Penrice – CCG Meeting Overburden Options OptionImpactEffectComment 1. Stop removing schist and low grade limestone Will stop extraction of high grade limestone.

Slides:



Advertisements
Similar presentations
Iron and Taconite Mining in MN
Advertisements

Sustainable Landscapes Using Waste Sustainably Michael D. Pavelek II Greater Lebanon Refuse Authority.
BCC Public Hearing Concrete & Asphalt Plants Ordinance ZONING DIVISION December 2, 2014.
© 2005 David M. Abbott, Jr. Beryllium Deposits or Beryllium Ore? An Important Distinction for Financing David M. Abbott, Jr. Behre Dolbear & Company, Inc.
Geology and Nonrenewable Mineral Resources G. Tyler Miller’s Living in the Environment 14 th Edition Chapter 16 G. Tyler Miller’s Living in the Environment.
MINING. Overview StepsDescriptionEnvironmental Effects MiningRemoving mineral resources from the ground Mine wastes – acids and toxins Displacement of.
Geologic Resources: Nonrenewable Mineral and Energy Resources
0 CCG Meeting Angaston 3 rd December Penrice CCG Meeting Action Arising BLAST MONITORING Chris Linke Monitor Site Blast Data 21/11/09 60 holes located.
Jeopardy Final JeopardyFinal Jeopardy 200 pt 300 pt 400 pt 500 pt 100 pt 200 pt 300 pt 400 pt 500 pt 100 pt 200 pt 300 pt 400 pt 500 pt 100 pt 200 pt.
 Learning Goal: I can identify important materials mined by Canadians; I can differentiate between common mining types.
ENVIRONMENTAL MANAGEMENT. BE: Civil & Environmental Engineering: Ireland & France MSc: Environmental Management: Imperial College Experience: Certified.
0 CCG Meeting Angaston 1 st April Mine Operation Update Eastern area  Shaping and topsoil addition continuing  Preparation for planting of trees.
Introduction to aquifers and related ideas.
Copyright © 2014 All rights reserved, Government of Newfoundland and Labrador Earth Systems 3209 Unit: 5 Earth’s Resources Reference: Chapters 21; Appendix.
Mining Industry Investigation By: Katie Marquis 8E.
By: Jose, Marlon and Trevone. Mining is important for many reasons: - Canada is third in the world for mineral production. - Canada doesn’t have a use.
North Eastham Wind Feasibility Study Results Brian Eastman Eastham Energy Committee Kristen Burke Massachusetts Technology Collaborative Ric O’Connell.
TERRAMIN AUSTRALIA Limited Angas Zinc Project. The Angas Zinc Project: noise Noise issue is a “work in progress” –Final noise outcomes and decisions awaiting.
NATIONAL WATER RESOURCE STRATEGY SOUTH AFRICA’S WATER SITUATION AND STRATEGIES TO BALANCE SUPPLY AND DEMAND INKOMATI WMA.
Tailings and Waste Rock Management Alternatives Study
Mining And its environmental impact. What determines the type of mining? Underground v.s. Surface Mining v.s. Solution Underground v.s. Surface Mining.
Reclaiming Surface Mines ©2007 Dr. B. C. Paul. Mines That Can Be Concurrently Reclaimed  Area Strip Mines and Most Contour Strip Mines can be reclaimed.
Geology and Nonrenewable Mineral Resources G. Tyler Miller’s Living in the Environment Chapter 14 G. Tyler Miller’s Living in the Environment Chapter 14.
 Mining Processes 10/19/11. Review of Geology Terms  Geology and Geologic processes  Catastrophic events: Volcanoes, Earthquakes,Tsunamis  Plate Tectonics.
 Kalgoolie, Australia  Salt Evaporation Ponds.
1 Short Term MPL – Western Area PCCG Meeting 3 rd December 2008.
Christopia. What kind of city do you have?  Location On the waterfront Plenty of flat land Good surround land  Industrial Did not worry about pollution.
1 South Australian Mining Act requirements for Angaston Quarry 5 th November 2008.
Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916)
  Strip Mining  Open Pit Mining  Underground Mining Three Types.
Minerals as Non-Renewable Resources in BC
HANCOCK PROSPECTING Hope Downs Iron Ore Project The Current Status 7 th Annual Global Iron Ore & Steel Forecast Conference Perth, 2004 Russell Tipper –
Materials Management, Rogers, AR Overview Name:Curt Tempel Date:May 2012.
Mineral Resources. Nonrenewable Mineral Resources Earth crust = Minerals + rock Minerals –inorganic compound that occurs naturally in the earth’s crust.
Planning & Community Development Department Zoning Code Amendment Public Hearing Proposed elimination of the 50% review step from the design review process.
Mineral Exploration Tel: (07) Fax: (07)
Mineral Mining. Take a ride inside a mine video – Warm Up Video.
How we get our minerals and rocks
Bulgarian Geology and Mining Ministry of Environment and Water.
Mineral Exploration and Development
Mining. It’s a mineral if it… Is naturally occurring Is an inorganic compound Has specific physical and chemical properties (melting point, density, hardness)
Earth’s Changing Environment Lecture 9 Fossil Fuel Extraction: Environmental Impacts.
Senior Design 2009 Projects Overview. General Format Week Day 1 – Outline Work to Be Accomplished During the Week Week Day 2 – Work Day / Special Lecture.
Textbook pages 226 – 230 Friday, November 20th, 2015
Geologic Resources: Nonrenewable Mineral and Energy Resources Chapter 15 “Mineral resources are the building blocks on which modern society depends.
Problems in the Mining Industry. Environmental Impact  Air and Water Pollution  Emissions from the mining, smelting and transportation of minerals results.
Mining in Canada.
MINING. Example: Coal Example: Gold Ore Example: Iron Ore (steel!)
Engineering a water tower
Chapter 27 Minerals and the Environment. Mining Removal of minerals & fossil fuels from the Earth’s crust.
Geology and Nonrenewable Mineral Resources. Key Concepts  Major geologic processes  Minerals, rocks, and the rock cycle  Earthquakes and volcanoes.
Entrepreneurship CHAPTER 9 SECTION 2.  Once you have a site now you are ready to plan the layout.  Layout – floor plan or map that shows the arrangement.
Lead Pipe Disposal. Overview Background and Project Requirements Top 5 Designs Detailed Final Design Social and Environmental Factors Testing of Design.
WEST VIRGINIA INDUSTRIAL ACCESS ROAD PROGRAM West Virginia Economic Development Council January 27, 2016.
LAB PROTOCOL – all personal items aside keep a writing implement get your journal.
1 EASTERN MUNICIPAL WATER DISTRICT Proposed Revisions to the Administrative Code Elizabeth Lovsted, PE Sr. Civil Engineer July 8, 2015.
July 4, 2017 AURORA UNITED CHURCH + SOUTHBOUND DEVELOPMENT LTD Yonge Street, 55&57/57A Temperance Street, 12&16 Tyler Street General Committee Meeting.
Consequences of Human Activities
Jeopardy Final Jeopardy
Redevelopment Authority of the County of Washington O
ROCK - A NATURALLY FORMED COLLECTION OF DIFFERENT MINERALS MINERAL
Affordable Energy Production from Renewable Fuel
Mining Wastes Wilbert Aureo.
Unconventional Fossil Fuels
Mining.
Mining.
APES 1/9 Get a computer.
CHAPTER 3 SUPPLY AND DEMAND: AN INITIAL LOOK
Advanced Placement Environmental Science
Land Resources.
Presentation transcript:

Penrice – CCG Meeting Overburden Options OptionImpactEffectComment 1. Stop removing schist and low grade limestone Will stop extraction of high grade limestone Stop supply to PSP/customers & all glass plants (OI/ABC/Amcor) Cease most operations at mine

Penrice – CCG Meeting Overburden Options OptionImpactEffectComment 2. Remove schist off site/sell as land fill & continue to sell low grade limestone to civil applications Reduce storage space demand on site Smaller overburden mounds Not economically viable due to transport cost No approved site Land fill subject to government contract

Penrice – CCG Meeting Overburden Options OptionImpactEffectComment 3. Store schist where low grade limestone is held in inventory (eastern mound) for crushing into civil products Space available only after crushing & sale – limited space. Sterilise inventory Insufficient space Reduced high grade limestone extraction Write off inventory

Penrice – CCG Meeting Overburden Options OptionImpactEffectComment 4. Store schist on top of eastern mound Limited to 50 – 100k mt to RL 432 Insufficient space Visual impact Wardens court restrictions Currently rounding off final form to top Community concern with height

Penrice – CCG Meeting Overburden Options OptionImpactEffectComment 5. Complete partial pit final form stage at south or north end & place schist in pit Sterilise ore reserves Operations restricted due to ability to store water in pit between north & south Further development of ore reserves not possible Cannot be done until PC1 (crusher) is relocated 2+ years

Penrice – CCG Meeting Overburden Options OptionImpactEffectComment 6. Underground mining of high grade ore body Limits overburden removal Time restricted – 24 months planning & implementation Stop supply to PSP/Customers Not economical No expertise Not worked up as serious option

Penrice – CCG Meeting OptionImpactEffectComment 7. Place schist on Gerlach western land Provides overburden space to continue operations Environmental impacts Overburden Options