13 March 2007G. Rakness (UCLA) 1 Minus side slice test status Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.

Slides:



Advertisements
Similar presentations
24 April 2007G. Rakness (UCLA) 1 Power cuts at Green Barracks/SX5 False fire alarms from the central fire alarm system (incendie central) cut power to.
Advertisements

22 May 2007G. Rakness (UCLA) 1 At minus-side slice test… Complete description of how to bring back slice test all the way from (power=off) to (local run=physics.
CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
TMB-RAT Software Update USCMS Slice Test Rice University August 16, 2004 Martin Von der Mey / Yangheng Zheng* University of California, Los.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
Preliminary Results from Structured Beam Test CMS Trigger Meeting June 3, 2003 Brian Mohr UCLA Dept. of Physics.
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
S. Durkin, USCMS-EMU Meeting, Oct. 21, 2005 Critical Data Errors S. Durkin The Ohio State University USCMS EMU Meeting, FNAL, Oct. 20, 2005.
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
20 Oct 2009G. Rakness (UCLA)1 Powering on… Last week: CMS off to give evaporation time to dry out the experiment Monday – Tuesday: Began powering on CSCs.
15 Sept 2009G. Rakness (UCLA)1 Paper progress On the Analysis Review Committee for the paper: “Performance of the CMS Cathode Strip Chambers with Cosmic.
Status of the CSC Track-Finder Darin Acosta University of Florida.
Track-Finder Trigger at the Beam Test Results and Features Darin Acosta, Rick Cavanaugh, Victor Golovtsov, Lindsey Gray, Khristian Kotov, Alex Madorsky,
Design Considerations for an Upgraded Track-Finding Processor in the Level-1 Endcap Muon Trigger of CMS for SLHC operations Sep TWEPP09 D. Acosta,
Test Beam Wrap-Up Darin Acosta. Darin Acosta, University of Florida 18 June 2004 USCMS Meeting 2 Agenda n Darin/UF: General recap of runs taken, tests.
CSC Synchronization documentation Step-by-step procedure to… – Read out a chamber – Synchronize triggers from many chambers (and read out data) Description.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
Various Wrote Run Coordination job description – Found this exercise to be useful as CSC Operations guy, so decided to do it as Deputy Run Coordinator…
Draft of talk to be given in Madrid: CSC Operations Summary Greg Rakness University of California, Los Angeles CMS Run Coordination Workshop CIEMAT, Madrid.
10/06/09 UCLA Meeting Hauser 1/14 really Various updates Update on LHC schedule: Beam to Alice starts ~Oct. 24. Not all sectors are cold. Circulating beam.
Tests of the Fully Loaded CSC Track Finder Backplane M.Matveev S.-J. Lee Rice University Alex Madorsky University of Florida 2 May 2005.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
CMS Latency Review, 13th March 2007CSC Trigger 1 Latency and Synchronization update.
Track-Finder Test Beam Results Darin Acosta. Darin Acosta, University of Florida 30 July 2004 Trigger Meeting CSC Beam Test (Muon Slice Test) ME.
Tridas Week, November 2000Darin Acosta1 Status of the CSC Track-Finder D.Acosta, A.Madorsky, S.M.Wang University of Florida B.Cousins, J.Hauser, J.Mumford,
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
13 March 2007G. Rakness (UCLA) 1 RPC efficiency in RAT Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
Electronics Review, May 2001Darin Acosta1 OPTICAL SP 1 Muon Sorter 3  / port card 3  / sector ME1 ME2-ME3 ME4 SR DT TF SP From CSC Port Cards MS MB1.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
Andrew Peck 1 CSC OTMB Firmware Meeting February 21, 2014 ALCT/TMB/RAT Test Stand at CERN Setting up complete duplicate of the ALCT-TMB-RAT test stand.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
22 Sept A slight reformulation of (ALCT) muonic timing… In terms of brass tacks.
PNPI / University of Florida Checking PC Timing Lev Uvarov CSC Time Synchronization Meeting May 12, 2009.
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
3 Nov 2009G. Rakness (UCLA)1 Weekend of 24 – 25 October Loaded all TMB firmware –Version 15 Oct 2009 XML file created using Jay’s muonic timing constants.
Recall: CFEB inefficiencies Collision Run June 2010G. Rakness (UCLA)1 validation/run135445/ExpressPhysics/Site/PNGS/hORecHits.png.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
EMu Slice Test -- Status Frank Geurts FNAL/Rice
10/20/09 UCLA Meeting Hauser 1/9 Various updates Update on LHC/CMS schedule: First shots into collimator: Nov. 7 and 8! Circulating beam ~Nov. 18, less.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
6 April 2007G. Rakness (UCLA) 1 CSC runs at minus side slice test 27 Mar – 5 Apr Color scheme: Successes Problems/questions Greg Rakness University.
Update on “Muonic Timing” of CSC Electronics
904 Status Recall last Group Meeting…
Timing/Synchronization Status
Update on CSC Endcap Muon Port Card
CSC EMU Muon Port Card (MPC)
University of California Los Angeles
University of California, Los Angeles Endcap Muon Purdue
“Golden” Local Run: Trigger rate = 28Hz
CMS EMU TRIGGER ELECTRONICS
University of California Los Angeles
Regional Cal. Trigger Milestone: Major Production Complete
Current Status of CSC Trigger Elements – Quick Summary
Darin Acosta University of Florida
September CSC Beam Test Report
CSC Trigger Primitives Test Beam Studies
CSC Trigger Muon Port Card & Sector Processor in production
New Calorimeter Trigger Receiver Card (U. Wisconsin)
University of California Los Angeles
Changes in Level 1 CSC Trigger in ORCA by Jason Mumford and Slava Valuev University of California Los Angeles June 11,
CSC Trigger Meeting Summary
Plans for the 2004 CSC Beam Test
CSC Electronics Problem Report CSCE I&C
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

13 March 2007G. Rakness (UCLA) 1 Minus side slice test status Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007

G. Rakness (UCLA) 2 0 th order goal: redo timing using MTCC version of firmware, software… compare with Hauser/Ignatenko spreadsheet document what is done: E-log personal (electronic) logbook will go to twiki page located at… eventually to end up as CMS note specify: “how-to” what is actually happening parameter inter-dependencies

13 March 2007G. Rakness (UCLA) 3 Definition of timing parameters for ALCT to match with CLCT at TMB: match_trigger_alct_delay and match_trigger_window_size By keeping match_trigger_alct_delay fixed and changing match_trigger_window_size, we determine:  In order to keep the ALCT valid pattern signal in the center of the matching window, match_trigger_alct_delay and match_trigger_window_size must move together… TMB sequencer (CLCT) trigger (?) ALCT “valid pattern” signal t=0 match_trigger_window_size match_trigger_alct_delay Using MTCC trigger and window size, we measure same value (6) as was used for MTCC… (noted last week…)

13 March 2007G. Rakness (UCLA) 4 Relative timing of Local Track Candidates from Muon Port Card to Sector Processor At each L1Reset: The MPC sends 128bx of negative signals to SP  The SP automatically times in these signals relative to each other scan was done (D. Holmes, Florida) to tell SP when to first start looking for the signals (i.e., shortest path)  Difference of this parameter to MTCC phase 2 was 3.5bx (consistent with 20m fiber shorter overall path…)  N.B. This parameter has no affect on SP (L1A) latency CCB MPC SP TTC 150m fiber (160m in MTCC)

13 March 2007G. Rakness (UCLA) 5 Definition of timing parameters of L1A signal receipt at TMB: tmb_l1a_delay and tmb_l1a_window_size By keeping tmb_l1a_delay fixed and changing tmb_l1a_window_size, we determine:  In order to keep the L1A in the center of the window, tmb_l1a_delay and tmb_l1a_window_size must move together… TMB pretrig (?)l1a arrives t=0 tmb_l1a_window_size tmb_l1a_delay

13 March 2007G. Rakness (UCLA) 6 Measurement of L1A timing at TMB HV on ME-2/2/17 only ALCT*CLCT pretrigger, ALCT*CLCT trigger (as at MTCC) tmb_l1a_window_size = 7 (as at MTCC) MTCC value = 157, we measure 150 Can we account for this? Expect -2bx due to (one way) fiber length reduction from 160m  150m Another handle? TTCrxCoarseDelay (delay for TTC signal into CCB) is set for a fiber length of 160m. If set correctly for a 150m fiber, this will add 2 to the delay of the L1A into the TMB, which is 2bx in the correct direction. Try to change parameter TTCrxCoarseDelay… no change! Under study… N.B. if it works, we will still be 3 bx off…

13 March 2007G. Rakness (UCLA) 7 Current status Chiller broke yesterday  NO LV power to peripheral crates or chambers Working again today, under investigation as to cause of failure…