HW#2 – RSMeans Estimating Prof. Ralph V. Locurcio, PE.

Slides:



Advertisements
Similar presentations
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
Advertisements

CON 4003 Construction Estimating Prof R. V. Locurcio.
FORMWORK Prof Awad S. Hanna.
Breaking and Breaching. Tools Used Sledge hammers –Long and short handled Chisels Pinch point pry bar –“Crow bar” Hacksaw Handsaw Bolt cutter Flat head.
Prof Awad S. Hanna Concrete Structures Concrete Structures.
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
CHAPTER 9 Thermal & Moisture Protection
Construction Cost Estimating Class #5 - Concrete Prof. Ralph V. Locurcio, PE.
Foundation Systems.
Structural Collapse Technician Training
Chapter 6 Measuring Masonry and Finishes. Masonry Work Generally It includes clay bricks, concrete bricks and blocks, clay tiles, and natural and artificial.
Construction Cost Estimating Class #7 - Masonry Prof. Ralph V. Locurcio, PE.
How to do an estimate. Steps 1) Estimate from bottom up –How you construct the project –Lets you get an understanding of project path –Lets you find errors.
Estimating Waste Week 3 CTC-415. What is waste Waste is material that needs to be supplied but may not be used All material items except steel beams and.
CON 4003, CVE 4073, CVE 5073 Construction Estimating Prof R. V. Locurcio, PE.
Construction Estimating Using Excel Professor Locurcio CON4003, CVE4073, CVE5073.
 Building Walls  Wood Framed Walls  Precast Concrete Walls  Steel Framed Walls  Sustainable Walls.
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
What you need today Text Notebook Calculator (optional) 1/8” = 1’ print of foundation (basement) plan –With dimensions.
It’s more than adding and subtracting..  Before bidding, the site should be examined for the following:  Distance from the office  Site conditions.
Construction Cost Estimanting 4003 Cost Estimating/ Engineering Concrete Structures Prepared by: Ebrahim A Alkooheji Instructor: Proff. Locurcio.
CON 4003 Construction Estimating Prof R. V. Locurcio.
Metals. Introduction u Metal is used in various places in the construction process including: –rebar = reinforcing steel in round shapes –flashing = thin.
Exterior Wall (Masonry)
Chapter 4 Measuring Concrete Work
King James Cost Estimation
Residential Wall Systems. Building Walls Wood Framed Walls Precast Concrete Walls Steel Framed Walls Sustainable Walls.
BUILDING CONSTRUCTION V ARCHITECTURAL FINISHING SYSTEMS
ASSIGNMENT Begin on page 197 “The Foundation”.
Construction Framing Mr. Brock. Lumber 2x4s are not actually 2” by 4”
Principles of Manufacturing M anufacturing Mathematics Copyright Texas Education Agency (TEA)
Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out Square Foot Estimating.
Wall and Ceiling Construction
Wood Construction Materials Hardwood Comes from deciduous trees such as oak, birch, walnut, maple, and hickory.
CON 4003 Construction Estimating Prof R. V. Locurcio.
Agricultural Mechanics Fundamentals & Applications
Building Superstructures Construction Mr. O’Rourke.
FORMS, SCAFFOLDING and STAGING
CON 4003 Construction Estimating Prof R. V. Locurcio.
Wood Construction CTC-375.
CON 4003 Construction Estimating Prof R. V. Locurcio.
1 FRENCH RED CROSS in Grenada CONSTRUCTION OF WOODEN HOUSES ACCORDING TO STANDARDS Tel: / Sugar Mill, St George’s.
Objective Calculate the amount of materials needed for a construction project.
Construction Estimating Using Excel Professor Locurcio CON4003, CVE4073, CVE5073.
Chapter 43 Common Commercial Construction Materials.
Fundamentals of Structural Detailing
 Overview of Interior Finishes  Types  Examples.
Chapter 23: Structural Drafting
CON 4003 Construction Estimating Prof R. V. Locurcio.
ASSIGNMENT 1.Begin on page 177 “The Foundation”. 2.Complete “Footing and Foundation”, “Floor and Wall Frame”, “Roof Frame” 3.Label each part of the diagram.
Determine the cost to purchase and install all the 2 x 4 studs listed in Prob The wall is 8’-0” high. Windows are 4’-0” high and doors are 6’-8”.
Construction Estimating Prof R. V. Locurcio. Thermal & Moisture Protection.
Drafting 2 (Arch) Quiz Review #4 Quiz Review. 1. What is the difference between a pier and column? Bearing capacity Soil impact Concrete block Reinforcing.
ESTIMATING STEEL FOR CONCRETE POURS. REBAR -Estimated by the pound or ton -Must know the size of steel bar needed -Must know linear feet needed -Bars.
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Leads Institute of Technology & Engineering
APPLICATIONS OF TECHNOLOGY
Do Now #7 What are the dimensions of the footing?
Residential Wall Systems
Multistory Office Building
FORMWORK DR. Nabil Dmaidi.
Objective 6.02 part 1: Recognize components of construction
Residential Wall Systems
Arch205 building construction wall systems- Steel
Outline Introduction Structural Redesign Gravity System
Concrete Structures DR. Nabil Dmaidi.
Residential Wall Systems
Residential Wall Systems
Construction Engineering Change Order - 2 Prof. Ralph V. Locurcio, PE
Construction Engineering Change Order - 2 Prof. Ralph V. Locurcio, PE
Presentation transcript:

HW#2 – RSMeans Estimating Prof. Ralph V. Locurcio, PE

Prob #1: Calculate the price to construct 100lf of forms in place for concrete footings. Footings are 4ft deep; two sides; use continuous plywood, 4 use. Use SFCA (square foot of contact area) for calculations. Do not include concrete or rebar. Show the price for materials & labor in separate columns and a total cost for the wall, including 10% overhead & profit (combined).

Prob # Forms in place, footings, continuous wall, plywood, 4 use Two forms are required Walls are 4ft deep x 100lf long = 400 SFCA per form 2 Forms required SFCA = 4' x 150' x 2 ea = 800SFCA SFCANA800$1.63$1,304.00$1.93$1,544.00$0.00 $3.56$2,848.00$3,132.80$5.10$4, $2, % ProbRS Means Item Item Description CalculationsUnitsSize Numb er Cost/Matl Labor / Labor Equip / EquipTotal/TotalBareTotal ValueYour UnitsUnitCostUnitCostUnitCost Unit (Bare) Barew/10%w/O&P 0 - 5pts Scor e

Prob #2: Calculate the price to construct 100lf of concrete block, bond beam. Use lightweight block, 6” thick Do not include concrete or rebar. Show the price for materials & labor in separate columns and a total cost for the wall, including 10% overhead & profit (combined).

Prob # Concrete block bond beam, not including grout or reinforcing, lightweight, 6" thick Bond beam is only the top course in the wall so you only need 1 row of blocks, pricing is per LF One row of blocks is required; 100lf long LFNA100$2.55$255.00$2.10$ $4.65$465.00$511.50$6.25$ $ % ProbRS Means Item Item Description CalculationsUnitsSize Numb er Cost/Matl Labor / Labor Equip / EquipTotal/TotalBareTotal ValueYour UnitsUnitCostUnitCostUnitCost Unit (Bare) Barew/10%w/O&P 0 - 5pts Scor e

Prob #3: Calculate the total cost for 16 structural steel columns, concrete filled, extra strong pipe 8” diameter. Each column is 34’ long. Columns are shop fabricated for 100ton; 2 story project; bolted connections. Show costs for materials, labor, equipment and a total cost for all the columns. Do not include a cost for overhead & profit.

Prob # Columns, structural, recycled materials; shop fab'd for 100-ton, 1-2 story project, bolted con, 8" diameter Provide 16 ea. columns; each 34lf long 16ea columns x 34lf long LF3416$65.50$35,632.00$1.60$870.40$1.47$799.68$68.57$37,302.08$41,032.29$76.50$41, $37, % ProbRS Means Item Item Description CalculationsUnitsSize Numb er Cost/Matl Labor / Labor Equip / EquipTotal/TotalBareTotal ValueYour UnitsUnitCostUnitCostUnitCost Unit (Bare) Barew/10%w/O&P 0 - 5pts Scor e

Prob #4: Calculate the total cost for 2” x 4” wall framing (studs). Wall is 150’ long x 8’ high. Use a pneumatic nail gun. Cost for the nail gun and nails are included in the RS Means prices. Show the individual costs for materials & labor and the total cost for the wall, including 10% overhead & profit.

Prob # Wood framing, 2 x 4 studs, 8' high wall Construct 150lf of 2x4 wall; use pneumatic nailer; cost for nail gun & nails are included in RSMeans cost. 150lf of 2x4 stud wall LF2x4x8150$0.33$49.50$0.41$61.50 $0.74$111.00$122.10$1.04$ $ %

Prob #5: Calculate the cost for asphalt roll roofing for a flat roof 100’ x 47’. Use asphalt, mineral surface roofing, 1 ply, #15 organic felt, 1 ply, mineral surfaced, selvage roofing, lap 19”, nailed and mopped. Roll roofing comes in standard 36” rolls Prices for nails & mopping are included. Prices are quoted per square = 100sf. Show the individual costs for materials, labor & equipment and the total cost for the wall, including 10% overhead & profit.

Prob # Asphalt roll roofing, 1 ply, #15 organic felt, mineral surfaced, selvage roofing, lap 19", nailed & mopped Provide asphalt roll roofing for flat roof 100lf x 47lf Roof area = 47' x 100' = 4700 sf / 100 = 47 squares SQ470047$60.50$2,843.50$54.50$2,561.50$15.15$712.05$130.15$6,117.05$6,728.76$182.00$8, $6, % Prob RS Means Item Item DescriptionCalculationsUnitsSize Numb er Cost/MatlLabor/LaborEquip/EquipTotal/TotalBareTotal Value You r UnitsUnitCostUnitCostUnitCost Unit (Bare) Barew/10%w/O&P 0 - 5pts Sco re

Prob #6: Calculate the cost to purchase and install 35 residential wood doors. Doors are Luan, solid core, 1 ¾” thick, 7’0” high and 3’4” wide. Show the individual costs for materials, labor & equipment and the total cost for the wall, including 10% overhead & profit.

Prob RS Means Item Item DescriptionCalculationsUnitsSize Numb er Cost/MatlLabor/LaborEquip/EquipTotal/TotalBareTotal Value You r UnitsUnitCostUnitCostUnitCost Unit (Bare) Barew/10%w/O&P 0 - 5pts Sco re Prob # Residential wood doors, Luan, solid core, 1 3/4" thick; 7'0" high; 34" wide Install 35 Luan solid wood doors 35 doors EA.7'0"35$207.00$7,245.00$33.50$1, $240.50$8,417.50$9,259.25$283.00$9, $8, % Total 130 % 100%

Construction Cost Engineering Name:Solution HW #1 Date: ProbRS Means ItemItem DescriptionCalculationsUnitsSize NumberCost/MatlLabor/LaborEquip/EquipTotal/TotalBare Total UnitsUnitCostUnitCostUnitCostUnit (Bare)Barew/10%w/O&P Prob # Forms in place, footings, continuous wall, plywood, 4 use Two forms are required Walls are 4ft deep x 100lf long = 400 SFCA per form 2 Forms required SFCA = 4' x 150' x 2 ea = 800SFCA SFCANA800$1.63$1,304.00$1.93$1,544.00$0.00 $3.56$2,848.00$3,132.80$5.10$4, $2, % Prob # Concrete block bond beam, not including grout or reinforcing, lightweight, 6" thick Bond beam is only the top course in the wall so you only need 1 row of blocks, pricing is per LF One row of blocks is required; 100lf long LFNA100$2.55$255.00$2.10$ $4.65$465.00$511.50$6.25$ $ % Prob # Columns, structural made from recycled materials; shop fab'd for 100-ton, 1-2 story project, bolted connections. 8" diameter Provide 16 ea. columns; each 34lf long 16ea columns x 34lf long LF3416$65.50$35,632.00$1.60$870.40$1.47$799.68$68.57$37,302.08$41,032.29$76.50$41, $37, % Prob # Wood framing, 2 x 4 studs, 8' high wall Construct 150lf of 2x4 wall; use pneumatic nailer; cost for nail gun & nails are included in RSMeans cost. 150lf of 2x4 studd wall LF2x4x8150$0.33$49.50$0.41$61.50 $0.74$111.00$122.10$1.04$ $ % Prob # Asphalt roll roofing, 1 ply, #15 organic felt, mineral surfaced, selvage roofing, lap 19", nailed & mopped Provide asphalt roll roofing for flat roof 100lf x 47lf Roof area = 47' x 100' = 4700 sf / 100 = 47 squares SQ470047$60.50$2,843.50$54.50$2,561.50$15.15$712.05$130.15$6,117.05$6,728.76$182.00$8, $6, % Prob # Residential wood doors, Luan, solid core, 1 3/4" thick; 7'0" high; 34" wide Install 35 Luan solid wood doors 35 doors EA.7'0"35$207.00$7,245.00$33.50$1, $240.50$8,417.50$9,259.25$283.00$9, $8, %