CMS National Conference on Care Transitions December 3, 2010 1.

Slides:



Advertisements
Similar presentations
Re-Engineered Discharge
Advertisements

1 A ccelerating B est C are I n P ennsylvania Hazleton General Hospital “Heart Failure Discharge Instructions Team” June 7, 2007.
HCAHPS and Hospital Value-Based Purchasing (Hospital VBP) Agency for Healthcare Research and Quality Centers for Medicare and Medicaid Services.
PAVE Project Status Report November 16, Innovative Regional Solutions Reduce Readmission Rates by 10% Increase Patient & Family Engagement Improve.
INSTITUTIONAL SPECIAL NEEDS PROGRAM Best Practices in Care Coordination and Care Transitions Beth Ann Martucci, DNP, CRNP Director of Clinical Operations.
1 Seven Home-Health Touch Points to Prevent Avoidable Re-hospitalizations Jennifer Wieckowski, MSG Program Director, Care Transitions Health Services Advisory.
2.11 Conduct Medication Management University Medical Center Health System Lubbock, TX Jason Mills, PharmD, RPh Assistant Director of Pharmacy.
Care Coordination Program for Heart Failure Susan Levine RN Director Clinical Resource Management Carolyn Timmons BSN,RN Lead Clinical Care Coordinator.
Heal Teach Discover Serve Geisinger Value 1 Transitions of Care/Personal Health Navigator January 31, 2009.
Improving care transitions at Harborview Medical Center Frederick M. Chen, MD, MPH Chief of Family Medicine Associate Professor, University of Washington.
Risk Assessment - What are we Learning? Stephanie Mudd RN MSM CCM Supervisor, Care Management TG/AH/MBCH 1 Presented by Washington State Hospital Association.
Medicare Quality Improvement and Provider Technical Assistance: An Overview of the Next Five Years December 8, 2014 Mary Fermazin, MD, MPA, Chief Medical.
It’s A Success! Achieving Cost-Effective Disease Management in CHF Sherry Shults, RN BSN CIO South Carolina Heart Center.
A Model to Reduce Acute Care Readmissions Susan Weber, RN Chief Nursing Officer Angela Venditte, LPN, CMCO Assurance HealthCare.
The Big Puzzle Evolving the Continuum of Care. Agenda Goal Pre Acute Care Intra Hospital Care Post Hospital Care Grading the Value of Post Acute Providers.
Wentworth-Douglass Hospital Story Kimberly Chapman, RN, MS, CNL, PCCN Discharge Advocate for Project RED Wentworth-Douglass Hospital Dover, NH Monique.
The Finley Hospital.  Describe “best practice” methodologies associated with patient perception of readiness for discharge  Examine areas of “excellence”
PREVENTING READMISSIONS OF CONGESTIVE HEART FAILURE PATIENTS Daidreanna Whiteman Senior Project Columbus State University Summer 2014.
Virginia Department of Medical Assistance Services July 27, 2012
Coordinating Care to Improve Healthcare in Kern County Jennifer Wieckowski, MSG State Program Director Health Services Advisory Group (HSAG) May 2015.
Memorial Hermann Healthcare System Clinical Integration & Disease Management Dan Wolterman April 15, 2010.
Care Transitions (CT) Special Innovation Project (SIP) THIS MATERIAL WAS PREPARED BY THE ARKANSAS FOUNDATION FOR MEDICAL CARE INC. (AFMC), THE MEDICARE.
CMS National Conference on Care Transitions December 3,
Can You Surf the “Silver Tsunami?”
Safe Transitions Of Care STOC 2011 MHA Pilot- 4Q 2010 Transition responsibility belongs to the sending clinician/organization, until the receiving practitioners.
Reduction Of Hospital Readmissions Hany Salama, MD Diplomat ABIM IM Hospice and Palliative Care Sleep Medicine.
Care Coordination and Transition A hospital’s journey to partner with a community-based organization (CBO) to improve care across the continuum Naphtali.
1 Using TeamSTEPPS to Make Safety Improvements Tara Brown, MPH,CQIA, CQA Evaluation Specialist Georgia Medical Care Foundation The Medicare Quality Improvement.
Care Transitions in Georgia: Partnering with your community to move readmissions Jennifer Hodge RN MSBA Aim Lead, Integrating Care for Populations Communities.
Reaching Out to Reduce Readmissions William C Crowe, Jr, DNP, APN, ACNP-BC, FNP-BC; Paul M Smith, RN; Jodi Whitted, MSSW, LCSW Erlanger Health System,
PUTTING THE PIECES TOGETHER: REDUCING AVOIDABLE READMISSIONS.
© Joint Commission Resources Reducing Hospital Readmissions Deborah Morris Nadzam, PhD, BB, FAAN Project Director AHRQ and CMS Contracts Joint Commission.
Reducing Avoidable Readmissions A Cross-Continuum Approach.
Excellent Transitions: Reducing Readmissions Lana McKinney RN, Continuity of Care Service Director Mark Taylor MD, Hospital-Based Services Kaiser Permanente.
© Copyright, The Joint Commission Integration: Behavioral and Primary Physical Health Care FAADA/FCMHC August, 2013 Diana Murray, RN, MSN Regional Account.
Project RED The Re-Engineered Discharge JCR’s AHRQ-funded Project Florida Hospital Association June 4, 2010 Deborah M. Nadzam, PhD, FAAN Project Director.
INTERACT COLLABORATIVE ORIENTATION SESSION NYSHFA/IPRO PARTNERSHIP Sara Butterfield, RN, BSN, CPHQ, CCM Christine Stegel, RN, MS, CPHQ NYSHFA/IPRO INTERACT.
Thinking Differently about Hospital Readmissions Presented by Glenna Yaroch, MBA,PT Owner/President Home Instead Senior Care September 12, 2014.
Caroline Ryan, MA (SW) Aging Care Connections Thank you to The Practice Change Fellows Program, The Atlantic Philanthropies and The John A. Hartford Foundation.
Georgia Medical Care Foundation The Care Transitions Community Initiative Working Together Across Care Settings.
Project RED The Re-Engineered Discharge JCR’s AHRQ-funded Project August 2010 Deborah Nadzam Susan Whitehurst.
A partnership of the Healthcare Association of New York State and the Greater New York Hospital Association NYSPFP Preventable Readmissions Pilot Project.
Introduction The Readmission and Transition of Care teams at Scott & White Hospital – Brenham combined in an effort to develop, in the absence of a Case.
22670 Haggerty Road, Suite 100, Farmington Hills, MI l Save Your Census: Strategies to Prevent Re-hospitalization March 30, 2010 Joint.
Readmissions: Process Improvement using the INTERACT II Tools Linda Denison Bub MSN, RN, GCNS-BC Director of Senior Health Services.
Carroll County Memorial Hospital Mindie Stovall LPN, CPHQ Director of Quality and Clinic Nurse Staff.
CMS National Conference on Care Transitions December 3,
Reducing Readmissions K-HEN Data Collection & Submission Dolores Hagan, RN BSN K-HEN Education and Data Manager August 2012.
Comprehensive Transition Planning During the Hospital Stay RARE Mental Health Collaborative Learning Day February 19, 2014 Dr. Paul Goering VP Mental Health.
CAHPS PATIENT EXPERIENCE SURVEYS AHRQ ANNUAL MEETING SEPTEMBER 2012 Christine Crofton, PhD CAHPS Project Officer.
Stratis Health Prevention Project June 30, Stratis Health Stratis Health is a non-profit organization that leads collaboration and innovation.
MiPCT Embedded Case management Barriers to developing an embedded Case Management program.
Implementing teach-back using improvement methodology 11 th March 2013 Julie Adams Senior Programme Manager, NSD.
Transitions of Care/Personal Health Navigator
MA STAAR Fall Learning Session Ensuring Post-Hospital Care Follow-up 2:45-4:00PM Breakout St. Anne’s Hospital, MetroWest Medical Center Peg Bradke and.
Readmissions Driver Diagram OHA HEN 2.0. Readmissions AIMPrimary Drivers Secondary DriversChange Ideas Reduce Readmissions Identify patients at high-risk.
The Hospital CAHPS Program Presented by Maureen Parrish.
Jane Brock, MD, MSPH Colorado Foundation for Medical Care This material was prepared by CFMC, the Medicare Quality Improvement.
11 Kansas Heart & Stroke Collaborative September 22 and 23, 2014.
History of Partnerships in Colorado For Cost Reduction in Elder Care History of Partnerships in Colorado For Cost Reduction in Elder Care April 2011, CMS.
Presenters: Kathy Cummings, ICSI Kattie Bear-Pfaffendorf, MHA Janelle Shearer, Stratis Health.
PONCE HEALTH SCIENCES UNIVERSITY PONCE RESEARCH INSTITUTE Puerto Rico Improve Medication Adherence & Effective Use Of E-prescribing.
Partnership for Patients: Readmission Reduction Presented by: Rachel Cicerchi, MPH Program Manager, Texas Center for Quality & Patient Safety Texas Hospital.
Working for healthier lungs The Whys and Whats of Care Bundles 23 November 2012.
 Proposed Rule by the Centers for Medicare & Medicaid Services on 11/03/2015Centers for Medicare & Medicaid Services11/03/2015  Revises the discharge.
of Patients with Acute Myocardial Infarction (AMI)
Region 15 Regional Healthcare Partnership 13th Public Meeting
CTC Clinical Strategy and Cost Committee
Mission Health System COPD Readmission Data
Roadmap to Readmission Reduction: Sharing Resources
Presentation transcript:

CMS National Conference on Care Transitions December 3,

How Project RED and the Care Transitions Project Reduced Readmissions in South Texas Robin Jones, RN Quality Care Coordinator Valley Baptist Medical Center- Brownsville Jennifer Markley, RN, BSN Senior Director, Medicare Quality Improvement TMF Health Quality Institute 2

CMS Care Transitions Project Project began in August of 2008 Data analysis was based on 2007 Medicare claims data 14 communities in the U.S Reduce hospital readmissions through improved quality of patient transitions 3

CMS Care Transitions Project Goal is minimum 2% reduction 30-day rehospitalization rate by 28 th month of the project (November 2010) A comprehensive community- wide, cross-setting effort Yield sustainable and replicable strategies 4

CMS Care Transitions Project This map shows the 14 states where Care Transitions projects are located. 5

Baseline Measurements TABLE 1: Hospital Disposition After Inpatient Hospitalization Quarter 1, 2008 based on Medicare Claims Data 6

Valley Baptist Medical Center-Brownsville A faith based 280 bed licensed, not- for-profit acute care hospital, including a 37 bed off-campus Psych facility Level 3 designated trauma center JC accredited for hospital & lab and stroke-certified Located on the southernmost tip of Texas, on the border with Mexico 7

Baseline Measurements – VBMC-B CT Project hospital baseline rate of 23.3% all cause 30-day readmission rate (Q1 2008) 28.1% Hospital Compare heart failure readmission rate – Data for discharges between July 01, 2006 and June 30, 2009 – ( 8

Solutions Implementation of Project RED −Initial focus on HF patients, Telemetry Unit −May 2010, expanded to all diagnoses, Telemetry Unit Community-wide partnership with downstream providers −Use of EHR to improve hand-off communication −Active involvement in Regional Workgroup meetings 9

Solutions Education of medical staff including physicians – Medication reconciliation – Health literacy and patient safety – Chronic kidney disease 10

Implementation All components of Project RED were implemented and monitored in facility’s 30 bed Telemetry floor −Team approach to administering all eleven components −Nursing, Care Management, Pharmacy and Core Measures Team all contributed to process 11

Teamwork Nursing & Care Management – Educate the patient about his or her diagnosis throughout the hospital stay – Discuss with the patient any tests or studies that have been completed in the hospital and discuss who will be responsible for following up on the results – Review the appropriate steps for what to do if a problem arises 12

Teamwork Nursing – Provide follow-up telephone reinforcement – Assess degree of understanding (teach-back) – Provide patient with a written discharge plan – Make appointments for clinician follow-up and post-discharge testing 13

Teamwork Care Management – Organize the post-discharge services – Expedite transmission of the Discharge Resume to the physicians and other services accepting responsibility for the patient’s care after discharge 14

Teamwork Nursing, Pharmacy & Care Management – Confirm the Medication Plan Nursing/Core Measures – Reconcile discharge plan with national guidelines 15

Monitoring for Effectiveness Patients were asked a total of nine brief yes or no questions about their perceptions. Surveys were available in English and Spanish. – I was taught about my diagnosis during my hospital stay. – I have follow-up appointments with my physicians. – I have been told about test results or studies that have not been completed before I go home. – If I need home health care, medical equipment or other help or services after I go home, it has been arranged. – I understand what to do and who to call if a problem arises after I am home. 16

Monitoring for Effectiveness Survey Questions continued: – I have received a written discharge plan that is easy to read and understand. – I have received a written discharge plan that has the information I need to take care of myself at home. – I have a written list of my discharge medications and know which medications are new or changed. – When the nurses were teaching me, they asked me to explain what I had learned in my own words. 17

Administering Patient Surveys Case Management (CM) runner sends out daily Length of Stay (LOS) report to identify patients going home with no services to Case Managers, Tele Supervisor/Charge Nurse, and Quality Assurance Floor staff is responsible for completing all components of RED prior to discharge 18

Administering Patient Surveys CM runner delivers and retrieves patient survey and forwards completed surveys to Quality CM updates the LOS report daily to reflect D/C plan and submit to CM runner and Quality 19

Patient Survey Results Data Averages based on 273 completed surveys between January and September % of patients surveyed said that they had received education about their diagnoses 94% of patients surveyed said that they had a follow-up appointment. 88% had a follow-up appointment scheduled within one week post-discharge 99% of patients surveyed said that their written discharge plan had the information needed for self care and that it was easy to read and understand 20

CT Project Results TABLE 2: Hospital Disposition After Inpatient Hospitalization Quarter 1, 2010 based on Medicare Claims Data 21

CT Project Results for Harlingen HRR FIGURE 1: Percent of Discharges with a 30-day Readmission for HHRR Hospital Disposition After Inpatient Hospitalization Baseline compared to Quarter 1, 2010 based on Medicare Claims Data 22

CT Project Results for VBMC-B FIGURE 2: Percent of Discharges with a 30-day Readmission for VBMC-B Hospital Disposition After Inpatient Hospitalization Baseline compared to Quarter 1, 2010 based on Medicare Claims Data 23

CT Project Outcome Measures for VBMC-B FIGURE 3: Percent of Hospital Readmission Within 30 Days Semi-annual rate ending in Quarter A 3.6% decrease in all cause 30-day readmissions 24

CT Project Outcome Measures for VBMC-B FIGURE 4: O-1a: HCAHPS Medication Management 4-quarter rolling rate ending in the listed quarter 25

CT Project Outcome Measures for VBMC-B FIGURE 5: O-1b: HCAHPS Discharge Planning 4-quarter rolling rate ending in the listed quarter 26

CT Project Outcome Measures for VBMC-B FIGURE 6: O-2: Percent of Patients Seen by a Physician Between DC and Readmission 27

For more information about Project RED, contact For more information about Project RED research: For additional information about dissemination: For commercial inquiries:

For more information, contact: Jennifer Markley, RN, BSN, Senior Director, Medicare Quality Improvement TMF Health Quality Institute Phone: Care Transitions Web Site: This material was prepared by TMF Health Quality Institute, the Medicare Quality Improvement Organization for Texas, under contract with the Centers for Medicare & Medicaid Services (CMS), an agency of the U.S. Department of Health and Human Services. The contents presented do not necessarily reflect CMS policy. 9SOW-TX-CT