CIRED 2011RT 5b TSO-DSO co-ordination of planning for wind connections Tony Hearne Manager, Renewable Planning ESB Networks.

Slides:



Advertisements
Similar presentations
July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
Advertisements

Programme Tx / Dx Demarcation Feb 08. Programme Topics cover in this presentation Back Ground Existing and future MTS substations Lines.
FUI Feedback on PCG Target Model and roadmap propositions FUI Stakeholder Group Meeting Paris, 4 th November 2009 These comments reflect the general views.
Distributed Generation (DG)
East West Interconnector Background Security Of Supply Promote Competition in The Electricity Sector Accommodate Growth Of Renewable Energy Reduce Dependence.
Grid Issues Charles Davies Commercial Director, National Grid Company British Wind Energy Association April 2002.
The research leading to these results has received funding from the European Community's Seventh Framework Programme (FP7/ ) under grant agreement.
Grid Connections: Now and the Future Patrick Smart Head of Commercial and Regulatory 10 th November 2010.
Electricity interconnectors – next generation Martin Crouch Future Energy Strategies seminar 3 July 2012.
July 2003 Structure of Electricity Distribution Charges Welcome and Introduction Charles Gallacher Deputy Director, Scotland.
Brief on HVDC 2015 Brief on HVDC 2015
Frankfurt (Germany), 6-9 June 2011 Coordination between TSOs and DSOs – a necessity for system planning and operation Dr. Ralph Pfeiffer Amprion GmbH 1.
GENFLEX TARIFF AND INCOPORATION OF THE MEC INTO THE NMD RULES
Towards Regional Independent Operators – a main driver for successful market integration.
Wind Power in Ireland: Treatment of wind in the Single Electricity Market APEx Conference, Paris 16 th October 2007.
Errol Close Decarbonisation Policy and Co-ordination IWFA May Conference.
Marek Kras. A combined cycle gas turbine power plant, frequently identified by CCGT shortcut, is essentially an electrical power plant in which a gas.
© ABB SG_Presentation_rev9b.ppt | 1 © ABB SG_Presentation_rev9b.ppt | 1 Smart Grid – The evolution of the future grid Karl Elfstadius,
NATIONAL GRID Market Evolution in Ireland APEX 2004 Annual Conference Ann Scully Manager, Market Operations ESB National Grid.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
ESB Presentation Oireachtas Committee 2 nd November 2005.
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
Frankfurt (Germany), 6-9 June 2011 Valentinetti – IT – S6 – 0838 The recharging infrastructure to support the mobility development in Italy optimising.
Book Reference : Pages To understand how electricity is distributed in the UK via the National Grid 2.To understand how transformers are used.
DC Superconductor Cables for Long Distance Transmission 2009 Mid-America Regulatory Conference Traverse City, MI June 14-17, 2009.
South African Wind Energy Programme A Otto 2 nd Annual Wind Energy Seminar 28 September 2010, Gallagher.
Frankfurt (Germany), 6-9 June 2011 ENEL Group Italian core European base Worldwide strategy Italy’s largest power company. Europe’s second listed utility.
Mantychore Oct 2010 WP 7 Andrew Mackarel. Agenda 1. Scope of the WP 2. Mm distribution 3. The WP plan 4. Objectives 5. Deliverables 6. Deadlines 7. Partners.
Frankfurt (Germany), 6-9 June 2011 ARCHITECTURE AND FUNCTIONAL SPECIFICATIONS OF DISTRIBUTION AND TRANSMISSION CONTROL SYSTEMS TO ENABLE AND EXPLOIT ACTIVE.
Frankfurt (Germany), 6-9 June 2011 Presenter: Mahdi Kiaee Supervisors: Dr. Andrew Cruden and Professor David Infield The University of Strathclyde, Glasgow.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.
© 2008 OSIsoft, Inc. | Company Confidential Smart Grid, Smart Metering and DSM OSIsoft and Cisco systems Arjen Zwaag- Cisco Martin Otterson- OSIsoft.
Frankfurt (Germany), 6-9 June 2011 W. Niederhuemer – Austria – RIF Session 4 – Paper PROBABILISTIC PLANNING FOR A HIGHER INTEGRATION OF WIND TURBINES.
Market Design of SE Europe: Reflections from the 3rd Forum on the Way Forward 6 th Permanent High Level Group Meeting Athens, 07 December 2003.
Key Industry Challenges Regulatory Perspective Michael G. Tutty Chairman Commission for Energy Regulation 13 October
W. Schufft: Challenges for electrical power engineering IP 2007, Pernink Challenges for Electrical Power Engineering.
Frankfurt (Germany), 6-9 June 2011 MARTENSEN – DE – Session 4 – 1221 The Cell Controller Pilot Project (CCPP): From Surviving System Black-Out to Market.
1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
Frankfurt (Germany), 6-9 June 2011 Fabio Cazzato, Simone Botton, Marco Di Clerico – Enel Distribuzione SpA Simone Botton – Italy – Session 4 – Paper ID.
Renewables Integration Development Project North West of the Island of Ireland Louis Fisher, EirGrid.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Frankfurt (Germany), 6-9 June 2011 Iiro Rinta-Jouppi – Sweden – RT 3c – Paper 0210 COMMUNICATION & DATA SECURITY.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
The Central Role of the Network Operators 28 March 2007 ERGEG-GTE Meeting.
Market Systems Release Update Modifications Committee Meeting 65 December 3rd
Frankfurt (Germany), 6-9 June 2011 Improving the data quality of the LV-connectivity Intro Problem statement  What  Why Proposed solution Case Conclusion.
June 2008 Windsor-Essex Electrical Service Needs and Solutions.
ACCESS TO THE GRID Vaida Tamašauskaitė Power System Planning Division Power System Development Department Lietuvos energija AB Ryga, 3 July, 2006.
Development of System Operation Network Codes ACER Workshop 24 August 2011 Ole Jan Olesen, Convenor ENTSO-E Working Group on European Operational Standards.
Outage Planning Subcommittee Mark Wilson. Outage Planning Subcommittee Created to address Market Participant concerns with existing rules and procedures.
Distributed Generation Registration June 30, 2008.
Delivering for 2020 TSO Facilitation of Renewables Studies EirGrid Customer Conference Jonathan O’Sullivan October 2009.
Distribution Systems-General
Philippine Feed-In Tariff System Implementation 1.
Renewable Energy Act of 2008
Linnfall Consulting Market design: the energy-only market model Linnfall Consulting September 2015.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Contestability Working Group Consultation Report and Recommendations NIE Networks / SONI Joint Presentation 26 January 2016.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
EgyptEra 1 Market Reform By: H. Waheed. 2 Objectives Of Regulatory Agency  Regulates and supervises all electricity generation, transmission, and distribution.
Getting a Grid Connection to Export Power Energy in Agriculture rd August 2016.
Electricity is produced at the power station.
ESB Networks AIP Programme
Electricity Distribution Network Design Training & Courses
Norwegian experience from re-regulating the power sector
IWEA Offshore Wind Conference 2019 – Developer Led ‘v’ Centralised Grid Connections 12th September 2019.
Presentation transcript:

CIRED 2011RT 5b TSO-DSO co-ordination of planning for wind connections Tony Hearne Manager, Renewable Planning ESB Networks

Frankfurt (Germany), 6-9 June 2011 Topics  Utility Landscape in Ireland  Wind situation in Ireland  Group processing  Gate 3  Conclusions

Frankfurt (Germany), 6-9 June 2011 Topics  Utility Landscape in Ireland  Wind situation in Ireland  Group processing  Gate 3  Conclusions

Frankfurt (Germany), 6-9 June 2011 Main Players in Ireland  Regulator  Transmission System Operator  Transmission System Planner  Distribution System Operator  Distribution System Planner  Transmission and Distribution Asset owner  CER  EirGrid  ESB Networks  ESB Networks  ESB

Frankfurt (Germany), 6-9 June 2011 System Operator Structures ESB Group Generation- Customer supply Consultancy Eirgrid PLC TSO Plan Tx network Contol access to Tx network Operate Tx network SEMO Operate wholsale energy market ESB Networks Ltd TAO DAO DSO

Frankfurt (Germany), 6-9 June 2011 Transmission 6,300 km of Overhead Network 6,300 km of Overhead Network 140km of Underground Cables 140km of Underground Cables 165 HV Stations 165 HV Stations €1B RAB Value Distribution 160,000 km of Lines/Cables 160,000 km of Lines/Cables 630 HV Substations 630 HV Substations 230,000 MV Transformers/Units 230,000 MV Transformers/Units 2m meters 2m meters €5B RAB Value Transmission 400kV220kV110kV 38kV MV 20 kV & 10 kV Distribution LV 400 & 230 V 110kV 220kV 400kV 20kV 10kV

Frankfurt (Germany), 6-9 June 2011 Topics  Utility Landscape in Ireland  Wind situation in Ireland  Group processing  Gate 3  Conclusions

Frankfurt (Germany), 6-9 June 2011

Wind Connections MW 1460 MW c System Demand 2020

Frankfurt (Germany), 6-9 June 2011

History to date Up to 2003 applications for connection of wind to both System Operators were processed sequentially Since 2004, following a moratorium on wind connections, such is the volume of applications in the queue, that a Group Processing Approach [GPA] was the only practical way forward. They are now processed in batches known as Gates GateSize [MW]Year Take up of offers % % Offers issue nearing completion

Frankfurt (Germany), 6-9 June 2011 Connected: Blue In Progress: Red Being Quoted: Green

Frankfurt (Germany), 6-9 June 2011 Topics  Utility Landscape in Ireland  Wind situation in Ireland  Group processing  Gate 3  Conclusions

Frankfurt (Germany), 6-9 June 2011 Example of Sequential Approach 110kV 38kV MV 110/38kV Stn 38kV/MV Stn 38kV

Frankfurt (Germany), 6-9 June kV 38kV MV ? 110/38kV Stn 38kV/MV Stn 38kV Example of Sequential Approach

Frankfurt (Germany), 6-9 June kV 38kV 110/38kV Stn 38kV/MV Stn 110kV 38kV Example of Group Approach

Frankfurt (Germany), 6-9 June 2011 Sequential processing  Large applicants tend to apply to TSO, smaller ones to DSO  The connection method is determined solely on the basis of their connection  Applicants pay for their dedicated works  Interracting offers can cause withdrawal of offers already in train Group Processing  Applications are processed by the SO most suited to their Group connection irrespective of which SO they originally applied to.  The connection method is determined by the Least Cost technically Acceptable [LCTA] method for the defined sub-group  Applicants pay in full for their dedicated shallow works and a per MW share of shared shallow works  No Interaction issues within Gates

Frankfurt (Germany), 6-9 June 2011 General operation of a “Gate”  Regulator [with input from both System Operators and wind industry] determine criteria for eligibility for inclusion of “Gate”  TSO and DSO jointly apply criteria to the “Queue” of application  Queue comprises both DSO and TSO applicants  Result: Make up of “Gate” is determined

Frankfurt (Germany), 6-9 June 2011 Gate 1 vs Gate 2  Gate 1: 370MW: purely date order  Gate 2: Date order plus element of System optimisation First 500MW in Queue “driver” Applications that share a LCTA shallow connection with “driver” Extensions to existing installations Outliers with interactions <10MW at 110kV node Resulting size circa 1385MW

Frankfurt (Germany), 6-9 June 2011 Topics  Utility Landscape in Ireland  Wind situation in Ireland  Group processing  Gate 3  Conclusions

Frankfurt (Germany), 6-9 June 2011 Implementation of Gate 3  The implementation of Gate 3 required very close collaboration between CER, TSO and DSO.  The following slides will endeavour to explain the steps, mechanisms and features involved NetworkMW Number of Connections Distribution Transmission205028

Frankfurt (Germany), 6-9 June 2011 Size of Gate 3 22

Frankfurt (Germany), 6-9 June : Eligibility criterion  Full consultation held with industry and stakeholders  Result: Date order of applications the clear preference from the wind industry  CER Direction issued to System Operators including MW size of the Gate  Implementation commences  Unified “queue” formed by combining separate SO queues  Cut-off criterion applied In Out

Frankfurt (Germany), 6-9 June 2011 What next?  Now we know who is in and out!  To begin their studies, TSO need to know how much generation will present at their transmission nodes  In order to inform this, DSO would normally carry out full studies on the smaller applicants to determine which transmission node  To shorten timeframe as much as possible it was necessary to frontload the node assignments

Frankfurt (Germany), 6-9 June : Node Assignments  Banded rule-set devised based upon distance to nearest distribution primary sub-station  Clauses put in place to define “nearest”  Result: Transmission sub-groups formed Application Capacity Node Rule Less than 5 MWNearest 38 kV 5 MW – 10 MWNearest 38 kV or 110 kV 10 MW – 40 MWNearest 110 kV 40 MW – 177 MWNew 110 kV Greater than 177 MW New 220 kV or 400 kV Tx Node 1 Tx Node 2

Frankfurt (Germany), 6-9 June 2011 DSO and TSO DSO TSO Gate 3 General TSO-DSO Process Node Assignment Establish Tx Firm Access Quantities Determine Distribution connection methods Report to TSO Tx SC and other studies Connection Agreement Issue DSO offers Issue Tx offers

Frankfurt (Germany), 6-9 June 2011 ◦ Transmission System Operator calculates additional capacity available at each node for each future year. ◦ Available capacity allocated based on application date-order ◦ Each Gate 3 application will have a Scheduled Firm Access Quantity for each year from 2010 to 2025, taking account of grid reinforcements and other new generation ◦ Thus, transmission reinforcement based on approved development strategy leads the wind generation connections. Transmission Firm access quantities

Frankfurt (Germany), 6-9 June 2011  Takes account of: demand growth renewable generation to meet targets conventional generation development future DC interconnections with UK or Europe.  Will require ~ 1,150 km new transmission ~ 2,300 km upgrades Grid development strategy to

Frankfurt (Germany), 6-9 June 2011 Project Planning  Country divided in to ”Areas” for transmission study purposes  Detailed offer issuance Project Plan agreed between TSO, DSO and CER.  Project Plan published

Frankfurt (Germany), 6-9 June 2011 Communications  Gate 3 Liaison Group meeting chaired by Regulator Attended by both SO ‘s and representatives of all industry stakeholders SO’s report on progress per workplan Other issues discussed as they emerge  Customer connection meetings Held once distribution connection methods signed off  TSO-DSO bi-lateral meetings Held bi-monthly or weekly

Questions ?

Frankfurt (Germany), 6-9 June 2011 Conclusions  The circumstances in Ireland lend themselves to the TSO- DSO-Regulator approach outlined above  Facilitates large quantities of Renewable Energy being processed in a structured manner  Transmission and Distribution systems developed in co- ordinated fashion  Certainty of offer issuance to those in the Gate  Rationalises the allocation of scarce capacity