ATLAS Pixel Detector July 2001 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report October 11, 2001 N. Hartman, E. Anderssen,

Slides:



Advertisements
Similar presentations
Engineering Division 1 HFT Middle Support Cylinder Eric Anderssen, LBNL.
Advertisements

ATLAS Frame PRR 1 W.O. Miller Feb US ATLAS Pixel Detector Global Supports PRR W.O. Miller, R. Smith, W.K. Miller, R. Baer HYTEC G. Gilchriese, E.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
Module Vessel Connection Concept Steve Virostek Lawrence Berkeley National Laboratory AFC Module Meeting April 23, 2004.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
ATLAS Pixel Detector October 2001 Pixel Week N. Hartman LBNL 1 PST Design Update PST CDR october 2001.
Outer Stave Prototype Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, N. Hartman, J. Silber LBNL W. Miller, W. Shih Allcomp, Inc ATLAS.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
M. Gilchriese Mechanics Labor and Disk Sectors US Pixel Meeting November 2001.
Connectors 13/03/2013Collaboration meeting CERN - CSEM1.
CO 2 return pressure drop budget and pipes from PP2 to tracker Georg Viehhauser.
Global Supports Update W.O. Miller October 2001 US ATLAS Pixel Detector Global Supports Status W.O. Miller, R. Smith, W.K. Miller, G. Hayman, R. Baer HYTEC.
S Temple CLRC1 End-cap Mechanics FDR Cooling Structures Steve Temple, RAL 1 November 2001.
M. Gilchriese Glued Fittings October 5, M. Gilchriese 2 Samples and Prep Three samples using Hysol 9396 Seven samples using Hysol 9394 Surface prep.
M. Gilchriese Glued Fittings October 26, M. Gilchriese 2 Samples and Prep Three samples using Hysol 9396 Seven samples using Hysol 9394 Surface.
M. Gilchriese Status Report Sectors, Rings, Frame December 2002.
Ernie Ihloff 21 May 08 Preliminary Heat Shield Design for nEDM.
ATLAS Pixel Detector Cooling Connections Testing and Development: Progress Report September 28, 2000 N. Hartman, E. Anderssen, M. Gilchriese, T. Weber,
M. Gilchriese Upgrade Stave Assembly and Robotics August 3, 2007 LBNL.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Some Recent BNL, LBNL and Yale Work 1.Honeycomb flatness from manufacturer 2.Commercially fabricated C-channel 3.VCR Fittings 4.BN powder thermal evaluations.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
ATLAS Pixel Detector Cooling Connections Testing and Development: Progress Update February, 2001 N. Hartman, E. Anderssen, M. Gilchriese, T. Weber, F.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
M. Gilchriese SLHC Pixel Local Supports Based on Thermally Conducting Carbon Foam E. Anderssen, M. Cepeda, S. Dardin, M. Garcia-Sciveres, M. Gilchriese,
M. Gilchriese - November 12, 1998 Status Report on Outer Support Frame W. Miller Hytec, Inc E. Anderssen, D. Bintinger, M. Gilchriese LBNL.
ATLAS Pixel Detector Cooling Services Joining Techniques: Progress Report December 13, 2000 N. Hartman, E. Anderssen, M. Gilchriese, F. Goosen, T. Johnson,
WP4 Equipment Bids (Tim). Bids ATLAS – Case for the Purchase of Equipment for the Testing of Cooling Loops (£15k) – Case for the Purchase of Equipment.
VG1 i T i March 9, 2006 W. O. Miller ATLAS Silicon Tracker Upgrade Upgrade Stave Study Topics Current Analysis Tasks –Stave Stiffness, ability to resist.
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
ATLAS Pixel Detector February 2002 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort February, 2002 N. Hartman,
Design Discussion of Mechanical / Electrical Interfaces Bill Cooper (Fermilab) (Layer 1) VXD.
ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL Service Connectivity from Module to PP1b Eric Anderssen LBNL Pixel Services Meeting, CERN.
ATLAS Pixel Detector Cooling Connections Testing and Development: Progress Report April 26, 2001 N. Hartman, E. Anderssen, M. Gilchriese, F. Goozen, T.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
LHC CMS Detector Upgrade Project FPIX Cooling Update Stefan Grünendahl, Fermilab For the FPIX Mechanical Group, 29 January 2015 Stefan Grünendahl,
DOE/NSF Review of U.S. ATLAS /March 2001 WBS Pixel Overview and WBS Pixel Mechanics M. G. D. Gilchriese Lawrence Berkeley Laboratory.
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
Overview WG4 Meeting - 16th October 20121M. Gomez Marzoa, E. Da Riva Maximum ΔT admissible at cooling system T_1 T_2 T_1+0.5*ΔT Stave  If T_2 – T_1 =
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
1 Monophase Measurements on Prototype Pixel Structures D. Bintinger, M. Gilchriese, J. Taylor and J. Wirth and contributions from D. Cragg, E. Perrin and.
Stave - Electrical Break Richard French The University of Sheffield Material from the ATLAS SCT/IBL/PIXEL community.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
M. Gilchriese Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, J. Wirth October 11, 2001.
M. Gilchriese - December 2000 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Wirth and D. Uken Lawrence.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
K.W. Glitza University of Wuppertal IBL Stave (Lessons for Upgrade)
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
M. Gilchriese Towards Fabrication of a Mechanical Prototype Stave.
IN2P3. Why Titanium for cooling circuits? Titanium material collect the most important criteria for cooling circuit design: Low CTE: important parameter.
Cooling Loop Update ATLAS W4 Sheffield Richard French The University of Sheffield + all UK contributors.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
Documentation on present system and piping layout P. Tropea Tracker Upgrade Engineering and Cooling 12 November 2008.
ATLAS Pixel Detector December 2001 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort December, 2001 N. Hartman,
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
M. Gilchriese - February 2001 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Taylor, T. Weber, J.
Pierre Delebecque Cooling – upgrade 2012 May 31 st 1 Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
ATLAS 1 Beam Pipe Support SCT TRT Side CSide A Services and Beampipe Support Frame Services and Beampipe Support Frame Pixel Detector Composite support.
ATLAS Internal ID Service Integration
Feedback on transfer line sizing and flow calculations for UT
Soldering Brazing.
Summary LBNL LSWG meeting
Ti/SS transitions A.Basti INFN-PISA*
WP9 ITS Mechanics and Cooling
Flexible lines assembly
Presentation transcript:

ATLAS Pixel Detector July 2001 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report October 11, 2001 N. Hartman, E. Anderssen, M. Gilchriese, F. Goozen, T. Johnson, T. Weber, J. Wirth

ATLAS Pixel Detector July 2001 Cooling Services Connections N. Hartman LBNL Current Status New Leak Rate Requirements as of last meeting –Newest testing regimen agreed upon –Based on rough system pressure calculations Luer Locks –Initial Al/AL fittings fully tested –Initial Al/PEEK fittings fully tested (electrical breaks) Laser Welding –Current problems –Material Testing –Possible Solution Gluing –All current Luers were glued –Some may have had glue failures – these are being investigated Fitting Comparisons –Mass and size Other work

ATLAS Pixel Detector July 2001 Cooling Services Connections N. Hartman LBNL Common Testing Regimen (stave and sector and all type 0/1 tubes) He vacuum leak check (quanitative) 10 bar proof test (visual, assure that fitting doesn't mechanically explode, no more than 1 minute) 4 bar He pressurized leak check at 0 Celsius (quanitative) 1 bar He pressurized leak check at -35 Celsius (quanitative) He vacuum leak check (quanitative) Thermally cycle fitting assembly 50 times (20 to -35 C) Pressure cycle fitting assembly 50 times (1 to 4 bar) Repeat tests 1,3,4,5 (all quanitative, in that order)

ATLAS Pixel Detector July 2001 Cooling Services Connections N. Hartman LBNL Rough System Pressure Calculations Based on conductance calcs assuming all fittings leak at same rate, and that Allowed system pressure on introduction Of c3f8 is 200 microbar. Assumes 10 Sets of fittings per circuit (all the way to cooling plant).

ATLAS Pixel Detector July 2001 Cooling Services Connections N. Hartman LBNL Newest Leak Specifications Permanent connections – welds –1x10-7 atm-cc/sec Leak Rates at 1 bar –3e-5 atm-cc/sec Leak Rates at 4 bar –1e-4 atm-cc/sec

ATLAS Pixel Detector July 2001 Cooling Services Connections N. Hartman LBNL Fitting Test Specimens – Luer Lock Type Luer Lock Pieces (PEEK and Aluminum). Assembled Fitting. PEEK Al

ATLAS Pixel Detector July 2001 Cooling Services Connections N. Hartman LBNL Luer Lock Results

ATLAS Pixel Detector July 2001 Cooling Services Connections N. Hartman LBNL Joining Methods – Laser Welding

ATLAS Pixel Detector July 2001 Cooling Services Connections N. Hartman LBNL Laser Welding Problems Tube Material – Batch 1 –Reported as 3003 AL –Laser Welding very Successful –Later found to be 1060 AL (almost commercially pure) Tube Material – Batch 2 –Ordered 3003 AL – different vendor –Tested as 3003 AL –Will not laser weld (microcracks on cooldown) Tube Material – Batch 3 –Ordered 3003 AL –Material is now being tested (same vendor as batch 1) –Laser welding is on hold pending test results

ATLAS Pixel Detector July 2001 Cooling Services Connections N. Hartman LBNL Possible Laser Weld Solution Additional Weld material –Add 4047 Al Ring to joint –Material can weld to both 3003 and 6063 (fitting) –Provides buffer between two incompatible alloys Weld Zone 4047 Filler Current DesignNew Design

ATLAS Pixel Detector July 2001 Cooling Services Connections N. Hartman LBNL Fitting Test Specimens – Luer Lock Type Luer Lock Pieces (PEEK and Aluminum). Assembled Fitting. PEEK Al

ATLAS Pixel Detector July 2001 Cooling Services Connections N. Hartman LBNL Fitting Test Specimens – Variseal Type Fitting Pieces shown disassembled. ~10 mm Fitting Seal Split Clamp Centering Ring Fitting Assembled Fitting (one shown with Swage lock connector).

ATLAS Pixel Detector July 2001 Cooling Services Connections N. Hartman LBNL Fitting Comparisons

ATLAS Pixel Detector July 2001 Cooling Services Connections N. Hartman LBNL Fitting Comparisons Fitting Volume Smeared over hoop at radius 210 mm, 50 mm long

ATLAS Pixel Detector July 2001 Cooling Services Connections N. Hartman LBNL Other Work Type 0 and type 1 potential tubing has been received - Marco has proposed two tubing sizes – 4 and 8 mm ID - Standard U.S. Sized tubing fits this with 350 and 400 micron wall thicknesses PP1 layout is being made Standard fittings being investigated Bellows design will be made soon Variseal tests with new test sequence are about to begin - may be attractive solution in order to lower mass - performance is on par with new leak rate numbers