EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.

Slides:



Advertisements
Similar presentations
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Advertisements

1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS.
BEB Transport und Speicher Service GmbH, Hannover Capacity Development NW Region Capacity Development in the North-West.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
Nina Grall DG TREN – Directorat C GRI SSE-EFET WS, 21/01/2008, Prague Concepts for the EU Gas Market Requirements and framework EUROPEAN COMMISSION.
EU Developments Transmission Workgroup 3rd November 2011.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
EU Developments Transmission Workgroup 6th October 2011.
European Developments: Capacity Transmission Workgroup 6th October 2011.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Towards Regional Independent Operators – a main driver for successful market integration.
Update on GSE Activities Klaus-Dieter Barbknecht GSE President GIE General Assembly Madrid 21 November 2007.
How the Implementation of the Network Code Does Help Infrastructure Users Vasile FLOREA Director of Commercial Balancing SNTGN TRANSGAZ SA Medias.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
Erik Rakhou - Energiekamer 19th Madrid Forum 22 March 2011 Amendment of the Guidelines of Good Practice for Storage System Operators - Capacity allocation.
Update on transit compensation mechanism application in Baltics Arnis Staltmanis Head of International Project Department 16 September 2009, Vilnius.
Transparency requirements in accordance with the provisions of Regulation 715 M.Sc. Aleš Osrajnik Ljubljana, 13 September, 2012 ACER Workshop on Transparency.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Concept of Transparency Platform Martin Reisner Junior Adviser, Transparency ENTSOG’s Transparency Workshop Brussels – 11 September 2012.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Tom Maes, ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Transit contracts.
Directorate General for Energy and Transport Johannes ENZMANN Administrator DG Energy and Transport European Commission GTE 2nd Annual Conference 23 September.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
GRI NW Investment - Update on project Common effort on making regional investment happen 21 September 2010.
Gas Regional Initiative North-West Gas Balancing Dublin Workshop 24 th April 2007 Steve Pownall.
Transparency GRI SSE -- 7th Stakeholder Group Meeting Vienna, 16 October 2009 Andrea Ćirlićová GTE+ Senior Adviser.
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Transmission Transparency Workshop European Strategy and Environment 10 July 2008.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
GRI NW TRANSPARENCY PROJECT Transparency Workshop 31 March 2009.
1 GTE Transparency Platform GIE Annual Conference Madrid, 22/23 November 2007 Paolo Mosa GTE Vice President.
MIPI European Transparency Project (ETP) Transmission Workstream 7 th October 2010.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Gas Roads & GTE Colin Hamilton (European Policy) 2 nd July 2009.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency, Transmission Transparency Project GRI North-West.
European Developments Transmission Workgroup 1 st December 2011.
Click to edit Master title style 1 Neta Meidav Manager, Ofgem GRI NW 9 th Stakeholder Group Meeting 25 November 2011, Rotterdam GRI NW Transparency Project.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
European Developments Transmission Workgroup 3 rd May 2012.
Guidelines on Transmission Tarification ERGEG Public Hearing 30. June 2005.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren 20 th Madrid Forum, 26 Sept 2011.
Madrid, 23rd Sep th SG Meeting South Gas Regional Initiative OSP and Interoperability.
European Transparency Requirements - update Transmission Workstream 1 st May 2008.
Congestion Management
Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011
Gas Regional Initiative North-West
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
Transparency Project GRI NW Region
New transparency guidelines
EU Implementation Programme
2009 TSO Transparency Gas Regional Initiative North-West
Background and Process
GRI NW TRANSPARENCY PROJECT
Update on European Network Codes
European Transparency Requirements
EUROPEAN TRANSPARENCY UPDATE
DRAFT DG TREN Staff Working Paper on LNG
EURELECTRIC transparency requirements
LNG Workshop Bilbao, March 13th 2009 GLE.
Presentation transcript:

EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th stakeholder Group Meeting 9 June 2009, Paris

| 2XVI Madrid Forum Content. Current transparency guidelines » what do they cover? » need to amend them. EC’s draft proposal. Next steps

| 3XVI Madrid Forum Current transparency guidelines. already cover several good elements as to the content (what needs to be published) » detailed and comprehensive description of different services offered and their charges; » different types of transportation contracts; » provisions on capacity allocation » …. has specific definition of relevant points » entry points and most important exit points » all points connecting different networks of TSOs » all points connecting network of TSO with LNG terminal » …. elements of time schedule according to which the information must be published » capacity situation down to daily periods » available capacities: 18 months ahead » daily updates of availability of short term services » …

| 4XVI Madrid Forum Follow-up XV Madrid Forum. GIE-transparency workshop 31 March. DG TREN drafted new transparency guidelines which » are at this stage draft proposal by DG TREN services » do not bind the Commission

| 5XVI Madrid Forum New draft guidelines - overview. TSOs will have to provide » more detailed real-time and historic information on availability and use of capacities gas flows » more detailed information on specific issues and services: balancing gas quality conversion capacities Secondary market » on an internet site accessible to the public » in both the national language and English

| 6XVI Madrid Forum Structure of the draft proposed guidelines 3.1. Definition of the technical information necessary for network users to gain effective access to the system Form of publication Content of publication 3.2. Definition of all relevant points for transparency requirements 3.3. Information to be published at all relevant points and the time schedule according to which this information should be published

| 7XVI Madrid Forum New elements on form of publication. on a website accessible to the public, free of charge and without any need to register or otherwise sign on with the TSO;. on a regular/rolling basis; » the frequency shall be according to the changes that take place and the duration of the service;. in a user-friendly standardised manner;. in a meaningful, quantifiable clear, easily accessible way and on a non-discriminatory basis, in a timely, concise and correct manner;. in downloadable and raw data format;. in consistent units;. to all interested parties, including potential users, at the same time and in the same manner;. in the official language(s) of the Member State and in English;. via one single interface per entry/exit point

| 8XVI Madrid Forum New elements on content of publication. for all relevant points » a full specification of the gas quality parameters and; » information on pressure requirements;. clear information on the circumstances that can lead to liability of network users, the potential risks for network users and the impact on their contracted gas flows at least with respect to: » gas pressure requirements » treatment of gas that is not within the specified parameters ("off spec gas") » emergency mechanisms (such as measures for disconnection of customer groups in case of capacity scarcity in case of an emergency or other. any agreements and procedures agreed upon by TSOs at interconnection points, especially: » those describing how to facilitate interoperability of the grid; » agreements on nomination and matching procedures; and » other agreements that set out provisions in relation to gas flow allocations and cross system balancing, including the methods used

| 9XVI Madrid Forum New elements on relevant points. all entry and exit points to and from a transmission network operated by a TSO. all entry and exit points connecting balancing zones of one or more TSOs;. also storage and production facilities;. also essential points which are physically or contractually congested and which are likely to experience physical congestion;

| 10XVI Madrid Forum Services and flows. all services provided, including ancillary services » the nominated firm and interruptible capacity in both directions » commercially available capacity for all types of capacity offered to the market; » planned and unplanned interruptions to flows, the reason for interruption and the circumstances under which flows will be interrupted. updates in real time. information shall correspond to the smallest period in which the capacity is offered or balance is settled » daily or hourly periods on a numerical basis. historical information » for the past five years on a rolling basis and on a numerical basis gas flows interruptions

| 11XVI Madrid Forum Interruptible capacity. to each potential user: » sufficient and daily updated information on the probability of interruption for all interruptible capacity;. to each potential user requesting information on interruptible bookings: » the probability of interruption for the booking period requested;. to each capacity user having booked interruptible capacity: » information on any significant change in the probability of interruption during the remainder of the booking period

| 12XVI Madrid Forum Linepack. where linepack is offered for TPA or where TSOs engage in traded markets: TSOs shall publish daily aggregate linepack forecasts for the end of each relevant gas day and, if applicable, the linepack available to system users

| 13XVI Madrid Forum Tariffs. at least the following elements of the tariff calculation: » consideration of fuel gas; » incentives for new infrastructure; and » where applicable, the auction methodology and the criteria applied for and results of benchmarking

| 14XVI Madrid Forum Long term forecasts. on an annual basis over all years where capacity is contracted down to the first year where capacity is available for booking and at least for the next 10 years. publication shall reflect the period for which capacity is offered to the market

| 15XVI Madrid Forum Secondary market transparency. Aggregated amounts of capacities » On a daily basis the aggregated amounts of capacities sold » per interconnection point » per type of capacity, » type of sale, » the size and duration of capacity usage rights. Harmonised conditions of capacity transactions » a description of standardised products which can be sold on the secondary market; » lead time and execution time for the implementation/acceptation/registration of secondary trades; » the notification by the seller about name of seller and buyer and capacity specifications as outlined in 3.3.(9)

| 16XVI Madrid Forum XVI Madrid Forum 16. The Forum welcomes the Commission's draft proposal of new transparency guidelines.… … stakeholders are invited to submit to the Commission their views on the draft proposal by no later than the end of June. The Commission will then consider how to take the various remarks into account in the final proposal…. The Commission plans to take the draft transparency guidelines forward in view of the adoption later this year. 19. The Forum congratulates the Northwest regional initiative ….. on the progress realised within the GRI NW transparency project. …. encourages TSOs in the region to bring forward proposals for further transparency. The Forum also acknowledges the importance of the agreement, in the NW region, for implementing enhanced transparency for gas storage by the end of the year, thus addressing security of supply concerns. The Forum asks other Storage System Operators to join this initiative to implement the transparency requirements of the 3rd package.

| 17XVI Madrid Forum Way forward. End May Madrid Forum - consultation on the proposal continues. 1 st /2 nd week of June Submission of the Impact Assessment to the Impact Assessment Board. Beginning-Mid July Meeting of the IAB and Inter Service Consultation. August Adoption of the proposal. September Start of the Comitology process ?