A – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Decision Making A For Operations Management, 9e by Krajewski/Ritzman/Malhotra.

Slides:



Advertisements
Similar presentations
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Decision.
Advertisements

© 2007 Pearson Education Decision Making Supplement A.
Operations Management
Decision Theory.
Module 16 – Decision Theory
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5S Decision Theory.
Decision Process Identify the Problem
Lecture 5 Decision Analysis Chapter 14.
1 IES 303 Supplement A: Decision making Week 3 Nov 24, 2005 Objective: - Amazon.com Case discussion: competitive advantage - Understand practical techniques.
Managerial Decision Modeling with Spreadsheets
A – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Decision Making A For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
3 Decision Analysis To accompany Quantitative Analysis for Management, Twelfth Edition, by Render, Stair, Hanna and Hale Power Point slides created by.
Supplement A Decision Making.
DECISION THEORY Decision theory is an analytical and systematic way to tackle problems A good decision is based on logic.
ISMT 161: Introduction to Operations Management
To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Supplement A Decision Making.
Decision Analysis Chapter 3
Supply Chain Location Decisions Chapter 11 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall
IES 303 Supplement A: Decision making Week 3 Nov 24, 2005 Objective:
Project Analysis and Evaluation
© 2008 Prentice Hall, Inc.A – 1 Operations Management Module A – Decision-Making Tools PowerPoint presentation to accompany Heizer/Render Principles of.
Uncertainty and Consumer Behavior
Chapter McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. 11 Project Analysis and Evaluation.
Operations Management Capacity Planning Supplement 7
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Supplement.
© 2006 Prentice Hall, Inc.A – 1 Operations Management Module A – Decision-Making Tools © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
Predictive Modeling and Analysis 8-1.  Logic-Driven Modeling  Data-Driven Modeling  Analyzing Uncertainty and Model Assumptions  Model Analysis Using.
Copyright © 2003 Pearson Education Canada Inc. Slide 3-28 Chapter 3 Cost-Volume-Profit Analysis.
McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. 11 Project Analysis and Evaluation.
Cost-Volume-Profit Analysis © 2012 Pearson Prentice Hall. All rights reserved.
OPERATIONS MANAGEMENT for MBAs
“ The one word that makes a good manager – decisiveness.”
Chapter 7 ©2001 South-Western College Publishing Pamela S. Lewis Stephen H. Goodman Patricia M. Fandt Slides Prepared by Bruce R. Barringer University.
1 Practical Problems in Capital Budgeting Lecture 3 Fall 2010 Advanced Corporate Finance FINA 7330 Ronald F. Singer.
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 12 Financial and Cost- Volume-Profit Models.
Copyright © 2015 Pearson Education, Inc. publishing as Prentice Hall 14-1.
Marketing by the Numbers
PowerPoint presentation to accompany Heizer/Render - Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Chapter 11 Project Analysis and Evaluation McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
© 2007 Pearson Education Decision Making Supplement A.
Breakeven Analysis Improving Productivity. Break-Even Analysis Break-even analysis has TWO forms: – A. CVP (cost-volume-profit): to determine the volume.
A - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall A A Decision-Making Tools PowerPoint presentation to accompany Heizer and Render Operations.
Decision Theory McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Lecture 6 Decision Making.
Models for Strategic Marketing Decision Making. Market Entry Decisions To enter first or to wait Sources of First-Mover Advantages –Technological leadership.
Decision Trees. Introduction Decision trees enable one to look at decisions: with many alternatives and states of nature which must be made in sequence.
Decision Theory Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
1-1 Steps to Good Decisions  Define problem and influencing factors  Establish decision criteria  Select decision-making tool (model)  Identify and.
Fundamentals of Decision Theory Chapter 16 Mausam (Based on slides of someone from NPS, Maria Fasli)
Lecture 03.0 Project analysis Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved McGraw-Hill/Irwin.
BUAD306 Chapter 5S – Decision Theory. Why DM is Important The act of selecting a preferred course of action among alternatives A KEY responsibility of.
Decision Theory McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
QUANTITATIVE TECHNIQUES
Decision Analysis.
SUPPLEMENT TO CHAPTER TWO Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1999 DECISION MAKING 2S-1 Chapter 2 Supplement Decision Making.
Decision Making Under Uncertainty: Pay Off Table and Decision Tree.
5s-1Decision Theory CHAPTER 5s Decision Theory McGraw-Hill/Irwin Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The.
Decision Theory Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Accounting & Finance 3.3 ~ BREAK-EVEN ANALYSIS SUNDAY, JUNE 05, 2016 PAGES
© 2011 Pearson Education, Inc. publishing as Prentice Hall Break-Even Analysis  Technique for evaluating process and equipment alternatives  Objective.
A – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Decision Making A For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Cost-Volume-Profit Analysis
Chapter 5S – Decision Theory
Steps to Good Decisions
Supplement: Decision Making
Chapter 7 Decision-Making Tools and Techniques Pamela S. Lewis
Decision Making Supplement A
Improving Productivity
Presentation transcript:

A – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Decision Making A For Operations Management, 9e by Krajewski/Ritzman/Malhotra © 2010 Pearson Education Homework: Workshop #1, #2, 5, 14, 15abc

A – 2 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Learning Objectives About the best alternative under various outcome scenarios. Break Even Analysis Preference Matrix Certainty Uncertainty Risk Expected Value Decision Trees

A – 3 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Break-Even Analysis Evaluating Services or Products  Is the predicted sales volume of the service or product sufficient to break even (neither earning a profit nor sustaining a loss)?  How low must the variable cost per unit be to break even, based on current prices and sales forecasts?  How low must the fixed cost be to break even?  How do price levels affect the break-even quantity?

A – 4 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Break-Even Analysis Break-even analysis is based on the assumption that all costs related to the production of a specific service or product can be divided into two categories: variable costs and fixed costs Variable cost, c, is the portion of the total cost that varies directly with volume of output If Q = the number of customers served or units produced per year, total variable cost = cQ Fixed cost, F, is the portion of the total cost that remains constant regardless of changes in levels of output

A – 5 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Break-Even Analysis By setting revenue equal to total cost pQ = F + cQ Q = F p - c So Total cost = F + cQ Total revenue = pQ

A – 6 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Finding the Break-Even Quantity EXAMPLE A.1 A hospital is considering a new procedure to be offered at $200 per patient. The fixed cost per year would be $100,000, with total variable costs of $100 per patient. What is the break-even quantity for this service? Use both algebraic and graphic approaches to get the answer.

A – 7 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Finding the Break-Even Quantity Total annual costs Fixed costs Break-even quantity Profits Loss Patients (Q) Dollars (in thousands) 400 – 300 – 200 – 100 – 0 – |||| (2000, 300) Total annual revenues The two lines intersect at 1,000 patients, the break-even quantity FIGURE A.1 – Graphic Approach to Break-Even Analysis (2000, 400)

A – 8 Break-Even Analysis CommunityFixed Costs (F)c A$150,000$62 B$300,000$38 C$500,000$24 D$600,000$30

A – 9 Break-Even Analysis Q (thousands of units) A best B bestC best Break-even point A D B C (20, 1390) (20, 1200) (20, 1060) (20, 980) Annual cost (thousands of dollars) Break-even point

A – 10 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Preference Matrix A Preference Matrix is a table that allows you to rate an alternative according to several performance criteria The criteria can be scored on any scale as long as the same scale is applied to all the alternatives being compared Each score is weighted according to its perceived importance, with the total weights typically equaling 100 The total score is the sum of the weighted scores (weight × score) for all the criteria and compared against scores for alternatives

A – 11 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. EXAMPLE A.4 The following table shows the performance criteria, weights, and scores (1 = worst, 10 = best) for a new thermal storage air conditioner. If management wants to introduce just one new product and the highest total score of any of the other product ideas is 800, should the firm pursue making the air conditioner? Evaluating an Alternative Performance CriterionWeight (A)Score (B) Weighted Score (A  B) Market potential Unit profit margin Operations compatibility Competitive advantage Investment requirements10220 Project risk5420 Weighted score =750

A – 12 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Preference Matrix Example North Total patient miles per month 254 Facility utilization 20 3 Average time per emergency trip203 Expressway accessibility154 Land and construction costs101 Employee preference105

A – 13 Decisions Under Certainty Example: New product introduction. Build a large or small facility? Possible Future Demand LowHigh Build Small Build Large A manager knows with certainty which event or outcome will occur. Pick the alternative with the best payoff for the known outcome.

A – 14 Decision Making Under Uncertainty Maximin Maximax Laplace Possible Future Demand LowHigh Build Small Build Large160800

A – 15 Decisions Under Risk Similar to Laplace technique, but we use estimated probabilities (not equal) for the outcomes. Possible Future Demand LowHigh Build Small Build Large160800

A – 16 Expected Value Concept (Used in Decision Trees)

A – 17 Decision Trees Model of alternatives along with potential consequences. Square Nodes – decision points. Circular Nodes – chances/probabilities that must sum to one. Branches – represent alternatives or different possibilities. Payoffs EV

A – 18 Analyzing a Decision Tree $200 $223 $270 $40 $800 $20 $220 Don’t expand Expand Low demand [0.4] High demand [0.6] 2 Low demand [0.4] High demand [0.6] 3 Do nothing Advertise Modest response [0.3] Sizable response [0.7] Small facility Large facility 1

A – 19 Workshop #1 A firm must decide whether to construct a small, medium, or large stamping plant. A consultant’s report indicates a.20 probability that demand will be low and a.80 probability that demand will be high. If the firm builds a small facility and demand turns out to be low, the net present value will be $42 (million). If demand turns out to be high, the firm can either subcontract and realize a NPV of $42 or expand greatly for an NPV of $48. The firm could build a medium size facility as a hedge: If demand turns out to be low, its NPV is estimated at $22; if demand turns out to be high, the firm could do nothing and realize a NPV of $46, or it could expand and realize a NPV of $50. If the firm builds a large facility and demand is low, the NPV will be -$20, whereas high demand will result in a NPV of $72. Analyze this issue using a decision tree. What would be the maximin alternative?

A – 20 Workshop #2 Refer to Problem #15 in the textbook. Suppose after a certain amount of discussion, management is able to assess the probabilities of demand as follows: P(low)=.40 P(moderate)=.40 P(high)=.20 Determine the expected profit of each alternative. Which alternative is best?

A – 21 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

A – 22 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.