Lecture 2: Project Initiation Phase 1: Planning

Slides:



Advertisements
Similar presentations
John Wiley & Sons, Inc. © 2005 Prepared by Alice B. Sineath Forsyth Technical Community College Managerial Accounting Weygandt Kieso Kimmel CHAPTER 12.
Advertisements

Systems Analysis and Design
ACCOUNTING INFORMATION SYSTEMS
© Copyright 2011 John Wiley & Sons, Inc.
Chapter Fourteen Setting Priorities for Businesses and Brands – The Exit, Milk, and Consolidate Options Copyright © 2007 John Wiley & Sons, Inc. All rights.
Common Stock Valuation
Slide 1-1 Chapter 2 Principles of Accounting Analyzing Business Transactions.
PowerPoint Presentation for Dennis & Haley Wixom, Systems Analysis and Design, 2 nd Edition Copyright 2003 © John Wiley & Sons, Inc. All rights reserved.
13-1 Chapter 13 Motivating Performance Applying Innovation By David O’Sullivan and Lawrence Dooley © Sage Publications 2008.
Systems Analysis and Design
© Copyright 2011 John Wiley & Sons, Inc.
© Copyright 2011 John Wiley & Sons, Inc.
PowerPoint Presentation for Dennis, Wixom & Tegardem Systems Analysis and Design Copyright 2001 © John Wiley & Sons, Inc. All rights reserved. Slide 1.
Chapter 22 Part 2.
Systems Analysis and Design
MODERN AUDITING 7th Edition
© Copyright 2011 John Wiley & Sons, Inc.
Feasibility Analysis Chapter 3
Accounting Principles, 6e Weygandt, Kieso, & Kimmel
Information Technology Project Management
PowerPoint Presentation for Dennis & Haley Wixom, Systems Analysis and Design Copyright 2000 © John Wiley & Sons, Inc. All rights reserved. Slide 1 Systems.
Information Technology Project Management
PowerPoint Presentation for Dennis & Haley Wixom, Systems Analysis and Design Copyright 2000 © John Wiley & Sons, Inc. All rights reserved. Slide 1 Systems.
13-1 Information Technology Economics Information Technology: Economic and Financial Trends Internal IT versus outsourcing Expanding power / declining.
Project Identification and Selection
Systems Analysis and Design with UML Version 2
Options Chapter 19 Charles P. Jones, Investments: Analysis and Management, Eleventh Edition, John Wiley & Sons 17-1.
Systems Analysis and Design Fourth Edition
ACCOUNTING INFORMATION SYSTEMS
Chapter 31 The Value of Implementing Quality Chapter 3 Achieving Quality Through Continual Improvement Claude W. Burrill / Johannes Ledolter Published.
Statement of Cash Flows
Accounting Principles, Ninth Edition
John Wiley & Sons, Inc. © 2005 Chapter 18 Cost-Volume-Profit Relationships Prepared by Barbara Muller Arizona State University West Principles of Accounting.
Information Technology Project Management by Jack T. Marchewka Power Point Slides by Jack T. Marchewka, Northern Illinois University Copyright 2006 John.
PowerPoint Presentation for Dennis, Wixom, & Roth Systems Analysis and Design, 3rd Edition Copyright 2006 © John Wiley & Sons, Inc. All rights reserved.
PowerPoint Presentation for Dennis, Wixom, & Roth Systems Analysis and Design, 3rd Edition Copyright 2006 © John Wiley & Sons, Inc. All rights reserved.
System Analysis and Design Rabie A. Ramadan, PhD 2 30/3/2011.
PowerPoint Presentation for Dennis, Wixom, & Roth Systems Analysis and Design, 3rd Edition Copyright 2006 © John Wiley & Sons, Inc. All rights reserved.
I-1. I-2 Learning Objectives Describe the nature and purpose of a subsidiary ledger. 1 Record transactions in special journals. 2 Appendix I Subsidiary.
PowerPoint Presentation for Dennis, Wixom, & Tegarden Systems Analysis and Design with UML, 3rd Edition Copyright © 2009 John Wiley & Sons, Inc. All rights.
Copyright © 2000 John Wiley & Sons, Inc. All rights reserved
Chapter 18-1 C H A P T E R 18 REVENUE RECOGNITION Intermediate Accounting 13th Edition Kieso, Weygandt, and Warfield.
Information Technology Economics
Chapter 9: Introduction to Internal Control Systems
Chapter 1 Charles P. Jones, Investments: Analysis and Management, 12 th Edition, John Wiley & Sons 1- 1.
Slide 1 Systems Analysis and Design with UML Version 2.0 An Object-Oriented Approach, Second Edition Chapter 3: Project Initiation Alan Dennis, Barbara.
Slide 1 Systems Analysis and Design with UML Version 2.0 An Object-Oriented Approach, Second Edition Chapter 3: Project Initiation Alan Dennis, Barbara.
5. Planning Phase System Analysis And Design Program: BSCS II (Advent Semester – 2014) Lecturer: Rebecca Asiimwe
Systems Analysis and Design 5th Edition Chapter1: The Systems Analyst and Information Systems Development Prof. Salim Arfaoui 1-0© Copyright 2011 John.
H-1 Prepared by Coby Harmon University of California, Santa Barbara Westmont College.
Slide 1 Software Construction Software Construction Lecture 3.
Selecting Projects IT Project Management. Project Initiation: Strategic Planning First step in initiating projects: look at the big picture, organization’s.
Slide 1 Systems Analysis and Design with UML Version 2.0 Chapter 3: Project Initiation.
Slide 1 Systems Analysis and Design with UML Version 2.0 An Object-Oriented Approach, Second Edition Chapter 3: Project Initiation.
Systems Analysis and Design 5th Edition Chapter1: The Systems Analyst and Information Systems Development Roberta Roth, Alan Dennis, and Barbara Haley.
Systems Analysis and Design 5th Edition Chapter1: The Systems Analyst and Information Systems Development Roberta Roth, Alan Dennis, and Barbara Haley.
Prepared by Debby Bloom-Hill CMA, CFM
Prepared by Debby Bloom-Hill CMA, CFM
© Copyright 2011 John Wiley & Sons, Inc.
Information Technology Economics
Systems Analysis and Design
Project Initiation Chapter 2.
Chapter 1 - Introduction to Operations Management
Systems Analysis and Design
Information Technology Project Management
Systems Analysis and Design with UML Version 2
Information Technology Economics
Information Technology Project Management
PLANNING FOR CAPITAL INVESTMENTS
Presentation transcript:

Lecture 2: Project Initiation Phase 1: Planning Dr. Taysir Hassan Abdel Hamid

Outline The project sponsor is a key person who identifies business value to be gained from using information technology. The approval committee reviews system requests from groups throughout the organization and selects projects for the benefit of the business.

How do Projects Begin ? Business needs should drive projects. Project sponsor recognizes business need for new system and desires to see it implemented. Business needs determine the system’s functionality (what it will do). The project’s business value should be clear.

System Request A document describing business reasons for project and system’s expected value. Lists project’s key elements Project sponsor – the person who has an interest in seeing the system succeed, usually the person who initiated the project. Business need – why the information system should be built. Business requirements – what the information system will do. Business value – the expected value from the system Special issues or constraints – Any circumstances affecting the project

System Request Template Project Name: Project Sponsor: Name: Department: Organization: Phone: E-mail: Business Need: Functionality: Expected Value: Tangible: Intangible: Special Issues or Constraints:

Example A Multimedia company, located in Assiut (AssuitMult). Annual sales last year was 200,000 L.E. and they are growing every year by a 3% to 5% for the past few years. Background: Eng. Osama Omar, vice president of marketing, has recently become both excited and concerned with the rise of Internet sites selling CDs. The Internet has the potential to enable AssiutMult to reach beyond its regional focus and increase sales internationally.

Example (Cont.) AssuitMult currently has a simple web page that provides information about the company and about its stores that has opened. System Request: At AssiutMult, new IS projects are reviewed and approved by IS steering committee that meets monthly.

System Request Examples Project sponsor – VP of Marketing Business need – Reach new customers and improve service to existing customers Business requirements – Provide web-based shopping capability Business value – 400,000 in new customer sales; 300,000 in existing customer sales Special issues or constraints – System must be operational by holiday shopping season

System Request Example (how to fill in the template) Project Name: Internet Sales Project Sponsor: Vice President of Marketing Name: Osama Omar Department: Marketing Phone: 555-3243 E-mail: omar@yahoo.com Business Need: To increase sales by reaching a new market: Internet customers Functionality: Receive immediate credit approval Search through a product Place an order on one or more products Expected Value: Tangible: 300,000 L.E. increase in annual sales Intangible: Improved customer satisfaction Improved recognition of AssiutMult brand name Special Issues or Constraints: The system must be in place within the next 3 months

Preliminary Project Acceptance System request is reviewed by approval committee Based on information provided, project merits are assessed. Worthy projects are accepted and undergo additional investigation – the feasibility analysis.

Your Turn If you were building a web-based system for course registration, What is the business need? What would be the business requirements? What would be the business value (tangible and intangible)? What special issues or constraints would you foresee?

FEASIBILITY ANALYSIS

Feasibility Analysis Detailed business case for the project: a. Technical feasibility b. Economic feasibility c. Organizational feasibility Compiled into a feasibility study Feasibility is reassessed throughout the project

a. Technical Feasibility: Can We Build It? Users’ and analysts’ familiarity with the business application area Familiarity with technology Have we used it before? How new is it? Project size Number of people, time, and features Compatibility with existing systems

b. Economic Feasibility Should We Build It? Identify costs and benefits Assign values to costs and benefits Determine cash flow Assess financial viability (Fig. 1-8) Return on investment (ROI) Break even point (BEP) Present Value (PV) Net present value (NPV)

Assess Financial Viability – Net Present Value NPV =  PV(future cash inflows) –  PV(future cash outflows) PV = Cash flow amount (1 + interest rate)n , where interest rate = required return n = number of years in future

Definitions Net Present Value - is defined as the difference between the present value project benefit and the value of the present value of the project cost. NPV = PV Benefits – PV Costs Return on Investment (ROI) - A measure of a corporation's profitability ROI = (Total benefits – total costs)/ (Total costs)

Tangible vs. Intangible Costs Tangible Costs – Includes revenue that the system enables the organization to collect, such as increased sales. Intangible Costs – Are based on intuition and belief rather than “hard numbers.”

Definitions (Cont.) Break-even point analysis - The break-even point technique is used in the analysis of the profit The purpose of the break-even point analysis is to find out the level of sales (Quantity) or the selling price per unit at which the project will break even If the projected sales volume or selling price is higher than the BEP then the project is expected to gain.

Assign Cost and Benefit Values Difficult, but essential to estimate Work with people who are most familiar with the area to develop estimates Intangibles should also be quantified If intangibles cannot be quantified, list and include as part of supporting material

Determine Cash Flow: Assign Values to Costs and Benefits – Simple Cash Flow Method

Determine NPV If NPV >= 0, Project is OK If NPV < 0, Project is unacceptable

ROI Example ROI

BPE BPE = (Yearly Net Cash Flow – Cumulative Net Cash Flow)

BPE Example BPE

Assess Financial Viability – Break Even Point How long before the project’s returns match the amount invested The longer it takes to break even, the higher the project’s risk.

Summary of Economic Feasibility

c. Organizational Feasibility If we build it, will they come? 1. Strategic alignment How well do the project goals align with business objectives? 2. Stakeholder analysis Project champion(s) Organizational management System users

1. Strategic Alignment is the fit between the project and business strategy— The greater the alignment, the less risky the project will be, from an organizational feasibility perspective. For example, if the marketing department has decided to become more customer focused, then a CRM project that produces integrated customer information would have strong strategic alignment with marketing’s goal.

1. Strategic Alignment (Cont…) Many projects fail if the IT department alone initiates them and there is little or no alignment with business unit or organizational strategies.

2. Stakeholder Analysis A stakeholder is a person, group, or organization that can affect (or can be affected by) a new system. In general, the most important stakeholders in the introduction of a new system are the project champion, system users, and organizational management, but systems sometimes affect other stakeholders as well.

For example, the IS department can be a stakeholder of a system because IS jobs or roles may be changed significantly after the system’s implementation.

PROJECT SELECTION

Project Selection Issues Approval committee works from the system request and the feasibility study Project portfolio – how does the project fit within the entire portfolio of projects? Trade-offs must be made to select projects that will form a balanced project portfolio Viable projects may be rejected or deferred because of project portfolio issues.

Summary Project initiation involves creating and assessing goals and expectations for a new system Identifying the business value of the new project is a key to success Feasibility study is concerned with insuring that technical, economic, and organizational benefits outweigh costs and risks Project selection involves viewing the project within the context of the entire project portfolio, and selecting those projects that contribute to balance in the portfolio

Copyright © 2006 John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that permitted in Section 117 of the 1976 United States Copyright Act without the express written permission of the copyright owner is unlawful. Request for further information should be addressed to the Permissions Department, John Wiley & Sons, Inc. The purchaser may make back-up copies for his/her own use only and not for redistribution or resale. The Publisher assumes no responsibility for errors, omissions, or damages, caused by the use of these programs or from the use of the information contained herein.