1 Investment workstream, GRI NW Investments and Incentives an economic perspective Machiel Mulder Office of Energy Regulation Netherlands Competition Authority.

Slides:



Advertisements
Similar presentations
Gender Perspectives in Introduction to Tariffs Gender Module #5 ITU Workshops on Sustainability in Telecommunication Through Gender & Social Equality.
Advertisements

Cross-Border Infrastructure: A Toolkit Tariff and Rate Setting Session on Regulation & Accountability Max Bradford Castalia The views expressed here are.
The Single Electricity Market in Ireland
Safeguarding Investments In Gas Infrastructure Informal lecture Agency for the Cooperation of Energy Regulators, ACER - By Tim Boersma.
North / North West Region Regional Gas Initiative Regulatory Co-ordination Workshop 8 th February 2007.
Offshore Transmission Giles Stevens Head of offshore electricity transmission.
Workshop on “Requirements of financial institutions on the financing of gas infrastructure projects, Brussels, Regulatory requirements for new.
Electricity interconnectors – next generation Martin Crouch Future Energy Strategies seminar 3 July 2012.
A regulatory framework for gas quality treatment facilities: recap and update.
The big picture in the EU Managing conflicting objectives in tariff design Tom Maes, Vice-Chair CEER Gas Working Group Understanding the impact of regulatory.
7 th IG meeting, South Gas Regional Initiative Madrid, 10 th July 2008 Consultation on Requirements for Gas Interconnection Capacity between Spain and.
Gas Regional Initiative – North West Region London 14 November 2008 Chair: Joachim Gewehr Capacity Project C1 Short-Term Capacity (STC) Initial findings.
GRI NW Investment - From virtual to measurable support Update on project Common effort on making regional investment happen Hague 4 june 2010.
Investment workstream 20 January 2009 Cross-border gas transmission‏ Investment project (I1) Advisory Group Meeting Conclusions and minutes, draft Bonn.
Towards Regional Independent Operators – a main driver for successful market integration.
The prime aim Make you acquainted to the contractual approach to agency problems.
1 Cross-border Investment TRIGGERS GRI NW Investment I1- Virtual Test – Stockholm September 24, 2009 By : Johan Allonsius.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
Financial performance measures and transfer pricing
Euroheat & Power Why is there not more combined heat and power?
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
Chapter 3 – Opportunity Cost of Capital and Capital Budgeting
New Procurement & Delivery Arrangements for the Schools’ Estate Presentation to Strategic Advisory Group 18 April 2005.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
|Date faculty of law groningen centre of energy law 1 Security of Supply – EU Perspective and Legal Framework First EU-Russia Energy Law Conference,30.
Why are economic and financial instruments needed? A presentation made by Noma Neseni, IWSD.
Classification: Internal Status: Draft ERGEG GRI NW Investment Workstream Shippers’ contribution Helga FRANSE, Jerome DUROYON,
Regulatory Transparency and Interaction with the Government Dr. Konstantin Petrov Head of Section, Policy and Regulation.
Valeria Termini Member of the CEER GA FTS-CEER bilateral meeting, Florence 06 th February 2012 Investment planning rules in Europe.
Regulatory Approaches to Managing Investment Uncertainty Gülefşan Demirbaş ICER VWG2 Co-Chair.
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project (I1) Update The Manual for near term investment procedures for (cross-
Investment in Gas Infrastructure A regulator´s view Nina GRALL Seminar on Gas Industry Restructuring in SEE 4/5th October 2005, Belgrade.
Gas Regional Initiative North-West Transmission System Operators Page 1 Investment work stream GRI North-West Operators‘ Group Investment Work Stream SG.
Sound Investment Climate? Jacques Laurelut GTE President CEO of GRTgaz Bratislava, 28 September 2006.
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
Incentive Regulation for business development GTE Conference, Copenhagen 24th September 2004 Paolo Caropreso, COO Business Development.
International Legal Regulation of the Securities Market Regulation of the securities market is an ordering activity of all its participants and transactions.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
Assessing Risks/Challenges in Energy Cooperation Christopher Findlay Asia Pacific School of Economics & Management The Australian National University Presented.
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project GRI NW (I1) Opening of the Day 2 nd Investment workshop GRI NW.
Working on investment climate in the NW-region Update By projectleader Investment I1 GRI North-West Investment workstream
13 February 2007, Brussels Electricity Infrastructure Workshop Shaun Kent, co-chair Electricity Regional Initiative TF.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
GRI NW Investment - Update on project Common effort on making regional investment happen 21 September 2010.
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
Accounting 4310 Appendix Capital Investment Decisions.
Promoting Gas-Interconnector Investment - Insights from Laboratory Experiments Bastian Henze Tilburg University, CentER & TILEC GRI Workshop Stockholm,
Gas Regional Initiative – North West Region London 13 and 14 November 2008 Project manager: Erik Rakhou Investment project – I1 (in co-operation with I2)
Location, location, location FSR Executive Seminar Which network for which market design? Martin Crouch June 2014.
The Central Role of the Network Operators 28 March 2007 ERGEG-GTE Meeting.
Standard Setting: Economic Issues
Brussels workshop on Investment: 26 and 27 February 2009 “Simulating a (virtual) gas pipeline investment in the NW region” Why do we need the Virtual Test.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
GRI Investment Project A-Z Adam Cooper EFET Stockholm 24 September.
Investment workstream 08 June 2009 Cross-border gas transmission‏ Investment project (I1) Update for Joint GRI NW Meeting Where are we heading since last.
1 Open Seasons between France and Belgium GRTgaz Fluxys Gas Regional Initiative North-West Stakeholders Meeting 7 May 2010.
Gas Regional Initiative W orkstream regulatory co-ordination, subfocus investment Workshops Bonn, 8 February 2007 Draft 2.
MODULE 1. Understanding the investment climate: European approach CO-FINANCED BY EUROPEAN UNION JEAN MONNET MODULES, project " Good governance, strong.
Ratio Analysis…. Types of ratios…  Performance Ratios: Return on capital employed. (Income Statement and Balance Sheet) Gross profit margin (Income Statement)
7th Stakeholder Group meeting The Hague – 07 May 2010 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer, E.ON.
Directorate-General for Energy and Transport Mark van Stiphout – C2 Electricity and Gas GSE Workshop on storage investment 24 May 2007 Policy framework.
The Role of TSO. Madrid, 7-8 Feb The Role of TSO2 The roles of industry players First vision of role of TSO in GTE position paper Industry players.
Draft Decision on the Reset of Prices for Electricity Distribution Businesses Presentation to Market Analysts 19 July 2011.
Gas Regional Initiative – North West Region Stakeholders Group meeting - London 14 November, 2008 Capacity Workshop Coordinated Open Seasons Marie-Claire.
Background and Process
Financial Management M.Com Sem 1 CC 701 Dr. K.H.kharecha.
Regulation for Smart Grids
EUROGAS LNG TASK FORCE Bilbao, 13 March 2009 Presentation by
COST-BENEFIT ASSESSMENT (CBA)
Presentation transcript:

1 Investment workstream, GRI NW Investments and Incentives an economic perspective Machiel Mulder Office of Energy Regulation Netherlands Competition Authority (NMA) GRI Meeting Brussels, 26 February 2009

2 Investment workstream, GRI NW 1.Background: a.desire for timely, efficient and effective investments b.objective: improving investment climate 2.Factors hindering investments according to stakeholders a.regulation b.long-term dimension of investments c.liquidity of markets 3.Incentives a.defining incentives b.testing incentives Outline

3 Investment workstream, GRI NW 1. Background GRI NW searches for timely, efficient and effective investments in gas infrastructure. Does this mean: as soon as possible? as cheap as possible? as large as possible? From an economic point of view, the answer is no. In economic term, GRI NW searches for optimal investments in gas infrastructure.

4 Investment workstream, GRI NW 1. Timely investments The optimal time of investment is when the present value of the net cash flows is maximised Cashflow Time Invest- ment 0 Revenues t=0t=3t=1t=2t=5t=4t= NPV = - 5 (discount factor = 10%) Postponing the investment by 1 year makes it break even

5 Investment workstream, GRI NW 1. Efficient investments Efficiency includes several aspects: productive efficiency: using the most efficient technique in the most efficient way allocative efficiency: allocating goods in the optimal way, i.e. meeting user’s demand taking into account all costs and benefits dynamic efficiency: developing new techniques, suppling new products to users

6 Investment workstream, GRI NW Output A (e.g. long-term capacity) Output B (e.g. short-term capacity) 1. Efficient investments X (inefficient investment) Production possibilities curve catching up innovation Efficient investments result in maximum output per input

7 Investment workstream, GRI NW 1. Effective investments Effective means: delivering the products demanded by the market (i.e. market value) contributing to competition & security of supply (i.e. external effects) Effective investments are at the right place have the optimal size

8 Investment workstream, GRI NW 1. Objective: improving investment climate The theoretical benchmark is that in well-functioning markets, economic agents make optimal decisions: prices reflect scarcity and give signals to both producers and consumers to respond optimally because producers maximise their profits, they will try to be as efficient as possible (i.e. best technique, innovation) However, the gas market is not equal to this theoretical benchmark: regulated agents (regulatory uncertainty) long-term investments (commitment problem) no market for international coordination external effects on security of supply and competition Focus of GRI NW

9 Investment workstream, GRI NW 1. Investment climate: how to create a balanced framework? TimelinessEffectiveness Efficiency Investment climate Currently: Regulation focuses mainly on efficiency Objective: Fostering effectiveness and timeliness without losing on efficiency

10 Investment workstream, GRI NW 2. Factors hindering cross-border investments Views of stakeholders on regulation: lack of coordination between regulators and regulatory regimes hinders coordinated Open Season and investment projects absence of legal obligations to align investments with neighbouring TSOs limited length of regulatory period in some countries creates uncertainty lack of clarity of regulated tariff regimes for cross-border investments hinders both TSO and shippers in making commitments ‘old fashioned’ investment criteria which are to much focussed on short-term efficiency

11 Investment workstream, GRI NW Views of stakeholders on TSOs Open Seasons are difficult to coordinate and favour long-term bookings, enabling TSOs to delay any decision making process TSOs hinder investments by wanting long-term commitments from the market 2. Factors hindering cross-border investments

12 Investment workstream, GRI NW Views of stakeholders regarding the market: poor development and lack of liquidity of spot market which increases uncertainty about future demand absence of liquid secondary market which increases uncertainty for investors 2. Factors hindering cross-border investments

13 Investment workstream, GRI NW 2. How does the optimal investment regime look like? Views stakeholders: a stable, predictable and fair return on investments coordinated planning from both sides of the market binding commitments from the market for a certain amount of capacity cooperation between regulators and TSOs compatible regulatory frameworks View regulator/government: framework should foster efficient investments preventing stranded assets risks and rewards should be balanced

14 Investment workstream, GRI NW 1. Analytical framework Timeliness bonus/malus for timing (compare NorNed) Problem Incentives Effectiveness Efficiency higher rate of return ex ante approval of investments longer regulatory period exemption of regulation bonus/malus for available capacity CPI-X regulation to raise productive efficiency 3. Incentives Note: be aware of trade-offs: e.g.: incentive for effectiveness might reduce efficiency

15 Investment workstream, GRI NW 3. Testing incentives for investments EXTERNAL ENVIRONMENT - demand for gas - domestic production Behaviour REGULATORS / GOVERNMENTS - ex post /ex ante assessment - rate of return on capital - length of regulatory period Behaviour SHIPPERS Behaviour TSOs -need for capacity -uncertain about future sales -risks of investments -need for certainty about revenues (use of) investments Measuring the performance: a.In time? b.The optimal size? c.Efficient technique ? t