HES-HKS & KaoS meeting 2Apr2012 T.Gogami SURA residence facility.

Slides:



Advertisements
Similar presentations
Tracking for high multiplicity event (E05-115) & E GEANT4 simulation 14/Dec/2011 School of science, Tohoku University Toshiyuki Gogami ( 後神 利志 )
Advertisements

MMT Real-Time-Reconstructor. Hardware CPU: Quad-core Xeon 2.66 GHz RAM: 2GB OS: CentOS with RTAI real-time extensions Frame Grabber: EDT PCI-DV.
 Contents 1.Introduction about operating system. 2. What is 32 bit and 64 bit operating system. 3. File systems. 4. Minimum requirement for Windows 7.
Prepared by: Nor Zuraida Bt Mohd Gaminan Department of IT & Communication Politeknik Tuanku Syed Sirajuddin Chapter 1 Introduction to Operating System.
Circle Detection Compression and Security of Surveillance Videos 張晏豪.
DIRAC API DIRAC Project. Overview  DIRAC API  Why APIs are important?  Why advanced users prefer APIs?  How it is done?  What is local mode what.
HES-HKS & KaoS meeting Toshi Gogami 5/June/2012 Hall-C.
1 RH033 Welcome to RedHat Linux. 2 Hardware Requirements ♦ Pentium Pro or better with 256 MB RAM ♦ Or ♦ 64-bit Intel/AMD with 512 MB RAM ♦ 2-6 GB disk.
6/1/2010 T.Gogami.  chi-square (rev.415)  number of event ratio  multiplicity vs. chi-square  52 Cr  CH 2 target  multiplicity vs. MM for 52 Cr.
VMWare Workstation Installation. Starting Vmware Workstation Go to the start menu and start the VMware Workstation program. *Note: The following instructions.
CBT Implementation on the Berkeley Campus Jack McCredie Associate Vice Chancellor Information Systems and Technology University of California, Berkeley.
Operating Systems AOIT Principles of Information Technology.
Medium heavy Λ hyper nuclear spectroscopic experiment by the (e,e’K + ) reaction Graduate school of science, Tohoku University Toshiyuki Gogami for HES-HKS.
HES-HKS & KaoS meeting Toshi Gogami 5/July/2012. Contents SPL + ENGE Gogami spectra (Λ,Σ 0, 12 Λ B) Level 1.
Service Review and Plans Carmine Cioffi Database Administrator and Developer 3D Workshop, Barcelona (ES), April 2009.
Implementing KFS Release 2 (Let’s Get Cookin’!) Susan Moore / Jonathon Keller, UC - Davis Vince Schimizzi / Mike Criswell, MSU.
HLAB meeting 25 Jan 2011 T.Gogami E experimental setup in JLab Hall C (2009)
HKS Analysis Status Report HKS Analysis Status Report Liguang Tang (Hampton/JLAB) Hall C User Meeting, Jan. 15, 2011 HKS has data taken in 2005 (E01-011)
Hosted Virtualization Lab Last Update Copyright Kenneth M. Chipps Ph.D.
Computing Group SAC 2013 Scientific Sector Salman Matalgah & Mostafa Zoubi 1Salman Matalgah SAC 2013.
HES-HKS & KaoS meeting Toshi Gogami 18/Oct/2012. HYP2012 at Barcelona, Spain 10/1 – 10/5 HYP /5 – 10/6 JSPS Core-to-Core symposium 10/9 came back.
Grid MP at ISIS Tom Griffin, ISIS Facility. Introduction About ISIS Why Grid MP? About Grid MP Examples The future.
DB Installation and Care Carmine Cioffi Database Administrator and Developer ICAT Developer Workshop, The Cosener's House August
6/26/01High Throughput Linux Clustering at Fermilab--S. Timm 1 High Throughput Linux Clustering at Fermilab Steven C. Timm--Fermilab.
JLab hypernuclear collaboration meeting / JSPS Core to Core Seminar Study of elementary process in Hall-C p(γ*,eK + )Λ/Σ 0 9May2012 – 11May2012 Department.
E Analysis update Adjust of the Splitter-HKS Side Yuncheng Han May 09, 2012 Hampton University JLab hypernuclear collaboration meeting.
JLab hypernuclear collaboration meeting / JSPS Core to Core Seminar TOSCA models for ENGE and other spectrometers 9May2012 – 11May2012 Department of Physics,
IT320 OPERATING SYSTEM CONCEPTS Unit 3: Welcome to Linux June 2011 Kaplan University 1.
IT320 OPERATING SYSTEM CONCEPTS Unit 3: Welcome to Linux September 2012 Kaplan University 1.
HES-HKS & KaoS meeting Toshi Gogami. Contents Energy loss simulation by HES,HKS and POSI 1.POSI for beam energy loss – Harver foil is already implemented.
26/4/2001LAL Site Report - HEPix - LAL 2001 LAL Site Report HEPix – LAL Apr Michel Jouvin
 Linux Mint is a computer operating system designed to work on most modern systems, including typical x86 and x64 PC’s. Linux Mint can be thought of.
HES-HKS & KaoS meeting Toshi Gogami 26June June2013.
JLab hypernuclear collaboration meeting / JSPS Core to Core Seminar Analysis Status of Heavy targets data of HES-HKS 9May2012 – 11May2012 Department of.
Analysis strategy of high multiplicity data Toshiyuki Gogami 24/Feb/2011.
Made By: Micheal Mouner Linux VS Windows. Agenda.
5 June 2003Alan Norton / Focus / EP Topics1 Other EP Topics Some 2003 Running Experiments - NA48/2 (Flavio Marchetto) - Compass (Benigno Gobbo) - NA60.
HES HKS meeting 24 Sep 2010 Toshiyuki Gogami 9/4/2010 in Prague, Czech.
HES-HKS & KaoS meeting 15/July/2011 T.Gogami Wiesbaden のお風呂はこんな感じでし た.
HES-HKS & KaoS meeting Toshi Gogami 27/June/2012.
HES-HKS & KaoS meeting Toshi Gogami 11/July/2012.
HES-HKS & KaoS meeting 1Nov2013 Toshi Gogami 2009 年の今頃.
Isecur1ty training center Presented by : Eng. Mohammad Khreesha.
HES-HKS & KaoS meeting 19/June/2012 Toshi Gogami.
Xilinx Confidential Unpublished Work © Copyright 2012 Xilinx ZYNQ PetaLinux Guide.
HES HKS meeting 15/June/2011 T.Gogami. Contents HKS tracking efficiency Tracking residual Λ/Σ 0 issue (CH 2 /H 2 O)
Status report - Tracking code - T.Gogami 9/30/2010.
HES-HKS & KaoS meeting 24/Feb/2014 Toshi Gogami. Contents 12 Λ B cross section Comparison with Motoba-san’s calculation Acceptance Linearity after matrix.
HES HKS meeting 1 Nov 2010 T.Gogami E experimental setup in JLab Hall C (2009)
HES-HKS & KaoS meeting 21/Oct/2011 Toshi Gogami 11/Mar/2010, E End-Run Party at Kappo Nara, Newport News, US.
HES-HKS & KaoS meeting. Contents Different distorted initial matrices Distorted matrix sample 6 (dist6) Distorted matrix sample 7 (dist7) Distorted matrix.
HES-HKS analysis meeting 30 Aug 2013 Toshiyuki Gogami.
Step by Step to make an app Gordon Eccleston
Professor: Nabil Elmjati IB100 Introduction to computer Sciences.
HES-HKS & KaoS meeting 1/Mar/2012 Toshi Gogami. Contents TOSCA.
IT320 Operating System Concepts
Brain Buster Solve for w, x, and y Multiply.
Matt Lemons Nate Mayotte
Selected topic in computer science (1)
Parallelized JUNO simulation software based on SNiPER
StreamNetTM Soft Decoder – VIEW Multimedia Receiver (VMR) 1/21/2013.
Hadoop Clusters Tess Fulkerson.
تدريس يار: ميثم نظرياني
Reservation Assistant
Complete the missing numbers using the inverse.
ALICE-Grid Activities in Bologna
SOFTWARE TECHNOLOGIES
Implementing KFS Release 2 (Let’s Get Cookin’!)
Cluster Computers.
Presentation transcript:

HES-HKS & KaoS meeting 2Apr2012 T.Gogami SURA residence facility

Contents OPERA machine

JLab trip 3/6 – – First half Preparing OPERA machine (IT help desk) GEANT (SPL + ENGE) Analysis meeting (3/7) Meeting with Jay (3/7, 3/9) – Last half ODH, Rad Worker1 Preparing OPERA machine (IT help desk, Steve, Tang, Han) – 3/15 PC arrived – 3/16 JLab domain – 3/17 OPERA installation CAD (3/ ) – Old SPL + HKS (check) – Old SPL + ENGE (modify) Meeting with Jay + Chiga (3/16) – OPERA installation – Strategy – Free discussion JLab user town meeting (3/16) OPERA (TOSCA) (3/16 – 20) – Old SPL modeling – Old SPL + HKS Res fac.

OPERA machine 置き場所 – CEBAF Center F306 の窓際 スペック – メーカー : ASUS – CPU : Intel(R) Core(TM) 3.4GHz – プロセッサの数 : 8 – メモリ : 2 x 4 = 8GB – HDD : 750GB OS – Red Hat Enterprise Linux Workstation release 6.2 (Santiago) Wiki : tfarm1 thk

OPERA manager インストーラ : 参照

licensing

Modeling OPERA (modeler)

What we need to give to Jay Model of – Old SPL – Old SPL + ENGE (tilted) Final geometrical information

Things to do Before HES-HKS collaboration meeting (5/9) – More reliable initial matrix for old SPL + ENGE New GEANT (almost done) + better TOSCA calculation – Missing mass Kawama and Chunhua matrices – HES tracking code Chi square distribution, residuals, x-t relation….

END