THE FOSTER GROUP TFGTFG City of Detroit Water and Sewerage Department Wholesale Customer Rates Meeting Sewage Disposal System Meeting #4 Preliminary Proposed.

Slides:



Advertisements
Similar presentations
Every student. every classroom. every day. February 13, 2008 Multi-Year Fiscal Sustainability Plan:
Advertisements

BITHLO COMMUNITY WATER Utilities Department Orange County Board of County Commissioners January 8, 2013.
PG&E’s Proposed Bankruptcy Settlement Excess Costs and Savings Potential with DRC Bond Issuance The Utility Reform Network September 3, 2003.
PROPOSITION 218 IMPACTS ON UTILITY USER FEES Case Study City of Dixon Sewer Rate Repeal of 2007.
City of South Burlington City Council Adopted January 12, 2013 FY 2014 Budget - Keys to Financial Success Prepared by Sandy Miller, City Manager and Bob.
City of Farmersville, Texas Water and Wastewater Rate Study February 2011.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
Public Hearing FY 2011 Budget 1. City Council Goals FY 2011 Flood Recovery and Protection –Identify Funding and Sources for Flood –Restore Affordable.
1 RATE SETTING WORKSHOP February 23, RATE CHANGES In accordance with Section of the Charter Plan of the District, any proposed rate change.
Revised FY 2007 & Proposed FY 2008 Operating & Capital Budgets Retail Rates Committee January 4, 2007.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Chapter 3 Cash Flow and Financial Planning. Copyright © 2006 Pearson Addison-Wesley. All rights reserved. 3-2 Analyzing the Firm’s Cash Flows Cash flow.
1 Combined Utility System Cost of Service Rate Study Presentation April 6, 2010.
City Of Phoenix Water Rates June 30, 2011 Denise Olson Deputy Finance Director Finance Department.
Doug Brown October 23, Budget Overview A Budget Planning Process (Overland Park’s) Financial Management.
BOARD OF EDUCATION Finance Presentation Thursday, February 9, 2012.
FULTON CITY SCHOOL DISTRICT DRAFT BUDGET.
2014 Budget Department Presentations Infrastructure Funding Options.
BITHLO COMMUNITY WATER Utilities Department Orange County Board of County Commissioners December 18, 2012.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Determining and Setting Public Utility Rates Bill Wilks, Senior Project Manager November 19, 2014 AGFOA Fall Conference.
Wilderness Rim Association Water Rate and Reserve Study Board Meeting April 23, 2014 Presented By: Chris Gonzalez, Project Manager.
Govt. Reporting - 1 GOVERNMENTAL REPORTING City Council Budgetary Hearing.
Procurement Strategies Management Buying Smarter: Strategies to Raise the State Buying Power Normand Masse Director General Services and Technology Acquisition.
Independent Review of FY 2008 Proposed Rates D.C. Water and Sewer Authority Public Hearing June 13, 2007.
Department of Water and Power City of Los Angeles Energy Cost Adjustment Factor Modification August 2009 MODIFIED PROPOSAL WILL BE SUBMITTED ON DECEMBER.
THE FOSTER GROUP TFGTFG Detroit Water & Sewerage Department Capital Improvement Program Statistics – Sewage Disposal System.
FY2008 Service Center Billing Rate Proposal Training Dates:Monday, February 26, 2007 Friday, March 2, 2007 Presented by: Rick Keller, Director – Cost Accounting.
Finance Committee Meeting Water Rate Study Update Habib Isaac – Principal Gregg Tobler – Task Manager August 13, 2012.
APPA’s Financial Planning for Municipals Mark Beauchamp, CPA, CMA, MBA September 27, 2005 Business & Finance Workshop.
Cost of Service Based Water and Wastewater Rates City of Lawrence, Kansas February 11, 2004 J. Rowe McKinley Keith D. Barber.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASIBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
THE FOSTER GROUP TFGTFG City of Detroit Water and Sewerage Department Wholesale Customer Rates Meeting Sewage Disposal System Meeting #2 – Projected FY.
THE FOSTER GROUP TFGTFG City of Detroit Water and Sewerage Department Wholesale Customer Rates Meeting Water Supply System Meeting #3 – Allocated FY
Quarterly Performance Report For the period October – December 2014.
Village of Almont WATER, SEWER, AND SSO RATES 2012 – 2013 FISCAL YEAR.
City of Alexandria, Virginia Sanitary Sewer Master Plan February 23, 2013 City Council Public Hearing.
Presentation to Board June 17, 2008 Presented by: J. A. Sabo, Associate Director – Leading Services & Treasurer of the Board BUDGET York Catholic.
2016 Water and Wastewater Rates Committee of the Whole November 16, 2015 Presenter: Mike Mayes – Director, Financial Services/Treasurer.
Pasadena Water and Power Public Hearing Date Water Capital Improvement Charge Pasadena City Council Meeting November 16, 2015 Agenda Item #13.
1 Service Center FY2006 Billing Rate Proposal Preparation.
Commission Meeting November 18, 2015 WSSC Customer Use and Pricing.
THE FOSTER GROUP TFGTFG GLWA Capital Improvement Program Summary and Financing Observations January 26, 2016.
Pasadena Water and Power Public Hearing Water Capital Improvement Charge Pasadena City Council Meeting January 11, 2016 Item #12.
Potential Consolidation of WMWD’s Murrieta Division into EMWD April 15, 2015 Paul D. Jones II, P.E. General Manager, Eastern Municipal Water District
City of Palo Alto Utility Rate Changes FY 2013 Facility Managers’ Meeting August 16, 2012 Ipek Connolly, Senior Resource Planner.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
Water and Wastewater Rates Public Hearing July 15, 2015 The Reed Group, Inc. 1.
FY 2016 Water & Sewer Rates Presented by: The Department of Public Works Works.
1 City of Cocoa Michael Burton - President Andrew Burnham - Sr. Vice President Eric Grau - Project Consultant Presented by: Water, Sewer & Reclaimed Water.
Water Rate Presentation City Council Meeting December 14, 2010.
FY 2016 Budget Discussion Prior to Proposed Budget Submittal July 23 rd,2015.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
1 City of Cocoa Michael Burton - President Andrew Burnham - Senior Vice President Ashley Venturoni – Project Consultant Presented by: FY 2013 Water, &
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
Pasco County “Budget 101” OFFICE OF MANAGEMENT & BUDGET.
May 31, 2016 WATER & SEWER RATE STUDY PRESENTATION 5/9/2016 City of Greenfield, California.
Current Water Rates $26.66 per month readiness to serve fee (billed on a quarterly basis at $80.00) 5.14 per 1,000 gallons of water used The City of Flushing.
SEWER SERVICE FEE RATE STRUCTURE ALTERNATIVE
Final Rate Study Findings
City of Sisters, OR 2017 Water & Sewer Rate Study
FY Proposed Budget and Rates
Joshua Basin Water District Draft Findings & Rate Scenarios
Comprehensive Rate Study & Cost Allocation Analysis
Comprehensive Rate Study & Cost Allocation Analysis
Joshua Basin Water District Revised Rate Recommendations
Information Technology
Water & Sewer Rate Study Presented by: Chris Gonzalez, Project Manager
Mark Beauchamp Utility Financial Solutions, LLC
Presentation transcript:

THE FOSTER GROUP TFGTFG City of Detroit Water and Sewerage Department Wholesale Customer Rates Meeting Sewage Disposal System Meeting #4 Preliminary Proposed FY Sewer Rates January 21, 2010

THE FOSTER GROUP TFGTFG 1/21/10 Customer Rate Season Schedule This is the third of a series of meetings This is the third of a series of meetings 10/13 –Capital Improvement Program Presentation 10/13 –Capital Improvement Program Presentation 11/19 – Units of Service, Preliminary SYSTEM Revenue Levels 11/19 – Units of Service, Preliminary SYSTEM Revenue Levels 12/17 – Preliminary Cost Allocations to Customers 12/17 – Preliminary Cost Allocations to Customers 1/21/2010 – Preliminary Individual Rate Proposals 1/21/2010 – Preliminary Individual Rate Proposals 2/24/2010 – BOWC Public Hearing 2/24/2010 – BOWC Public Hearing 3/ /2010 – City Council Public Hearing 3/ /2010 – City Council Public Hearing 7/1/2010 – Effective Date for Rates 7/1/2010 – Effective Date for Rates Parallel meetings of Partnership Work Groups Parallel meetings of Partnership Work Groups Page 2

THE FOSTER GROUP TFGTFG 1/21/10 Information Portals DWSD web site DWSD web site Customer Information / “Wholesale Customers Season Rate Schedule” Customer Information / “Wholesale Customers Season Rate Schedule” DWSD Customer Outreach Portal DWSD Customer Outreach Portal For information contact Teresa Newman For information contact Teresa Newman Page 3

THE FOSTER GROUP TFGTFG 1/21/10 Today’s Agenda Rollout Presentation Rollout Presentation Updated Preliminary Revenue Requirements (And System Revenue) for FY Updated Preliminary Revenue Requirements (And System Revenue) for FY Updated Units of Service and Cost of of Service Allocations to Customers Updated Units of Service and Cost of of Service Allocations to Customers Presentation of Preliminary Proposed Rates to Customers Presentation of Preliminary Proposed Rates to Customers Illustration of Rate Calculation Illustration of Rate Calculation Sewer Rates Work Group Sewer Rates Work Group Detailed Discussions on Rate Issues Detailed Discussions on Rate Issues Page 4

THE FOSTER GROUP TFGTFG 1/21/10 The 3 Fundamental Steps in the Sewer Rate Methodology Revenue Requirement Projections Revenue Requirement Projections How Much Money is Needed? How Much Money is Needed? Cost of Service Analysis Cost of Service Analysis From Whom Should the Money be Collected? From Whom Should the Money be Collected? Design of Recommended Rates Design of Recommended Rates How Should DWSD Services be Priced? How Should DWSD Services be Priced? Page 5

THE FOSTER GROUP TFGTFG Timeout for Some Perspective...

THE FOSTER GROUP TFGTFG 1/21/10 DWSD Sewer Rate Changes ( ) Avg =3.0% Avg =6.5% Avg =3.2% Avg =6.4% Page 7

THE FOSTER GROUP TFGTFG 1/21/10 Annual Capital Improvement Investments Sewage Disposal System – ($ millions) Page 8

THE FOSTER GROUP TFGTFG 1/21/10 Compliance with Wastewater Treatment Standards - A Very Possible Potential Reality Sanitary CSO Stormwater Page 9

THE FOSTER GROUP TFGTFG 1/21/10 Funding Wastewater Infrastructure: A Historical Perspective Citizen Goals Federal Representative Communities State Agency EPA Utility Page 10

THE FOSTER GROUP TFGTFG Water Industry (AWWA) Perspective on Financing Infrastructure Primary focus has always been local, and should remain so Primary focus has always been local, and should remain so Aging infrastructure is an issue in the US, but it is not at a crisis, and it is not all “crumbling” Aging infrastructure is an issue in the US, but it is not at a crisis, and it is not all “crumbling” There is a role for the federal government in lowering cost of capital and in special circumstances, but water infrastructure challenges are not primarily federal problems There is a role for the federal government in lowering cost of capital and in special circumstances, but water infrastructure challenges are not primarily federal problems 1/21/10 Page 11

THE FOSTER GROUP TFGTFG Water Industry (AWWA) Perspective on Financing Infrastructure Water trust fund is not the most effective option Water trust fund is not the most effective option Overhead costs of sending money to Washington rather than retaining it locally Overhead costs of sending money to Washington rather than retaining it locally Encouragement of delay in establishing true cost rates while local officials wait for trust fund assistance Encouragement of delay in establishing true cost rates while local officials wait for trust fund assistance Congress’ history of not spending revenues on purpose for which they were collected Congress’ history of not spending revenues on purpose for which they were collected 1/21/10 Page 12

THE FOSTER GROUP TFGTFG Water Industry (AWWA) Perspective on Financing Infrastructure More effective financing tools include: More effective financing tools include: Enhancement of existing SRF programs Enhancement of existing SRF programs Removal of annual volume caps for private activity bonds Removal of annual volume caps for private activity bonds Full cost pricing for water service Full cost pricing for water service Creation of federal water infrastructure bank Creation of federal water infrastructure bank AWWA opposes national water tax AWWA opposes national water tax Inefficient, regressive, inequitable and punishes communities that have responsibly addressed local concerns Inefficient, regressive, inequitable and punishes communities that have responsibly addressed local concerns 1/21/10 Page 13

THE FOSTER GROUP TFGTFG FY Sewage Disposal System Revenue Requirement Update

THE FOSTER GROUP TFGTFG 1/21/10 Updated Sewage Disposal System FY Revenue Requirements Projected Revenues have been decreased Projected Revenues have been decreased DWSD’s intention is to begin billing OMI District for Flows measured at single meter upstream of Northeast Pump Station DWSD’s intention is to begin billing OMI District for Flows measured at single meter upstream of Northeast Pump Station Initial technical data had indicated additional flow would accrue Initial technical data had indicated additional flow would accrue Technical data needs additional review Technical data needs additional review At Sewer Rates Work Group’s request, FY Sewer Rates will not anticipate the increase pending further review At Sewer Rates Work Group’s request, FY Sewer Rates will not anticipate the increase pending further review Page 15

THE FOSTER GROUP TFGTFG 1/21/10 Updated Sewage Disposal System FY Revenue Requirements Budgeted operating expenses in financial plan for rates reduced by 2% Budgeted operating expenses in financial plan for rates reduced by 2% Reflects Management’s expectations regarding outcomes of strategic process Reflects Management’s expectations regarding outcomes of strategic process Reflects desire to offset negative rate consequences of revenue reduction noted above Reflects desire to offset negative rate consequences of revenue reduction noted above Debt Service Coverage mildly reduced Debt Service Coverage mildly reduced Reflects fact that some implementation of FY and FY Look-Back will count as FY revenue Reflects fact that some implementation of FY and FY Look-Back will count as FY revenue Page 16

THE FOSTER GROUP TFGTFG FY Budget Target – Combined Water & Sewer 1/21/10 Page 17

THE FOSTER GROUP TFGTFG 1/21/10 Page 18 Sewage Disposal System Preliminary Revenue Level – December Projection

THE FOSTER GROUP TFGTFG 1/21/10 Page 19 Sewage Disposal System Preliminary Revenue Level – Proposed Projection

THE FOSTER GROUP TFGTFG 1/21/10 Preliminary Sewer Rate Level – Increase Drivers Page 20

THE FOSTER GROUP TFGTFG Updated Allocation of FY Sewage Disposal System Revenue Requirements to Customers

THE FOSTER GROUP TFGTFG 1/21/10 Updated Revenue Requirements to Customers As discussed at prior meetings, two methodology modifications are being proposed As discussed at prior meetings, two methodology modifications are being proposed Flow Balance Issues Flow Balance Issues Alternative flow allocation approach? YES Alternative flow allocation approach? YES Reflect any changes to overflow %’s? NO Reflect any changes to overflow %’s? NO What about I/I strength vs. sanitary strength? NO What about I/I strength vs. sanitary strength? NO Utility Basis YES Utility Basis YES Facilitated by OMI Transfer Facilitated by OMI Transfer Ties capital allocations to more reliable data Ties capital allocations to more reliable data Results in minor (+/- 2%) cost shift Results in minor (+/- 2%) cost shift Page 22

THE FOSTER GROUP TFGTFG 1/21/10 Wet Weather Inflow Calculations Suggested WWWG Changes Deduct Dry Weather Flow from Total Annual Flow to Determine Wet Weather Volume Deduct Dry Weather Flow from Total Annual Flow to Determine Wet Weather Volume Compute Inferred “Delivery Coefficient” Compute Inferred “Delivery Coefficient” Recalculate Overflow Credit Factor(s)? Recalculate Overflow Credit Factor(s)? Estimating Techniques for System Meter Customers? Estimating Techniques for System Meter Customers? Understand/Reflect Differential Flow Quality Issues? Understand/Reflect Differential Flow Quality Issues? Page 23

THE FOSTER GROUP TFGTFG 1/21/10 Utility Basis for FY Sewer Rates Benefits include: Benefits include: More reliable and stable source for capital cost allocation More reliable and stable source for capital cost allocation Better “generational equity” alignment with cost recovery and use of assets over their useful life Better “generational equity” alignment with cost recovery and use of assets over their useful life Per 1978 Rate Settlement Agreement, no differential in rate of return between Detroit and Suburban customers Per 1978 Rate Settlement Agreement, no differential in rate of return between Detroit and Suburban customers Reflects detailed review of DWSD’s Fixed Asset records Reflects detailed review of DWSD’s Fixed Asset records Page 24

THE FOSTER GROUP TFGTFG 1/21/10 Sample Capital Cost Recovery for DWSD Infrastructure Investment * Includes principal, interest, and debt service coverage ** Includes depreciation expense and return on rate base Page 25

THE FOSTER GROUP TFGTFG 1/21/10 Conversion of FY Revenue Req’ts to Utility Basis – ($millions) Page 26

THE FOSTER GROUP TFGTFG Preliminary Proposed FY Sewer Rates

THE FOSTER GROUP TFGTFG 1/21/10 Proposed Rates for FY Minor Rate Calculation Change Vetted by Sewer Rates Work Group Vetted by Sewer Rates Work Group Fixed Monthly Charge component includes recovery of “Wholesale Only” costs related with: Fixed Monthly Charge component includes recovery of “Wholesale Only” costs related with: Master Meters Master Meters Customer Outreach Support Customer Outreach Support Previously collected through commodity element Previously collected through commodity element Results in lower commodity rates, higher fixed monthly charges Results in lower commodity rates, higher fixed monthly charges Page 28

THE FOSTER GROUP TFGTFG 1/21/10 Next Steps Rates will become “proposed” when submitted to Board of Water Commissioners Rates will become “proposed” when submitted to Board of Water Commissioners Formal notification will be mailed Formal notification will be mailed Ongoing review of all revenue requirement, cost of service allocation, and rate design calculations Ongoing review of all revenue requirement, cost of service allocation, and rate design calculations Next meetings Next meetings Immediately following – Sewer Rates Work Group Immediately following – Sewer Rates Work Group February 24, 2010 – Board of Water Commissioners Public Hearing on Proposed FY Water Rates February 24, 2010 – Board of Water Commissioners Public Hearing on Proposed FY Water Rates Page 29

THE FOSTER GROUP TFGTFG 1/21/10 Takeaways DWSD announces a reduced preliminary estimate of Overall SYSTEM Revenue Increase from 7.4% to 6.8% DWSD announces a reduced preliminary estimate of Overall SYSTEM Revenue Increase from 7.4% to 6.8% DWSD has presented preliminary proposed rates for FY DWSD has presented preliminary proposed rates for FY Proposed rates remain under review Proposed rates remain under review Page 30

THE FOSTER GROUP TFGTFG Sample Sewer Rate Calculation

THE FOSTER GROUP TFGTFG 1/21/10 Wastewater Volume Wastewater Volume Sanitary Sanitary Dry Weather Infiltration/Inflow Dry Weather Infiltration/Inflow Wet Weather Flows Wet Weather Flows  Uniform Overflow Credit Wastewater Strength Wastewater Strength Industrial Surcharge Customers Industrial Surcharge Customers All Other “Domestic” All Other “Domestic” Detroit CSO Facilities Detroit CSO Facilities 83% Detroit 83% Detroit 17% Suburban 17% Suburban  Detailed Allocation Determine Units of Service Page 32

THE FOSTER GROUP TFGTFG 1/21/10 Allocate Costs to Functions Wastewater Volume (Domestic Strength) Industrial Specific CSO Collection System Specific Page 33

THE FOSTER GROUP TFGTFG 1/21/10 Determine Unit Costs of Service Determine Unit Costs of Service Divide Functional Costs by Units of Service Divide Functional Costs by Units of Service Apply Uniform Unit Costs of Service to Customer Specific Units of Service Apply Uniform Unit Costs of Service to Customer Specific Units of Service Allocate Costs to Customers Page 34

THE FOSTER GROUP TFGTFG 1/21/10 Recognize Settlement Agreement Adjustments Page 35

THE FOSTER GROUP TFGTFG 1/21/10 Commodity Charge Commodity Charge Recovers Costs Associated With: Recovers Costs Associated With:  Sanitary Volume  Dry Weather Infiltration/Inflow Fixed Monthly Charge Fixed Monthly Charge Recovers Costs Associated With: Recovers Costs Associated With:  Wet Weather Flow  Customer Specific Costs  Detroit CSO Program  Wholesale Only Costs Calculate Rates Page 36