September 2012 Proposed CRR Auction Credit Changes: Summary of Draft NPRR.

Slides:



Advertisements
Similar presentations
Nodal Credit Limit Overview Credit Work Group May 28, 2008 Cheryl Yager.
Advertisements

Credit Management NPRR 484/554
ACSDA Leadership Forum CDS Financial Risk Model Summary of Key Financial Risk Controls Nauman Mahmood, Managing Financial Risk Director October 9,2007.
NPRR 206 DAM Credit Requirements Reduction: E Values and Percentiles Luminant Proposal.
Automation and Improvements to Default Uplift Methodology (summary/white paper of a draft NPRR)
CRR Shortfall – Revenue Equalization Part 2 (Continuation from 2/21/08 TPTF discussion) Bill Barnes TPTF 3/5/2008.
NPRR Proposed Changes TPTF Meeting 26 Aug 2008.
Potential Future Exposure (PFE) Q Presentation Randy Baker Director, Credit Risk 19 January 2010 ERCOT Board of Directors Meeting.
MCWG Update to WMS Loretta Martin LCRA, Chair Josephine Wan AE, Vice Chair 03/05/
NetThruPut Inc. (NTP) PRMIA Luncheon May 31/06. 2 NTP Introduction NTP is an electronic exchange that allows energy market participants to buy and sell.
Energy Balancing Credit Proposals Transmission Work Stream 6th November 2008 Mark Cockayne.
Congestion Revenue Rights Activity Calendar Update Donald House CMWG September 19, 2014.
1 CRR Credit Policy Task Force Update TPTF July 21, 2008.
Market Trials - Friday call Credit and Treasury Weekly Update September 3, 2010.
March 7, 2008 Credit Work Group Nodal – Weighting Factors for CRR Future Credit Exposure.
WMS Subgroup – CRR Credit 3.Review of CRR margining methodology for PTP Obligations in Nodal Protocols 4.Potential credit margin alternatives Cheryl Yager.
1 NPRR 484/554 – Revisions to Congestion Revenue Rights Credit Calculations and Payments Market Call ERCOT Public July 31, 2013.
Board of Directors Credit Aspects of Mass Transition.
Texas Nodal Section 9: Invoicing ERCOT, Settlements & Billing SDAWG - August 2007.
Market Credit Working Group update to the Wholesale Market Subcommittee 06/03/
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
MCWG Update to WMS 5/11/ Exposure / Collateral Update Nodal Total Potential Exposure reported by ERCOT as of 4/30/11 remains less than Zonal Estimated.
1 CRR Credit Policy Task Force Update WMS April 16, 2008.
MCWG Update to WMS 6/15/ Exposure / Collateral Update Nodal Total Potential Exposure reported by ERCOT as of 4/30/11 remains less than Zonal Estimated.
Nodal Credit Monitoring and Management – Business Requirements ERCOT CREDIT Department October 11, 2006.
September 2012 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Matt Tozer ERCOT Manager, Settlements & Billing 9/4/2013 ERCOT Update Management of the Balancing Account CMWG.
MCWG Update to WMS 08/14/2013. MCWG Update to WMS General Update -July 31 st Joint MCWG/CWG Meeting Review NPRRs All operational except – NPRR 552 – Additional.
October 20, 2010 WMS Credit Update. 2 Topics Nodal exposure – how much collateral CRR/TCR auctions – December 2010 Preliminary Credit Cutover Timeline.
Transmission Congestion Rights – Credit Perspective April 17, 2014.
FURTHER INFORMATION ON MISO FTR AUCTIONS For SPP RSC Discussion October 6, 2010.
Market Credit Working Group Update to WMS Wed. Sept 16, 2009.
TCR to CRR Transition Plan Proposed method for TCR Auction Revenue refunds Contingency plans For TAC Nov 1st, 2007.
9/17/2012 CSWG CSWG – ERCOT Update ERCOT. 2 Settlements Project & Operational Updates February 27, 2012 NPRR 347: Combined Daily Invoice –Still on track.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Settlement Invoices Business Requirements Settlements and.
January 7, 2011 Review Nodal Exposure / Collateral as of end of December, 2010 Cheryl Yager.
MCWG Update to WMS 11/13/2013. MCWG Update to WMS General Update - October 30 th Joint MCWG/CWG Meeting Review September 25 Meeting Minutes - Approved.
1 Business Integration Update to PRS Troy Anderson ERCOT Enterprise Project Portfolio Management August 18, 2011.
Nodal Short Pay and Uplift Process CWG Meeting May 28, 2008.
ERCOT Market Credit Working Group Presentation to the Finance and Audit Committee Payment Short Pay/Default and Uplift for Congestion Revenue rights (CRRs)
Market Credit Working Group Update to WMS Wed. Oct 20, 2010.
1 Nodal Credit Update at WMS June 16, 2010.
ERCOT CWG/MCWG April 24, 2013 DAM Credit Parameters.
Market Credit Working Group Update to WMS Wed. Nov 18, 2009.
November 27, 2012 NPRR322, Real-Time PTP Option Modeling Implementation Overview.
1 NPRR 484/554 Phase 2 Suresh Pabbisetty, ERP, CQF, CSQA Lead Technical Analyst, Credit CWG / MCWG May 20, 2015 ERCOT Public.
Total Potential Exposure (TPE) Overview Credit Work Group May 28, 2008 Cheryl Yager.
July 28, 2010 Market Readiness Seminar Credit Transition to Nodal (Preliminary)
Market Operating Level Agreement (OLA) Discussion Betty Day 8 December 2009 Nodal Advisory Task Force.
Discussion on FGR Settlement Protocol Language David Maggio CMWG February 17, 2014.
MCWG Update to WMS 2/9/2010. Agenda Items Exposure / Collateral Status Update 1/26 MCWG/CWG Joint Meeting – Potential NPRR to enable expiring CRRs to.
DAM Collateral Requirements Carrie Bivens Manager, Day-Ahead Market Dec 16,
1 Credit Parameters Review TAC July 2, Protocol Section , “Credit Requirement for DAM Bids and Offers” specifies: Credit Requirement for.
DAM Performance Issues with CRR Offers Steve Reedy Market Design Manager TAC 2 September 2010.
Nodal Credit Monitoring and Management – Business Requirements ERCOT CREDIT Department September 28, 2006.
CRR Default and the Nodal Market Wholesale Market Subcommittee February 20, 2008.
Money Transfer Due to Real-Time Irresolvable Constraint Resmi Surendran ERCOT.
Report to TAC June In Brief Working Group Reports Working Group Reports CMWG CMWG MCWG MCWG QMWG QMWG VCWG VCWG Other Reports Other Reports NOGRR.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public May 18, 2016.
Day Ahead Market QSE’s Credit Requirements Concerns and Solutions August 14, 2008.
MCWG Update to WMS 3/9/2010. Exposure / Collateral Update Nodal Total Potential Exposure reported by ERCOT as of 1/31/11 remains less than Zonal Estimated.
CRR Deration and NPRR821 WMS 09/06/2017.
Credit Reports Vanessa Spells COPS Meeting ERCOT Public
Exceptional Fuel Costs in LMP
DALE MCWG / CWG 3/10/2010.
LCRA Comments regarding NPRR 821
Credit Updates Vanessa Spells Credit Work Group ERCOT Public
Future Credit Exposure (FCE)
Annual Review of Credit Parameters
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
Presentation transcript:

September 2012 Proposed CRR Auction Credit Changes: Summary of Draft NPRR

Draft -Confidential – Not for Distribution Objectives of CRR Collateral Methodology Changes 1 1)Proposal primarily focuses on modifying the way collateral is calculated for the “Future Exposure” related to holding a CRR where “Future Exposure” is defined as the potential payment that would need to be made by a CRR holder if the reference DAM price settles at a negative number. The key elements of the proposal are: a)Replace the auction collateral adder “A” ($0.75/MWh) and the post-auction FCE calculations with an adder based on the credit exposure risk associated with owning individual CRR obligations on a source-sink basis b)Given the lack of a liquid forward CRR market, historic settled DAM prices represent the best available data. Proposal uses P99-P100 historical sink-source DAM prices, broken up by TOU, as a proxy for a monthly price, e.g. 18 days for 5*16, 8 days for 2*16, 28 days for 7*8 c)For CRRs held for current month delivery, the Path Specific DAM Based Adder will not roll- off until the last day of the delivery month d)Applies a “Portfolio Benefit” to post auction FCE calculation e)Gives ERCOT the ability to increase collateral on a specific path due to “State Change” f)Allows price history to be excluded if no longer relevant 2)This proposal would allow Market Participants to post collateral for the notional value of awarded CRRs for “Forward Months” in lieu of pre-paying: a)A “Forward Month” is defined as any month further out than the prompt delivery month i.e. if an auction is held in Nov ’12, Forward Periods would be defined as any months beyond Dec ’12 b)The full notional value of all CRRs bid on will continue to be collateralized during the pre- auction process c)Note - CRRs awarded for the prompt month will continue to be paid for in full before the month begins

Draft -Confidential – Not for Distribution Calculation of Auction Collateral Requirements 2 [(Bid MW X (Max(0,Bid Price) - Min(99 th Percentile A 1,ACP) + S 2 )] minus [Offer MW X (Min(0,Offer Price)] Credit risk exposure for Obligation Bids is equal to: a)the payment that the CRR holder would have to make to ERCOT if awarded the CRR, plus b)the potential payment the CRR holder would be required to make to ERCOT based on the reference source-sink DAM settlement price i.e. if price settled at a negative number Credit risk exposure for Obligation Offers exists when the Offer Price is negative i.e. the CRR holder is willing to pay ERCOT in order to close their existing CRR position. Under this proposal collateral requirements for Bids or Offers that would result in ERCOT making a payment to the CRR holder would be set to $0 CommentsCalculation Note - In all cases, calculation is summed by source-sink path, time of use, and month (1) where A is the Path Specific Adder and is either 0 or a negative number (2) where S is the State Change Adder and is set to $0/MWh as a default [Bid MW X Max(0,Bid Price)] minus [Offer MW X Min(0,Offer Price)] Credit risk exposure for Option/FGR Bids is equal to the payment that the CRR holder would have to make to ERCOT if awarded the CRR. With an Option/FGR there is no delivery month risk Credit risk exposure for Option/FGR Offers exists when the Offer Price is negative i.e. the CRR holder is willing to pay ERCOT in order to close their existing CRR position. Under this proposal collateral requirements for Bids or Offers that would result in ERCOT making a payment to the CRR holder would be set to $0 Obligations Options / FGRs Options / FGRs

Draft -Confidential – Not for Distribution Calculation of Future Exposure Collateral Requirements 3 Credit risk exposure for awarded Obligation Bids is equal to: a)the payment that the CRR holder has to make to ERCOT for awarded CRRs in the forward months (invoice payment is only required for Prompt Month CRRs), plus b)the potential payment the CRR holder would be required to make to ERCOT based on the reference source-sink DAM settlement price i.e. if price settled at a negative number Credit risk exposure for Obligation Offers exists when the awarded Offer cleared at a negative price i.e. the CRR holder has to pay ERCOT in order to close their existing CRR position. Under this proposal awarded Bids or Offers that would result in ERCOT making a payment to the CRR holder provide a credit benefit CommentsCalculation Note - In all cases, calculation is summed by source-sink path and time of use (1) where PWA is the Portfolio Weighted Adder and is either 0 or a negative number (2) where PWACP is the Portfolio Weighted Auction Clearing Price (3) where S is the State Change Adder and is set to $0/MWh as a default [Fwd Mth Purchased MW X Awarded Price] minus [Fwd Mth Sold MW X Awarded Price] Credit risk exposure for Option/FGR Bids is equal to the payment that the CRR holder has to make to ERCOT for awarded CRRs in the forward months (invoice payment is only required for Prompt Month CRRs). With an Option/FGR there is no delivery month risk Credit risk exposure for Option Offers exists when the awarded Offer cleared at a negative price i.e. the CRR holder has to pay ERCOT in order to close their existing CRR position. Under this proposal awarded Bids or Offers that would result in ERCOT making a payment to the CRR holder provide a credit benefit Obligations Options / FGRs Options / FGRs [Fwd Mth Purchased MW X Award Price] minus [Fwd Mth Sold MW X Award Price] plus [Net MW X – ((Min(100 th percentile PWA 1,PWACP 2 ) + S 3) ] Delivery Mth Option Offset A credit offset is given for the expected payout of prompt month MW owned which is equal to notional MW X 99 th percentile Portfolio Adder [Delivery Mth MW X 99th percentile A 1 ] (1) where A is the Path Specific Adder and is either 0 or a positive number

Draft -Confidential – Not for Distribution Key Elements of Proposal 4 Path Specific Adder The current $0.75/MWh auction adder does not take into account the difference in “riskiness” of owning different paths The intention of the Path Specific Adder is to mitigate credit exposure associated with potential payments that CRR obligation holders have to make during the delivery month should the reference DAM prices for a particular source-sink path settle at a negative price By using the 99 th percentile of a rolling average “monthly” price data set for each source-sink pair the majority of historical events should be captured Collateral is posted for each path owned, regardless of “Portfolio” benefit Methodology: -Using the rolling average “monthly” price data set for each source-sink pair, select the value that represents a P99 confidence level. -Collateral posted is then equal to the P99 value for each source-sink path applied to the total volumes bid on each path -Note – specific historic DAM settled prices for source-sink paths can be excluded from the calculation if deemed no longer relevant following TAC review and ERCOT Board approval Portfolio Weighted Adder Owning a number of CRR paths is likely to provide some degree of correlation benefit i.e. in the event of default, the holder of a portfolio of CRRs would have some paths that require payments to ERCOT, while others would require payment from ERCOT to the CRR holder. The Portfolio Weighted Adder takes this into account by calculating an adder based on current volumes owned applied to historical source-sink pair price data at a P100 confidence interval Methodology: -To determine the Portfolio Weighted Adder use awarded volumes for each source-sink path and calculate a new data set that represents a volume weighted rolling “monthly” average prices of the portfolio of awarded volumes -From this new data set select the value that represents a P100 confidence level. This represents the worst case scenario that a particular portfolio of volumes would have settled at historically -Collateral posted is equal to the P100 value applied to total awarded volumes by month -Note – specific historic DAM settled prices for source-sink paths can be excluded from the calculation if deemed no longer relevant following TAC review and ERCOT Board approval

Draft -Confidential – Not for Distribution Key Elements of Proposal (continued) 5 Incorporation of Current Mkt View via ACP Given the lack of a forward liquid CRR market, the Path Specific and Portfolio Weighted Adders are based on historical DAM settled prices. Given that a P99/P100 confidence interval is being used, this is likely to mitigate the majority of potential credit exposure. However, recognizing that historical prices may not always represent the future, incorporating the most recent auction clearing price (either on a path specific or portfolio basis) in the collateral calculations will ensure that the current market view of congestion is taken into account Methodology: -To the extent that the most recent Auction Clearing Price for a particular source-sink path is lower than the current Path Specific Adder it will replace the Path Specific Adder in the Auction Collateral calculation – applies to relevant path, month, and time of use -To the extent that the Portfolio Weighted Auction Clearing Price (calculated based on awarded volumes) is lower than the current Portfolio Weighted Adder it will replace the Portfolio Weighted Adder in the Post Auction Collateral calculation – applies to relevant path, month, and time of use Incorporation of “State Change” There may be a circumstance where the “riskiness” of a particular source-sink path has not been captured by either historical DAM settled prices, or the most recent Auction Clearing Price While this period of time is likely to be relatively short i.e. between the Adder calculation “catching up” with current prices or a new auction taking place, the “State Change Adder” gives ERCOT the ability to increase collateral on a particular path by month, and time of use. In order for this increase to stay in place for more than 60 days, ERCOT would require TAC approval The default by path, month and time of use for the State Change Adder will be set to $0/MWh