GATX Corporation ACACSO- Rule 22 TAG Update Nov 2013- Atlanta, GA Presenter: Chauncey Fallen- Manager Transportation Services.

Slides:



Advertisements
Similar presentations
European Cruise Council Conference Update on the Revision of the Package Travel Directive 14 September 2010 Jens Thommesen Unit A3 – Consumer and Marketing.
Advertisements

Presenter: Lisa Butts Watco Companies Modified from ASLRRA Car Hire Training Class A special thanks to Lance (my youngest son) for helping me with the.
1 © 2013 Railinc Corp. All rights reserved. R ECLAIMS Presented By: Chauncey Fallen Manager-Transportation Services GATX Corporation- Rail.
GATX Corporation ACACSO- Rule 22 TAG Update May Las Vegas, NV Presenter: Chauncey Fallen- Manager Transportation Services.
CE 515 Railroad Engineering Car Ownership and Distribution Source: Armstrong, Ch 10 “Transportation exists to conquer space and time -”
0 SCO90 What it is? What it Does? How does it affect Car Hire? Lisa Gering November 10, 2010.
ACACSO Meeting Las Vegas – May 10, 2013 Scott Churchill CSX Transportation ACACSO Meeting Las Vegas – May 10, 2013 Scott Churchill CSX Transportation.
ACACSO – New Orleans, LA May 11, 2012 Lynn Brown LB Rail Consultant, Inc. 1.
ACACSO Understanding and Establishing Pool Codes Jeffery D. Roton November 14, 2013.
GATX Corporation Using Deprescription Industry Tools to Assess Railcar Market Conditions 11/09/2011 Unless otherwise noted, GATX is the source for data.
R ULE 22 A UTOMATION ACACSO – MAY B ACKGROUND Recommended by Centralized Car Hire TAG (CCH) in September 2013 Unanimously approved by Equipment.
EAC Update for ACACSO – Nov 2014 George A. Jones, CPA CMA – Dir. Car Accounting and Disbursements CSX Transportation November 2014.
City of Watsonville Climate Action Plan and Carbon Fund Project Technical Advisory Committee Meeting #7 Final Meeting April 9, 2014.
May EAC meeting Schedule 2011 The dates of the meetings changed so that EAC meetings will occur approximately two weeks before the Business Services.
Dale Cassels – Manager Car Accounting CSX Transportation.
PDS4 Project Lifecycle Support for LADEE, MAVEN April 3, 2013.
Presented By: Mark Patterson ERCOT Manager, Demand Integration November 29, Minute ERS Pilot update to TAC 1.
EAC Update ACACSO November, EAC meeting schedule for 2011 The dates of the meetings changed so that EAC meetings will occur approximately two weeks.
EAC Update for ACACSO November 2012 George A. Jones – Dir. Car Accounting and Disbursements CSX Transportation.
May 13, July 1, plans pulled for review (you will not be able to access the system during this time) 2. July 30, 2010 – plans will be.
Car Hire Rule 1.B.2 Update Transportation Codes S, X or Y ACACSO Meeting May 7th, 2014 Patty Livingston Manager Fleet Administration Genesee & Wyoming.
EAC Update ACACSO May 12, 2010 George A. Jones Project Update Damaged & Defective Car Tracking (DDCTS) – Work has begun on the 2010 project to complete.
Rule 22 Automation Update ACACSO – Austin, TX November 2014.
EAC Update for ACACSO May 2012 George A. Jones – Dir. Car Accounting CSX.
© 2007 Railinc. All rights reserved. Equipment Assets Management Working Committee.
RAILINC I ACACSO
Update from DCMF MIG Michael Walls MIG Technical Secretary 04 August | Energy Networks Association - DCMF.
AAR Audit TAG Update May 08, 2008 George A. Jones - CSXT.
RULE 4 UPDATE ACACSO Meeting Atlanta – November 14, 2013 Scott Churchill.
George A. Jones, CPA CMA – Dir. Car Accounting and Disbursements CSX Transportation May 2014.
EAC UPDATE FOR ACACSO George A. Jones – Dir. Car Accounting and Disbursements CSX Transportation May 2013.
RAILINC I ACACSO
ACACSO Workshop Car Hire Rule 22 November Memphis, Tennessee J. D. Pavek The Greenbrier Companies.
UMLER ACACSO Meeting May 10 th, 2012 Patty Oakley Manager Fleet Administration Genesee & Wyoming Inc.
Executive Steering Committee Corporate Automation Plan Phase 2 MTAC Meeting February 23, 2005.
Equipment Asset Management Working Committee 2009.
© 2010 Railinc. All rights reserved. Industry Projects & Vision May 9, 2012 New Orleans, LA Jim Pinson Railinc.
DRSEC Update Transmission Workstream 06 November 2008.
Market Evolution Program. 2 Topics Overview of the Market Evolution Program Consultation Plan for Phase 1 Overview of the Market Evolution Program Consultation.
Equipment Asset Management Working Committee Update.
Defect Damaged Car Tracking System Robert Sanford Manager Car Accounting Norfolk Southern.
1 © 2013 Railinc Corp. All rights reserved. R ECAP OF THE C AR H IRE R ULES ACACSO Workshop/Breakout Session Albuquerque, NM November 11 & 12, 2015.
Car Hire Special Market Rates Craig Bicknell – Mgr. Fleet Performance & Compensation Norfolk Southern ACACSO Fall Meeting May 2011.
EAC UPDATE Jim Pinson ACACSO May 11 – 13, 2016.
Railroad Switching – Car Hire Impact
Common Classification
Jim Pinson ACACSO November 14, 2013
Car Hire TOL’s ACACSO, Coeur d’Alene, ID May 11 – 13, 2013
SmartMeterTM Steering Committee Update – September 2012
ACACSO Workshop Suggestions- Car Hire Rule 22 TAG
Customer Service Performance Update Community Advisory Committee
September 8, 2016 Request Approval of the Determinations to be Submitted to Rules Review Commission for Subchapter 15A NCAC 02E (Periodic Review of Existing.
Rule 22 Automation Update ACACSO – Springdale, AR May
ACACSO November 12 Tempe Arizona OT-5 What Is It?
What Happens to Private Railcars – Follow-Up to Savannah
EAC Update Jim Pinson ACACSO May , 2018.
Industry Terms & Acronyms
ACACSO May 10, 2018 Kellie Bates Norfolk Southern
Serving Area Process ACACSO Conference May 10, 2018
Car Hire Data and Industry Insights
Serving Area Table Project Update
R18011 discussion This document prepared for informational purposes only, and does not endorse a specific resolution to the request R18011.
Car Hire Rule 4 Jim Pinson ACACSO May 7, 2014.
ACACSO San Antonio, TX May 9 – 11, 2018
Ctclink executive leadership committee May 31, 2018
Action points Who When WG GES 31 March March 2017
New Commissioners’ Meeting IFTA Amendments
Dale Cassels ACACSO November 11 – 13, 2015
CAR HIRE 101: A SNEAK PREVIEW
TRAIN II Jim Pinson ACACSO May 9, 2014.
Presentation transcript:

GATX Corporation ACACSO- Rule 22 TAG Update Nov Atlanta, GA Presenter: Chauncey Fallen- Manager Transportation Services

ACACSO UPDATE CHR 22 1.Overview- CHR 22 2.EAC’s Multi-Level TAG Recap- CHR 22- YTD 3.EAC’s Multi-Level TAG Recommendation- CHR 22 4.EAC’s Multi-Level TAG Update- Five (5) Options- CHR 22 5.EAC’s Multi-Level TAG Recommendation- CHR 22 6.Questions? 2

Overview- CHR 22 Car Hire Rule 22 allows reclaim on assigned cars (specific shipper and national customer pools) while they are empty and idle. There are basically two kinds of Rule 22 reclaims. Reclaim is allowed for cars that are at the loading point and on cars that are held short of the loading point. 3 Rule 222 Reclaims “At the Loading Point” Non-National & National Pool provision, per Car Service Rule 16. Start/End reclaim time- from date/hour of arrival at the loading point until demurrage free time starts (placement) or until car is released loaded. Rule 224 Reclaims “Held Shorts”- Holding point short of the loading point. Non-National & National Pool provision, per Car Service Rule 16. Start/end reclaim time- from the time of arrival at the holding point (in excess of 24 hours) until car leaves the holding point.

EAC’s Multi-Level TAG Recap- CHR 22- YTD EAC 2012 Goal Recommendation −Study of CHR 22- ways to standardize and centralize the process EAC commission Multi-Level TAG (Sep 2012) to include review and recommendation of EAC’s goal for CHR 22. − First meeting Oct Determined to request Industry input on this issue- i.e. ACACSO. − Second meeting Jan Reviewed Industry feedback from ACACSO to formulate viable options to be considered by the TAG. − Third meeting April Five (5) options were identified for review in relation to only Multi-Level railcars. Each option was assigned to a specific TAG member for research and reporting at the TAG’s next meeting. − Fourth meeting August TAG members presented and reviewed the Pro’s/Con’s of the 5 options and determined a recommendation to the EAC. 4

EAC’s Multi-Level TAG Update- Five (5) Options- CHR 22 Five (5) Options reviewed for CHR 22 (Multi-Level Cars Only) −Leaving CHR 22 as is −Eliminating the multi-level fleet from CHR 22 application −Implementing a 48 hour maximum reclaim (CAP) −Allowing reclaim only during specific time frames (i.e. shutdowns) −Allowing reclaim after a minimum number of hours 5

EAC’s Multi-Level TAG Recommendation- CHR 22 Recommendation to EAC- September 2013 −No unanimous consensus- issue tabled until 2014 −Allow additional time to accurately assess impact of new distribution rules enacted by the Reload Steering Committee for Multi-level railcars. −Leave CHR 22 as is (for now) Centralized Car Hire TAG has recommended that centralizing and automating CHR 22 as a RSPWC 2015 project. 6

Questions? Feedback & Comments 7