Köksal Holding
MAIN STEPS FOR A NEW HOSPITAL A. PLANING OF THE PROJECT B. PREPARING FIZIBILITY C. PROJECT DESIGN D. DEVELOPMENTS AND RESULTS
A. THE PLANNING OF THE PROJECT 1. DEPARTMENTS 2. AREAS 3. HUMAN RECOURSES 4. MEDICAL EQUIPMENTS 5. NON MEDİCAL EQUIPMENTS
PLANING DEPARTMENTS
HUMAN RESOURCES PLANING
STAFF DOCTORS PLANING
B. FIZIBILITY DETERMINATION OF INVESTMENT AMOUNT DETERMINATION OF OPERATING COSTS INCOME AND EXPENSE ANALYSIS OF RESOURCES DEPARTMENTS INCOME AND EXPENSE PLANNING BREAK EVEN POINT AND PROJECT NPV
CALCULATION OF NET PRESENT VALUE
PREPEARED SCENARIO
C. PROJECT DESIGN ARCHITECTURAL PROJECT DESIGN 1/100 1/50 and 1/20 AND SOMETIMES 1/1 ELECTRIC WATER CONDITIONING AND OTHER DESIGN studies APPLICATION PROJECTS IMPLEMENTATION PLANS START WORKS AUDIT AND CONTROL RESULTS
D. DEVELOPMENTS AND RESULTS MAKING PURCHASING PLANS PREPARATION OF TECHNICAL SPECIFICATIONS PLANNING OF PURCHASE AND DELIVERY TIMES ORDERING to PASSED INSPECTION-CONTROL - ADMISSION AND COMPLETION LAST CONTROLS BEFORE BEGINING JOBS ACCEPTING PATIENTS