  Assess feasibility of deep well disposal and ASR options for Taylor Creek and the Brighton Reservation Options for Storage and/or Disposal of Excess Surface Water

17 Water Storage Assessments: Study Areas Figure 2

18  Point of Contact:  Benita Whalen, P.E.  Steps to implementation, schedule:  Active communication with agricultural ongoing land owners on storage opportunities  Complete public lands assessmentsDec ‘05  Complete private & tribal lands assessmentsMar ‘06  Complete construction of 4 pilot facilitiesApr ‘06  Enter into agreements on additional sitesDec ‘06  Design, construct, monitorJan ’07 – Dec ‘09 Alternative Storage/Disposal of Excess Surface Water

19  Point of Contact:  Scott Burns / Robert Verrastro  Steps to implementation, schedule:  Assess feasibility of reactivating TaylorJan ’06 – Jun ‘07 Creek ASR well  Conduct pilot ASR for Brighton ReservationJan ’06 – Apr ‘08  Design and permitting of 10 deep wellsJan ’06 – Jan ‘07  Construct and operate 10 deep wellsFeb ’07 – Dec ‘09 Alternative Storage/Disposal – Deep Well Injection and ASR

20 Continued Implementation of the LOPP & CERP LOWP  Comprehensive, phased approach already under way to reduce phosphorus loadings and provide water storage to the lake by 2015 Continued Implementation of the Lake Okeechobee Protection Program and CERP Lake Okeechobee Watershed Project

21  Point of Contact:  Susan Gray / David Unsell  Steps to implementation, schedule:  Ongoing water quality projects, lake2004 – 2015 and watershed assessments for LOPP  Flow ways feasibility studyJun ’06 – Sep ‘07  LOWP CERP PIR completionJan ’06 – 2008  LOWP CERP land acquisitionJun ’07 – 2012  LOWP CERP design and permitting  LOWP CERP Construction Continued Implementation of LOPP and CERP LOWP

22 Set TMDLs for Lake Okeechobee Tributaries - FDEP  Speed up development of total maximum daily loads of phosphorus allowed for the Lake Okeechobee watershed tributaries to protect and restore downstream water bodies TMDLs = Total Maximum Daily Loads

23 Mandatory Fertilizer BMPs – FDACS and local governments  Revised application rates for agriculture; low phosphorus for urban use  Reassess fertilizer application rates for agriculture and encourage the development and use of low phosphorus fertilizer in urban settings Mandatory Fertilizer Best Management Practices (BMPs):

24 Innovative Land-Use Planning - FDCA  Innovative land-use planning techniques, including use of Florida’s Rural Land Stewardship Areas Program, to facilitate the acquisition of lands for public works Growth Management to Encourage Innovative Land-Use Planning

25 Eliminate Land Applications of Residuals - FDEP  End the practice of depositing domestic wastewater residuals on land, which can result in excess nutrients getting in tributaries and estuaries Residuals Contain Nutrients that are Imported into Phosphorus-Sensitive Basins

26 Opportunities for Local Government Participation  Implement stormwater utilities and stormwater retrofits  Assist with BMP implementation for low P fertilizer in urban settings  Move forward to convert septic systems to central sewers  Land acquisition for preservation & Restoration