19 February 2015 1 Summary: Updating on the activities completed (Done) since the last meeting List activities on going (Next steps) and related Actions.

Slides:



Advertisements
Similar presentations
General Infrastructures Services Department LIU-SPS external beam dump - Internal Review Civil Engineering Aspect for Option B (LSS4) 30/7/2014 Martin.
Advertisements

Cairo Metro Line3 / Medinah Car Park II
L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013.
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
Plasma Wakefield (AWAKE) Project Meeting 18 October 2012 Civil Engineering Feasibility Issues for the West Area EDMS : John Osborne GS-SE.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Remote Handling Solutions for Inspecting CERN’s General Infrastructure 6/9/2015 Richard F. Morton2.
ASSALAMUALAIKUM & GOOD MORNING
Chapter 18 Foundations.
John Osborne GS/SE March 2013
Potential Underground Wiring Meeting with Residents Wednesday, September 15, 2010 lionsbay.ca Lower Lions Bay Water Line Replacement The Village of Lions.
IEFC Workshop 2011 David Mcfarlane Superintendent for SPS EN/MEF/ABA 1.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Latest Advancements in Instrumentation, Monitoring and QA/QC Techniques for Deep Excavation Support Systems: Al Hilal Project, Abu Dhabi – A Case History.
CAISSON FOUNDATION.
Preparing Foundations for Cylinders & ASME Tanks
1. 2 Civil Engineering Practice Introduction Instructor: Dr. Attaullah Shah Lecture # 1 Department of Civil Engineering Swedish College of Engineering.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Specification & Quantities Estimating Lecturer Maha Muhaisen College of Applied Engineering& Urban Planning.
By: Rick Ayers Yates County Soil & Water Conservation District
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
09 July EHN1 civil engineering project status (JUNE) Summary: Updating of the activities carried out on-site (Done) in JUNE List activities on going.
06 August EHN1 civil engineering project status (JULY) Summary: Updating of the activities carried out on-site (Done) in JULY List activities on.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
Status of Radiation Protection studies in support of ELENA R. Froeschl and J. Vollaire DGS-RP-AS.
1st LTEX 22 June 2009D.LACARRERE1 Protection of UX85 EDMS No IP8 Current Status & Plans  UX85 Expt Area  RB84 (8-7 sector)  RB86 (8-1 sector)
LONG TERM GEODETIC MONITORING OF THE DEFORMATION OF A LIQUID STORAGE TANK FOUNDED ON PILES P. Savvaidis Laboratory of Geodesy Dept. of Civil Engineering.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Geodetic Monitoring of the Deformation of a 50,000 t Sugar Storage Tank Founded on 124 Long Bored Piles P. Savvaidis and I. Ifadis Laboratory of Geodesy.
Technical Specifications for Monitoring Ground Displacements at a National Highway Project K. Lakakis, P. Savvaidis and I. Ifadis Laboratory of Geodesy.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Joints for Diaphragm Walls
22 October Summary: Updating of the activities carried out on-site (Done) in SEPTEMBER List activities on going (Next steps) and scheduled for OCTOBER.
15 January Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi EHN1 civil engineering project status Summary: Updating.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
General Infrastructures Services Department Civil Engineering planning for LSS4 Option, presented at review workshop 30/7/ months Planning and Resources:
Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting.
Survey Meeting John Osborne, CERN 8 February 2016
CENF CIVIL ENGINEERING UPDATE : - SITE INVESTIGATION - CALL FOR TENDER FOR DESIGN & CONTRACT ADMINISTRATION SERVICES - 3D VISUALS FOR SURFACE STRUCTURES.
CENF CIVIL ENGINEERING UPDATE : - SITE INVESTIGATION - CALL FOR TENDER FOR DESIGN & CONTRACT ADMINISTRATION SERVICES John Osborne GS/SE 16 May 2013.
19 February Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi EHN1 civil engineering project status Summary: Updating.
Town of East Greenbush Waste Water Treatment Plant Project Monthly Update – September 2014.
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
WP 17.1 Civil Engineering Platform height / vs option Status on M. Manfredi on behalf of WP17.1 team.
CAISSON FOUNDATION.
DIAPHRAGM WALLS.
Gasunie is one of the biggest gas infrastructure companies in Europe. Within the company, we give safety the highest priority; it forms the basis of our.
Pieter Mattelaer (SMB-DI)
21 January Summary: Updating of the activities carried out on-site (Done) in DEC + ½JAN List activities on going (Next steps) and scheduled till.
10 December Summary: Updating of the activities carried out on-site (Done) in NOVEMBER List activities on going (Next steps) and scheduled for DECEMBER.
Deep Residential Basement, Chelsea. Toureen Plant Toureen Plant Toureen Contractors City Basements Groundworks RC Frames Groundworks RC Frames Petrol.
25 June EHN1 civil engineering project status (MAY) Summary: Updating of the activities carried out on-site (Done) in MAY List activities on going.
Mike Andrews August 17, Week 16 NuMI Activities Leak testing of DI bottles & Casks Complete all bottles & casks RAW Impulse line upgrade Finished.
Siting/Conventional Facilities Jonathan Hunt PIP-II Machine Advisory Committee 9 March 2015.
The Challenge of Urban Rail Infrastructure The Design of William Street Underground Station Barry Moore 23 rd November 2005 AusRAIL PLUS 2005.
Experimental Hall in Mountain Regions
Substructure Groundworks - Hazards
Detailed planning for fish farm construction Once the site has been selected, then initiation of planning begins. There are two main related components.
Safety Documentation EHN1
CE Status: Activities executed until 03/08 and ongoing
EHN1: CE Integration process updating
Special LS1 day on 12 June 2012, EDMS:
Detector hall in mountain regions
N.N.Som Consulting Geotechnical Engineer
Steps To Prepare Site For Site Work Construction Calhoun GA.
CR-GR-HSE-419 Safety of excavation works
Presentation transcript:

19 February Summary: Updating on the activities completed (Done) since the last meeting List activities on going (Next steps) and related Actions CENF – Civil Engineering Extension B887 Extension of Building th EHN1 Extension Integration Meeting N.Lopez – M.Manfredi

19 February (5 th week) Concrete blocks removal, cores for water and electrical connections inside EHN1 completion (4 th week) “Visite d’Inspection Commune” (VIC), for the earthworks and worksite installation, Permit to dig issued by CERN to the contractor. Earthworks contractor on site Done (1/4): Site work side CENF – Civil Engineering Extension B887 Extension of Building th EHN1 Extension Integration Meeting N.Lopez – M.Manfredi

19 February (5 th week) Ground surveys to determine its profile (top soil thick, water table depth..). Septic tank survey and site entrance area arrangement (5 th week) Existing networks research. Valve installation by SIG on the potable water network. Done (2/4): Site work side CENF – Civil Engineering Extension B887 Extension of Building th EHN1 Extension Integration Meeting N.Lopez – M.Manfredi

19 February (6 th week) All week snow. Site Activities stopped due to the weather conditions Done (3/4): Site work side (7 th week) Snow removal, start top soil excavation (about 50cm), platform for site barracks creation. CENF – Civil Engineering Extension B887 Extension of Building th EHN1 Extension Integration Meeting N.Lopez – M.Manfredi

19 February (7 th week) Existing drainage network research, concrete manhole installation, trench for service connection and top soil excavation completion (Transport toward storage area completed this week) Done (4/4): Site work side CENF – Civil Engineering Extension B887 Extension of Building th EHN1 Extension Integration Meeting N.Lopez – M.Manfredi

19 February Done (1/1): Design and study side (issued 05/02) Final comments on the execution docs (issued 05/02) sent by CERN to the consultant. Awaiting for the updated version before the EDMS uploading. (issued 12/02) RP issue, additional soil thickness needed above the tunnels. Structural evaluation due to the overload and reference plan with new requirements provided to the Contractor (issued 12/02) (completed 16/02) “Etat des lieux” on the existing facilities (i.e. EHN1, underground tunnels TT84- TT85-TDC85, Roads and Storage Area). (completed 16/02).. Weekly site meeting + Coordination and Neutrino General meeting CENF – Civil Engineering Extension B887 Extension of Building th EHN1 Extension Integration Meeting N.Lopez – M.Manfredi

Next Steps (on going and awaiting submission) Analyse Plan and Execution Method about the existing facilities instrumentation (i.e. topographic and cracks monitoring, vibration measure and inclinometers) and TG portion in front the TDC85 enlargement (on going and awaiting submission) (on going) Analyse Plan and Calculation Notes received for the Diaphragm Walls and Sheet Piles execution (on going) (foreseen 8 th  11 th week) (foreseen 8 th  11 th week) Topsoil excavation removal General Site installation and access road completion Mass earthworks until the DW level upper part Site installation for the Special works contractor (DW +SP) Guide walls construction for DW excavation purpose Start DW excavation (drilling west side) CENF – Civil Engineering Extension B February

Overloads on the horizontal elements (1/2): CENF – Civil Engineering Extension B887 Extension Pits, levels -7.35m; -9.00m 300 KN/m 2 Technical gallery, level -3.45m PIT A PIT B GHN m -3.45m 19 February KN/m 2 Extension of Building th EHN1 Extension Integration Meeting N.Lopez – M.Manfredi

CENF – Civil Engineering Extension B February Extension of Building th EHN1 Extension Integration Meeting N.Lopez – M.Manfredi Pannels for Diaphragm walls execution: Numerations in plan: Panel Type: N°47 must be modified for technical needs: (execution method, watertightness)