HES-HKS & KaoS meeting 2Apr2012 T.Gogami SURA residence facility
Contents OPERA machine
JLab trip 3/6 – – First half Preparing OPERA machine (IT help desk) GEANT (SPL + ENGE) Analysis meeting (3/7) Meeting with Jay (3/7, 3/9) – Last half ODH, Rad Worker1 Preparing OPERA machine (IT help desk, Steve, Tang, Han) – 3/15 PC arrived – 3/16 JLab domain – 3/17 OPERA installation CAD (3/ ) – Old SPL + HKS (check) – Old SPL + ENGE (modify) Meeting with Jay + Chiga (3/16) – OPERA installation – Strategy – Free discussion JLab user town meeting (3/16) OPERA (TOSCA) (3/16 – 20) – Old SPL modeling – Old SPL + HKS Res fac.
OPERA machine 置き場所 – CEBAF Center F306 の窓際 スペック – メーカー : ASUS – CPU : Intel(R) Core(TM) 3.4GHz – プロセッサの数 : 8 – メモリ : 2 x 4 = 8GB – HDD : 750GB OS – Red Hat Enterprise Linux Workstation release 6.2 (Santiago) Wiki : tfarm1 thk
OPERA manager インストーラ : 参照
licensing
Modeling OPERA (modeler)
What we need to give to Jay Model of – Old SPL – Old SPL + ENGE (tilted) Final geometrical information
Things to do Before HES-HKS collaboration meeting (5/9) – More reliable initial matrix for old SPL + ENGE New GEANT (almost done) + better TOSCA calculation – Missing mass Kawama and Chunhua matrices – HES tracking code Chi square distribution, residuals, x-t relation….
END