Airbus vision of future ASAS Christophe MAILY – Airbus ASAS in a future ATM system Rome, April 2006.

Slides:



Advertisements
Similar presentations
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Advertisements

Service Technique de la Navigation Aérienne NexSAT: Mission Hypothesis 20 may, 2003 STNA/31 ATM issues at horizon 2015 over ECAC Capacity: - VHF spectrum.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OSED CARE-ASAS Activity 3: ASM Autonomous Aircraft OSED.
Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
Mission Trajectory Step 1 From planning to deployment.
SESAR TEN-T day. Content ●SESAR investments and timing ●Network effect ●Validation and certification activities ●Conclusion.
Episode 3 1 Episode 3 EX-COM D Final Report and Recommendations Operational and Processes Feasibility Pablo Sánchez-Escalonilla CNS/ATM Simulation.
NextGen GA Fund, LLC A Fund to Accelerate NextGen Equipage Benefits for the General Aviation Operator Community.
1 Data Link Roadmap Overview Mike Shorthose, Helios Technology Jorge Grazina, European Commission 25 September 2002.
SESAR and ASAS Opportunity
Applications from packages I to III
The Next Generation Air Transportation System “The Near Term and Beyond” Presented by Charles Leader, Director Joint Planning and Development Office.
Southampton 1 P Bradshaw EDXCW. Commercial Aircraft Conceptual Design - Some Considerations 15 th November 2005 P Bradshaw EDXCW Wing & Aerodynamics Skill.
6th Framework Programme Thematic Priority Aeronautics and Space.
Sense & Avoid for UAV Systems
Gate-to-Gate Project: Implementing Sequencing, Merging, and Spacing Captain Bob Hilb September 11, 2006.
CNS/ATM Overview Aramco 4/21/2017 1:46 AM
The SESAR Target Concept of Operations ASAS Related Aspects
Enav.it Channelling Finance and Innovation to Industry Steps towards the Air Traffic Management system modernisation.
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
FAA NAS Enterprise Architecture – Informing Future Challenges in V&V for NextGen 2009 V&V Summit November, 2009.
CRISTAL ATSAW Project Sep 2007 ASAS TN Christelle Pianetti, DSNA Simona Canu-Chiesa, Airbus.
Episode 3 EP3 WP6 - Excom - December 15th, Brussels 1 WP6 - Technology EP3 Final Report Technology results December 2009.
ASAS-TN Workshop Glasgow 11 September 2006 Alex Wandels CASCADE Programme Manager EUROCONTROL European Organisation for the Safety of Air Navigation CASCADE.
Aviation Safety in a changing world FSF MED MAY 2014 Airbus Product Safety Frédéric COMBES Head of Accident / Incident Investigation.
ASAS FRA OB/T ATM Projects Lufthansa point of view.
FAA System-Wide Information Management Program Overview for SWIM-SUIT Public Lauch Donald Ward Program Manager FAA SWIM Program April 2007.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
Draft High Level Operational Concept V0.4 Mode of Operation for the Single European Sky Deployable from /11/04.
ASIA PACIFIC Air Traffic Flow Management
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
4 th Workshop, Amsterdam, April 2007 G2G project G2G project : ASPA S&M experiments and main validation results Marinella Leone
Shaping Boeing Surveillance Strategy Drivers & Obstacles ASAS Thematic Network II.
Jean-Pierre DANIEL, Airbus at AIAA CANEUS 2004, Monterey CA, USA Structural Health Monitoring for Airliners from research to user requirements, a European.
ASAS WORKSHOP Roma April 2003 Airlines’ perspective Nicolas Zvéguintzoff Assistant Director- Technical / Financial Liaison – Europe.
ASAS-TN 3rd Workshop - Airbus ASAS Vision ASAS-TN 3 rd Workshop AIRBUS and Airborne Surveillance ASAS-TN 3 rd Workshop - Airbus and Airborne Surveillance.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
MFF is a EC co-funded programme Rome, 3-5 Aprili 2006 ASAS-TN2 Rome, 3-5 April 2006 Maurizio Zacchei, ENAV (MFF PM) Mediterranean Free Flight Programme.
Federal Aviation Administration AP23 : a snapshot on Package2 ASAS-TN2 Seminar 14 April Paris By Dragos Tonea, Eurocontrol Roberta Massiah, FAA.
A Vision Based on Achievable Expectations Jack Howell Director / Air Navigation Bureau Agenda Item 1.
1 Vince Galotti Chief/ATMICAO 26 March 2007 A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I FITTING THE PIECES TOGETHER.
Slide 1 July 2004 – FALBALA/WP5/FOR4/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Mark Watson & Richard Pugh ( NATS) CARE / ASAS Action FALBALA Project Dissemination.
Airbus Status on ADS-B In / Out Update
Aircraft Manufacturer Plans - Airbus Stéphane Marché – Airbus ASAS TN Glasgow, September 2006.
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
1 European Organisation for the Safety of Air Navigation Jan Van Doorn Director EUROCONTROL Experimental Centre April 2006 ASAS / ADS-B: Implementation.
By: R. Scott Stevens, ATO-P, Aviation Weather Office, Weather Policy & Requirements Group, WTIC Program Manager Date: October 9, 2008 Federal Aviation.
C-ATM User Group and ASAS…….. Presented on Behalf of the C-ATM User Group Billy Josefsson, LFV Group ASAS Thematic Network 2, Malmö /28.
Discussions Summary ASSTAR - Crossing & Passing session.
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
SSAP The European Strategic Safety Action Plan (SSAP) The History & Rationale.
Certification Considerations for the Implementation of ASAS Applications on Aircraft Kevin Hallworth: UK CAA ASAS-TN Seminar – October 2004.
Next Generation Air Transportation System Presentation to the Commercial Space Transportation Advisory Committee (COMSTAC) May 26, 2005 Robert A. Pearce.
ASAS TN Third Workshop, April 2004, Toulouse 1 Session 2 Functional and Technical issues and Solutions Chairperson : JC Richard Secretary : G Matrella.
ASAS Crossing and Passing Applications in Radar Airspace (operational concept and operational procedure) Jean-Marc Loscos, Bernard Hasquenoph, Claude Chamayou.
19-21 April 2004ASAS TN – 3 rd workshop AIRLINES/IATA OVERVIEW Needs and Considerations Anthony van der Veldt/IATA Assistant Director Safety Operations.
ASAS-TN 3rd Workshop - Airbus ASAS Status ASAS-TN 3 rd Workshop AIRBUS ASAS Status ASAS-TN 3 rd Workshop - Airbus ASAS Status Presented by : Patrick LELIEVRE.
The CASCADE Programme Blueprint for ADS-B Deployment ASAS-TN2 Workshop – Amsterdam April 2007 Christos Rekkas CASCADE Deputy Programme Manager, EUROCONTROL.
4 th Workshop, Amsterdam, 23 rd -25 th April 2007 ASAS-SEP Applications Airborne Implementation Overall Architectural Considerations.
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
International Civil Aviation Organization Overview of the Block Upgrades Concept Tai Feng Air Navigation Commissioner International Civil Aviation Organization.
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
ADS-B OUT - IATA VIEW ADS-B SITF/11 – Jeju, Korea 24 – 27 April 2012
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Chris Shaw, EUROCONTROL Experimental Centre
Ground System implication for ASAS implementation
Presentation transcript:

Airbus vision of future ASAS Christophe MAILY – Airbus ASAS in a future ATM system Rome, April 2006

© AIRBUS FRANCE S.A.S. Tous droits réservés. Document confidentiel. Page 2 ATM challenges Main challenges for ATM  significantly increase capacity (2-3 times) –Airbus market forecast & others –Enroute, Airports - use of 2 nd, 3 rd etc level airports, runways  increase the absolute level of safety  social acceptance – environment  improve predictability  improve robustness of user schedule  ensure global interoperability

© AIRBUS FRANCE S.A.S. Tous droits réservés. Document confidentiel. Page 3 Performance based ATM Full exploitation of aircraft capabilities CNS improvements are key enablers  There is a continuous evolution in aircraft performance –Precision navigation. i.e. the ability of the aircraft to operate more independently of the ground infrastructure and to navigate planned 3D/4D profiles with increasing precision. –Collaborative operation. i.e. the ability of the aircraft to increasingly communicate with the ATM system and to be increasingly aware of the surrounding operational environment. –Safe Operation: i.e. the ability of the aircraft to operate more independently of a local infrastructure and to rely on avionics systems that improve or complement the safety of the operations This does not imply autonomous operation  Using a dense, but defined route (‘tunnel’) network = capacity and efficiency  Execution of planned schedule = predictability and robustness  Less dependence on ground infrastructure

© AIRBUS FRANCE S.A.S. Tous droits réservés. Document confidentiel. Page 4 Major trends of avionics CNS evolutions CNS Enablers Navigation  Precise  Required Nav Perf Communication => Numerical => Required Com Perf Surveillance  ADS-B Traffic, Terrain, Weather, etc. Aircraft will fly more precise 3D routes within a denser network Aircraft operate more independently of ground infrastructure. Ground will be able to better predict trajectories (time => 4D) Controller/Pilot exchanges will be unambiguous, standardized, possibly complex and digital Aircraft trajectory predictions can be shared between air and ground More frequent usage of instructions relative to other traffic Flight crew will have enhanced situational awareness Some tasks will be transferred to flight crew

© AIRBUS FRANCE S.A.S. Tous droits réservés. Document confidentiel. Page 5 Airbus views on ASAS role in future ATM Main enablers of capacity improvement :  Increased navigation performance –Sequencing, synchronisation, transitioning between routes  Collaborative and safe operation Conditions :  Airspace optimised to use new navigation capabilities  Collaborative processes (airline, ATC, aircraft) to ensure predictability  Adequate tools to assist controller monitoring  Delegation of tasks/responsibilities to the flight crew ASAS is also a key enabler  for specific situations (e.g. sequencing&merging in approach)  to relieve controllers from their tactical tasks

© AIRBUS FRANCE S.A.S. Tous droits réservés. Document confidentiel. Page 6 ADS-B Airbus roadmap 1. ADS-B Out A/C information broadcasted for ground use in a first step ADS-B ADS-B Receiver Air Traffic Control ADS-B 2. ATSAW Display of other aircraft ADS-B Info in the cockpit AAL  3. SPACING A/C instructed to maintain Spacing with target aircraft AFR6512 A320 M SEPARATION A/C instructed to maintain Separation with other aircraft

© AIRBUS FRANCE S.A.S. Tous droits réservés. Document confidentiel. Page 7 ADS-B Roadmap – Industrial aspects Mode S 1090? TCAS with ADS-B-in Displays FMSFMS APAP Spacing 3 rd step Spacing Dev Cycle > 3 years after launch ATSAW 2 nd step ATSAW Dev Cycle 2 years after launch TCAS with ADS-B-in Mode S 1090 DisplaysDisplays ADS-B Out 1 st step ADS-B Out Today Mode S 1090 Separation 4 th step Separation ??? ??????

© AIRBUS FRANCE S.A.S. Tous droits réservés. Document confidentiel. Page 8 1 st step: ADS-B OUT Airservices Australia, Eurocontrol, CASA, Honeywell, ACSS, Collins, and Airbus  Support initial ADS-B out certification and operations based on existing equipage (DO-260) as long as they satisfy the safety, performance and interoperability requirements –No retrofit –Solution available in a short term period –Reduced cost for airlines, XPDR suppliers and Airbus. Target date for certification on Airbus aircraft: end 2006  Hypothesis: existing equipment accepted for NRA application (i.e. EASA/RFG)  Airbus certification schedule based on Australian needs

© AIRBUS FRANCE S.A.S. Tous droits réservés. Document confidentiel. Page 9 Need for certification of ADS-B OUT capability NRA in Australia  Implementation of 5Nm separation en-route using ADS-B OUT 1090 MHz (NRA Application) from end 2006  Jet Star A320 already separated with ADS-B OUT (based on their current equipage)  Mandate planned Ground applications (NRA, RAD) foreseen in other places  Mediterranean region  Asia/pacific e.g. Nouvelle Calédonie, New Zealand, etc  Indian Ocean e.g. La Réunion  Gulf of Mexico

© AIRBUS FRANCE S.A.S. Tous droits réservés. Document confidentiel. Page 10 2 nd Step: ATSAW ATSAW is achievable in the short term  Less demanding (cert level, ADS-B performance data)  Existing ADS-B Out seems sufficient Promising benefits  Oceanic : Fuel burn reductions  Visual approaches (e.g Frankfurt, USA) : Capacity increase  Surface : Enhanced safety  In all environments => Enhanced safety ATSAW will help gaining experience (flight crew, technical) on ASAS Target date for certification on Airbus aircraft: end 2008

© AIRBUS FRANCE S.A.S. Tous droits réservés. Document confidentiel. Page 11 3 rd step: Spacing Sequencing & Merging S&M has promising benefits Airspace redefinition needed before S&M to  Anticipate merging and sequencing  Take advantage of aircraft navigation capabilities  Provide early benefits even before S&M is implemented Automatic guidance is a must for routine operations  Design feasibility to be assessed  Certification level to be determined Standardization material to be completed Regulatory aspects to be defined (responsibilities, time based separation) Aeronautical community to gain from UPS experience (Merging&Spacing)

© AIRBUS FRANCE S.A.S. Tous droits réservés. Document confidentiel. Page 12 4 th step: Separation & Self Separation ASAS Separation is in the Airbus roadmap  At first where FMS Predictions are not required (e.g. Sequencing, not Merging)  CDTI Approach Visual Separation (transient traffic visually lost)  SEP – Sequencing, SEP – ITP, etc. But Self separation requires much more R&T for a decision to be made  Concept issues –Concept leads to unpredictability => Future ATM needs predictability –Transition between FFAS and MAS may generate more problems than it solves –Recovery procedures unclear  Technical issues –Today, FMS Predictions for strategic use only –Integrity of own predictions to be determined –Integrity of other predictions –Interval of prediction update not deterministic (average is 15 sec) –Level of certification => Radical change in architectures  Major modifications not justified by low density airspace operations

© AIRBUS FRANCE S.A.S. Tous droits réservés. Document confidentiel. Page 13 How to support the changes CASCADE pragmatic approach is an example  Work-programme priorities driven by concrete implementation plans  Standardization : Worldwide interoperability is a must  Validation / Implementation : Federate European efforts SESAR shall provide  Commitment for medium term changes –Institutional & Process –Necessary enablers  Funding mechanisms –Some infrastructure enablers may have long return on investments

© AIRBUS FRANCE S.A.S. Tous droits réservés. Document confidentiel. Page 14 ADS-B OutCPDLCRNP Conclusion ASAS is a key enabler to future ATM but ASAS is not the unique magic solution We need dreams and long term visions but Dreaming of the future should not delay intermediate steps Others?ATSAWAir/grd trajectory sharing Advanced ASASCollaborative processes Enhanced ATM processes

© AIRBUS FRANCE S.A.S. Tous droits réservés. Document confidentiel. Page 15 The content of this document is the property of AIRBUS FRANCE. It is supplied in confidence and commercial security on its contents must be maintained. It must not be used for any purpose other than that for which it is supplied nor may information contained in it be disclosed to unauthorised persons. It must not be reproduced in whole or in part without permission in writing from AIRBUS FRANCE. The statements made herein do not constitute an offer. They are based on the assumptions shown and are expressed in good faith. Where the supporting grounds for these statements are not shown, the Company will be pleased to explain the basis thereof.