World Bank Annual Meeting Policy Forum – October 10 th, 2013 Environmental and Social Assessment and Management: Strengthening all levels of the Integrated.

Slides:



Advertisements
Similar presentations
WCDR Thematic Panel Governance: Institutional and Policy Frameworks for Risk Reduction Annotated Outline UNDP – UNV – ProVention Consortium – UN-Habitat.
Advertisements

Wild Salmon Policy Update Yukon River Panel March 23, 2011.
Linking Science & Policy 1: Supporting Decision Making and National Communications with Assessments Chairs: Anand Patwardhan and Ian Burton Reporter: Yongyuan.
1 Capacity Development for Water and Food Security Dr. Jens Liebe UN-Water Decade Programme on Capacity Development (UNW-DPC) GEOSS S+T Stakeholder Workshop.
AN INTRODUCTION TO STRATEGIC ENVIRONMENTAL ASSESSMENT
Capacity Enhancement for Air Quality Management John E. Hay Senior Advisor UNEP ROAP & IETC.
Identify Problems, Planning Objectives and Constraints
Opportunities for RAC Participation. Three Part discussion General presentation; Example of oil and gas decision making; and Panel Discussion of RAC involvement.
Building the Foundations for Better Health Health Services Organization.
Enhancing the Climate Resilience of Africa’s Infrastructure ACPC Role.
PAINTING THE FULL PICTURE
Feed the Future Innovation Lab for Small-Scale Irrigation Alan Duncan Ethiopia Partner meeting, Mar From Plan to Action Field Studies and Ex Ante.
Adaptation to Climate Change
Strengthening General Aviation Security November 2011.
Valuing Nature Campaigns. Communicating the benefits of Mexico’s protected areas Studied the goods and services provided by the country’s protected areas.
Experience/Lessons Sharing of Environmental Initiatives of Hydropower Development in Laos By: Dr. Phouvin Phousavanh Faculty of Agriculture National University.
Introduction A GENERAL OVERVIEW OF THE WCD FINDINGS, RECOMMENDATIONS & APPLICATION Alex Muhweezi & Chihenyo Mvoyi IUCN Uganda Country Office.
WLE and the INTEGRATING ECOSYSTEM SOLUTIONS INTO POLICY and INVESTMENTS (IES) FLAGSHIP Nathanial Matthews Global Research Coordinator IES Flagship Leader.
China Europa Forum, Hong Kong, July 2010 Healthy Rivers and the Implementation of Sustainable Water Resources Management G. SYLAIOS 1, J. GUO 2, M. HATZIAPOSTOLIDIS.
Risks from/to Ok Teddy project Definition of Risks probability that a substance or situation will produce harm under specified conditions a combination.
AN INTEGRATED ASSESSENT OF IMPACTS, ADAPTATION AND VULNERABILITY IN WATERSHED AREAS AND COMMUNITIES IN SOUTHEAST ASIA Juan M. Pulhin Ekawati S. Wahyuni.
Adaptation knowledge needs and response under the UNFCCC process Adaptation Knowledge Day V Session 1: Knowledge Gaps Bonn, Germany 09 June 2014 Rojina.
1 February 2005 Briefing Sessions Draft Regulations Using Water for Recreational Purposes.
The EU Water Initiative National Policy Dialogues in Armenia & Moldova Pierre Hecq UNDP Water-CoP Meeting Almaty, October 2007.
VPA Impact Monitoring. an “evidence-based policy cycle” reiterative/adjustable to steer by based on reality checks to show if implementation leads to.
Environmental Management System Definitions
“Strategic technical assistance to improve the effectiveness of African EIA systems” Mark Stoughton, Ph.D. UNECA–CLEAA Experts’ Workshop 12 & 13 April.
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
Lessons learned and benefits of multi-stakeholder food security and nutrition governance Deborah Fulton Secretary, CFS.
2006 Socio-economic component CUMBERLAND RESOURCES LTD.  Baseline  Impact Assessment  Mitigation and Benefit Enhancement  Monitoring  Intervener Comments.
The China Biodiversity Partnership And Framework for Action (CBPF) A Programmatic Approach for Biodiversity Conservation.
Christopher Sheldon Senior Mining Specialist Mining Policy Division The World Bank Group Integrating Local Economic Development into World Bank Mining.
PP 4.1: IWRM Planning Framework. 2 Module Objective and Scope Participants acquire knowledge of the Principles of Good Basin Planning and can apply the.
1 BULGARIA PUBLIC- PRIVATE PARNERSHIP FOR REMEDIATION OF HISTORICAL POLLUTION Dr. Vania Grigorova Ministry of Environment and Water Bulgaria Managing for.
Presented by: Steve Litke, Fraser Basin Council Winnipeg, Manitoba June 18, 2012 Collaborative Approaches to Watershed Governance – Lessons from BC.
Environmental Management Plan (EMP) Required for: Full EIA based on Palestinian EIA Policy Category A projects based on World Bank Policy.
[Country] Poverty-Environment Initiative Economics Assessment/Valuation of Environment and Natural Resources Country Experience Presented to the PEI Africa.
Division of Technology, Industry, and Economics Economics and Trade Branch SESSION 7 - How to do Integrated Assessment Stage D: Issuing policy recommendations.
INTEGRATED ASSESSMENT AND PLANNING FOR SUSTAINABLE DEVELOPMENT 1 Click to edit Master title style 1 Evaluation and Review of Experience from UNEP Projects.
Lesson 4 ODOT Best Practices. Best Practices Our Challenge: Best Practices for Action-Focused and Resource-Focused analyses are distinct Distinct best.
UNFCCC WORKSHOP ON METHODOLOGIES ON CLIMATE CHANGE IMPACT AND ADAPTATION back-to-back with UNDP-GEF WORKSHOP FOR DEVELOPING AN ADAPTATION POLICY FRAMEWORK.
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
The World Bank’s Experience with Country Environmental Analysis (CEA) Sub-Regional Workshop for GEF Focal Points Europe and the CIS 7-8 March 2007, Istanbul.
Roadmap & Actions Expert Consultation Health in All Policies.
WATER MANAGEMENT STRATEGY AND OPTIONS IDENTIFIED.
URBAN STREAM REHABILITATION. The URBEM Framework.
Findings From the National Preparations For Rio + 20 for Select Developing Countries A UNDESA/UNDP partnership International Workshop on Strengthening.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
Cooperation and synergies for better environment – efforts by CAREC EU-Central Asia high-level conference on environment and water 13/14 February 2013.
Sustainable Community EMS Design Including Pollution Prevention Michelle M. Wyman Reed Smith Shaw & McClay LLP EMS Models and Strategies: ISO & Beyond.
Deerin Babb-Brott, Director National Ocean Council Office National Boating Federation 2013 Annual Meeting.
Division of Technology, Industry, and Economics Economics and Trade Branch Integrated Assessment of Trade- Related Policies and Biological Diversity in.
Mekong River Commission Information System/ “WUP-FIN Phase III” Concept The information system development is critical activity for maintaining the MRCS.
Mekong River Basin Transboundary Waters Management: Innovative Tools for Collaborative Decision-making World Water Forum March 21, 2009.
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N.
TRAP 5 th interregional meeting & Site Visits Limerick & Lough Derg, Ireland 9 th October 2013 CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional.
Environmental and Social Analysis in World Bank Projects Challenges to implementing more strategic approaches Glenn Morgan Regional Safeguards Advisor,
Strategy Note on Economic Cooperation for Mekong Subregion The World Bank’s contribution to the GMS Water Resources Management March 2007.
Institutional Strengthening Support
Cumulative Effects Assessment and Marine Spatial Planning
CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional Authority
Extractive Industries and Water Governance in the Nile Basin, now and in 2030: Lessons from Upstream around Lake Victoria in Tanzania   Donald Kasongi,
LGAC Input on Outcomes.
DG Environment, Nature Protection Unit (D3)
SYDNEY, AUSTRALIA | October 2018
Strategic Environmental Assessment (SEA)
Assessment of EIA regime
Natural water Retention Measures
A Blueprint to safeguard Europe’s Water Resources
Lessons learned from REDD+ readiness processes
Presentation transcript:

World Bank Annual Meeting Policy Forum – October 10 th, 2013 Environmental and Social Assessment and Management: Strengthening all levels of the Integrated Framework Cumulative Impact Assessment: Making it work: challenges and options Emmanuel Boulet Principal Environment Specialist Inter-American Development Bank

Assessment methodologies are well established… General consensus on needs and definition Address “blind spots” of the project-focused ESIA process Definition e.g. “changes to the environment that are caused by an action in combination with other past, present and future actions”(Hegman et al.) Methodologies exist and their value is proven  Identify the Valued Ecosystem Components (VECs)  Consult stakeholders on VECs and agree on key ones  Define the geographical and temporal scale  Build scenarios and assess impacts of each scenario on key VECs (VEC- centered perspective)  Identify impact and risks mitigation strategies following the mitigation hierarchy

…but there are challenges to make it work in a project-centered safeguards framework Roles and responsibilities: attribution of impacts to a specific project is in effect impossible  General attribution methodology considers:  Comparison with/without the Project  Relative contribution of the Project to the resulting cumulative impact  Interdependence of effectiveness of mitigation strategies: considering each project in isolation leads to sub-optimal solutions.  Example: cascade hydropower:  With/without a specific project in the cascade generally does not make a lot of difference to the overall cumulative impact  Cumulative impact >> ∑(project impact): each project can have a small contribution to a resulting significant cumulative impact  Management dilemma: e.g. barrier effect on migratory fish. Who owns and manages the resulting cumulative impact?

Attribution challenge: Chiriqui Viejo River  Nine hydropower plants are being developed in cascade on the Chiriquí Viejo River, in western Panama.  The tailrace of each project - in effect converting the river in a succession of small reservoirs and dewatered stretches.  Consider cumulative impact on the river with/without a specific plant. For each plant.

What are the options or how to make it work ? Public Sector: appropriate regulatory and institutional framework in place, e.g. for hydropower cascade: Planning tools at the river basin scale, e.g. watershed management plan, Stakeholders representation, e.g. river basin committees Authority which “owns” the cumulative impacts at river basin scale Lessons learned: Sequencing is important. CIA recommendations are unlikely to be acted upon if the key elements of such framework don’t already exist. Private Sector: best efforts to engage and contribute to a multi-stakeholder collaborative approach for the implementation of management actions that are beyond the capacity of an individual project proponent Lessons learned: Requires a champion. Who is willing to own by default the cumulative impact issues ? Often difficult to implement in practice due to the attribution challenge and a “tragedy of the commons” situation. Synergies public/private: “the Panel finds that this absence of complementarities between public and private sector development efforts is partially responsible for the observed flaws.” (Compliance Review Report of loan 2266/OC-PN “Pando-Monte Lirio Hydroelectric Power Plant Project).

Another outcome of CIA process: river offset for the Reventazon Hydropower Project in Costa-Rica A CIA process was carried out considering all existing and future developments in the Reventazon River basin Conclusion of the CIA was that cumulative impacts on key VECs (fish, tourism, water quality, etc…) would be significant. As a consequence of the CIA process, decision was taken in line with the mitigation hierarchy to develop and implement a river offset: e.g. commitment to leave a free flowing and healthy river system untouched recognizing that cumulative impact on the developed river system can’t be further mitigated.