US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers St. Paul District Channels & Harbors Project Presentation for 2012 WEDA Midwest.

Slides:



Advertisements
Similar presentations
MOBILE DISTRICT FY 2007 DREDGING PROGRAM MOBILE DISTRICT FY 2007 DREDGING PROGRAM US Army Corps of Engineers Mobile District US Army Corps of Engineers.
Advertisements

CORPS OF ENGINEERS DREDGING INFORMATION n Corps of Engineers Dredging Information System (DIS) n Tracks Corps Performed and Contracted Dredging n Pre-bid.
Corps of Engineers ® San Francisco Engineer District 12 June 2008 Harbor Safety Committee Slide 1 “ASSESSMENT AND REPORTING OF ACOUSTIC CLEARANCE SURVEYS.
UMR = Balance of Environment and Transportation 1. Pool # 8 - Environmental Management Project 2. Transportation Route – human habitation & settlement.
US Army Corps of Engineers Philadelphia District Scheduled FY 07 Dredging Work FY 07 Dredging Workin Philadelphia District Philadelphia District.
Fox River Cleanup Operable Units Fox River Cleanup Total river 39 miles long, OU 2 – 5 is about 13 miles PCB contamination Combined Remedy: Prospective.
OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.
US Army Corps of Engineers BUILDING STRONG ® PNWA Conference Update COLONEL Jose Aguilar District Commander Portland District 2 October, 2014.
US Army Corps of Engineers Portland District Fiscal Year 2007 NWP Dredging Plan Including: The Columbia River Channel Improvement Project (CRCI)
U. S. Army Corps Of Engineers Memphis District November 16, 2007.
TAMPA HARBOR CONSTRUCTION PROJECTS, Big Bend Channel Alafia River Channel Port Sutton Channel TAMPA HARBOR CONSTRUCTION PROJECTS, Big Bend Channel Alafia.
Preparing for the Rainy Season SFWMD Operations & Actions.
US Army Corps of Engineers BUILDING STRONG ® RIVER RESOURCES ACTION TEAM BOAT TRIP Upper Mississippi River (Pools 24, 25, and Mel Price) St. Louis District.
RRAT – Dredging Update  Gilbert Island Post Construction  Flex Pipe Update  Flex Pipe use  2014 Dredging Update  Dredge Master Plan.
US Army Corps of Engineers BUILDING STRONG ® St. Louis District Dredging Lance Engle Dredging Project Manager St. Louis District WEDA – Midwest 2012.
Civil Works Baltimore District River and Harbor Projects.
Port of Hood River Waterfront Recreation Committee Hood River Delta Historical Overview Existing Conditions Future Changes.
JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING.
JACKSONVILLE DISTRICT 5 Year NEW WORK DREDGING PROGRAM JACKSONVILLE DISTRICT 5 Year NEW WORK DREDGING PROGRAM NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
PHILADELPHIA DISTRICT 2008 – 2012 DREDGING PROGRAM.
US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013.
US Army Corps of Engineers BUILDING STRONG ® Eastern Shore Navigation Partnership Meeting “ A Unified Voice for Navigation, Project Prioritization, and.
Water Resources Report Rob Montgomery River Flow & Lake Levels TMDL Study Floodplain mapping revisions Dredging 101.
Presenter Name Presenter Title Duty Location Date of Presentation US Army Corps of Engineers BUILDING STRONG ® US Army Corp of Engineers BUILDING STRONG.
One Corps Serving the Armed Forces and the Nation Navigation Lock and Dam Inspection and Emergency Repairs Workshop April 2006 Mel Price – Auxiliary.
U.S. Army Corps of Engineers Savannah Harbor Expansion Project Savannah Harbor Expansion Project.
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
Planning for Restoration of the Mississippi River in the Twin Cities Christian Lenhart.
Assessing the feasibility of reestablishing ecosystem processes on the Mississippi River in the Twin Cities, Minnesota Christian Lenhart 1, John L. Nieber.
NAD/SAD REGIONAL DREDGING MEETING/WEDA WILMINGTON DISTRICT
CHARLESTONMOBILE WILMINGTON SAVANNAH JACKSONVILLE US Army Corps of Engineers BUILDING STRONG ® NC Water Resources Congress Christine Brayman Deputy For.
October FY08-FY12 Dredging Schedule New York District 1st Qtr FY08 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr FY09FY10 1st Qtr 2nd.
US Army Corps of Engineers ® Engineer Research and Development Center Coastal and Hydraulics Laboratory Greenup Locks and Dam, Ohio River.
US Army Corps of Engineers BUILDING STRONG ® Mouth of the Columbia River (MCR) Jetties Laura Hicks Chief, Planning and Project Management Branch Pacific.
MVS Mainstem Forecast Model Update: NETMISS2 by Joel Asunskis, P.E. Hydraulic Engineer, St. Louis District Water Control U.S. Army Corps Of Engineers October.
US Army Corps of Engineers BUILDING STRONG ® The Nature Conservancy’s Climate, Risk & Resilience 2013 Learning Exchange Col. Richard Hansen U.S. Army Corps.
Dredging Engineering: Building & Maintaining Underwater Highways
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
UNCLASSIFIED B UILDING S TRONG 1 LRD Navigation Scenario.
BUILDING STRONG SM Partnering and Coordination to Accomplish the Navigation Mission.
Riverside County Flood Control and Water Conservation District Murrieta Creek Flood Control, Environmental Restoration and Recreation Project June 2006.
US Army Corps of Engineers BUILDING STRONG ® Planning Principles & Procedures – FY11 AUTHORIZATION AND APPROPRIATION OR “It Takes Two to Tango"
OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.
Middle Harbor Redevelopment Project WEDA Conference November 5, 2009.
Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro, Chief Harbor Engineer, POLB Emily Ueda, Program.
US Army Corps of Engineers BUILDING STRONG ® Toke Point Marina Pipeline Maintenance Dredging with Flowlane Disposal at Willapa Harbor, Washington Hiram.
SEPOCTNOVDECJANFEBMARAPRMAYJUNJULAUGSEPOCT FY07FY06FY08 Page 1 of 3 FY07 Dredging Schedule New York District Mechanical Dredge Maintenance Dredging Newark.
Dredging Creates a Strong Economy and a Cleaner Environment A big Thank You to Our Sponsors Midwest Chapter Annual Meeting.
Water-related Recreation Providers. Federal Water Project Recreation Act of 1965 Ordered reservoir managing agencies to provide recreation. Tennessee.
US Army Corps of Engineers BUILDING STRONG ® Dredging with Turbidity Tests and the EPA in Green Bay Harbor Michael Staal, E.I.T. Civil Engineer U.S. Army.
US Army Corps of Engineers BUILDING STRONG ® Mississippi Coastal Improvements Program (MsCIP) “Comprehensive Barrier Island Restoration Plan” PIANC 2012.
US Army Corps of Engineers BUILDING STRONG ® N ational D redging Q uality M anagement ( DQM ) P rogram PIANC USA, DREDGING 2012 SAN DIEGO, CA 24 OCTOBER.
US Army Corps of Engineers BUILDING STRONG ® Repairing the Mississippi River Levee with Dredged Material after the Historic 2011 Flood Dredging 2012 Shane.
BUILDING STRONG ® Rock Removal on the Middle Mississippi River 1 RRAT 2014.
BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District November 29 th, 2012.
1 US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers St. Paul District Channels & Harbors Project Pool 2 Channel Management Study.
NEW ENGLAND DISTRICT Operations and Maintenance Projects Maine Dredge Team Meeting October 2015 Ed O’Donnell Chief, Navigation Section.
St. Louis District Biological Opinion RRAT
Reach 4 Air Valve Replacements Award of Construction Contracts
DOMESTIC WATER CARRIERS
Galveston Bay Bottom Ecosystem System Features
Beneficial Use of Dredged Material
Dredging Operations Low Water Dredging Operations:
Illinois Waterway 2020 Consolidated Closure
Memphis District PROCUREMENT OPPORTUNITIES
U. S. Army Corps of Engineers,
St. Paul District Presentation by: LTC Kendall Bergmann
Challenges and Opportunities in Addressing Climate Change
BOSTON HARBOR DEEP DRAFT IMPROVEMENT PROJECT
Presentation transcript:

US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers St. Paul District Channels & Harbors Project Presentation for 2012 WEDA Midwest Chapter By Steve Tapp April 27 th, 2012

BUILDING STRONG ® 17 April Upper Mississippi River 9-Foot Navigation System St. Paul District 13 Locks and Dams 284 Miles of 9-Foot Channel Mississippi River Minnesota River St. Croix River Black River 11 Shallow Draft Recreation Harbors 3 Shallow Draft Commercial Harbors

BUILDING STRONG ® Average 850,000 CY/YR Season is May-November Government & Contract Dredges Used St. Paul District Dredging 3

BUILDING STRONG ® Government Equipment Dredge GOETZ Replaced THOMPSON in inch cutterhead pipeline dredge St. Paul District Dredging 4

BUILDING STRONG ® Government Equipment Dredge DUBUQUE 12 inch cutterhead pipeline dredge Excavators & Cranes St. Paul District Dredging 5

BUILDING STRONG ® Contract Equipment Hydraulic Mostly site excavations Some channel dredging Mechanical Mostly channel dredging 3 year contract with LS Marine in 2011 St. Paul District Dredging 6

BUILDING STRONG ® 2011 Dredging Summary Total Dredged = 1,478,989 CY Jobs = 54 62% Government 38% Contract Contractor: LS Marine Dredging Season 2011: April 27 th – November 16 th (Last year May 24 th – October 13 th ) Dredge GOETZ St. Paul District Dredging 7

BUILDING STRONG ® 2013: Pool 2 Channel Modification? 500,000 CY 2014: Lost Island Site Unloading (Pool 5) 750,000 CY 2015: McMillan Island Site Unloading (Pool 10) 200,000 CY 2016: Lower Pool 2 Multiple Site Unloading 1,000,000 CY Upcoming Dredging Jobs 8

BUILDING STRONG ® Capoli Slough 9 Environmental Management Program Protect 10 Islands Construct 9 New Islands Qty Estimates 250K CY Sand Fill 35K CY Fines 30K CY Rock Award Late 2011

BUILDING STRONG ® Pool 2 Channel Study  Complete Plan in 2012  Award Contract in 2013  Remove.5 Mile of Channel ?  Reduce Dredging  Improve Safety 10

BUILDING STRONG ® 11 Thanks!