S1 Global Module Cavity String Assembly Workflow Tug Arkan January 15, 2010.

Slides:



Advertisements
Similar presentations
Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
Advertisements

E. Kako (KEK) Webex Meeting in May 24th, Status and Disassembly Plan of S1-G Cryomodule.
Progress and Plan for Superconducting RF Cavity RF Group.
Cryo Capture Cavity II Progress Mike McGee April 13, 2005.
Saturday May 02 PST 4 PM. Saturday May 02 PST 10:00 PM.
Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
LCLS-II Cryomodules Production Plans at Fermilab
Flight Traveling By Emily. Surabaya – Auckland Departure time: Monday, September 29 th at 3:00 a.m. Length of flight: 9 hours and 16 minutes Auckland.
On Sunday, it was 59° at 10:00. From 8:00 until 10:00 it had cooled off by 4 degrees. What was the temperature at 8:00?
Class Schedule Template SundayMondayTuesdayWednedayThursdayFridaySaturday 6 AM 7 AM 8 AM 9 AM 10 AM 11 AM 12 AM 1 PM 2 PM 3 PM 4 PM 5 PM 6 PM Title Classroom.
Cavity Integration summary H. Hayano April 25, 2008 ILC-SCRF
Signal port flange and beam pipe Norihito Ohuchi 2009/10/27122nd S1-G Webex meeting.
LCLS-II cryomodule alignment. 2 Wednesday meeting, 6/17/2015 Topics Alignment of Components inside the CM Tunnel Network Tolerances LCLS-II cryomodule.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
FNAL Cavities for S1 Global Jim Kerby ALCPG 09. FNAL Deliverables Discussed in meetings 15/16 July and 10/11 Sept, and Webex and s 9/30/20092FNAL.
E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
E. KAKO (KEK) 2009' Dec. 2 5 STF Meeting for S1-G Global Design Effort 1 Cavity string assembly at KEK for S1-Global Eiji Kako (KEK, Japan)
Kelowna Secondary Grade 10/11 Parent Ambassadors December 5 th, 2013.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
1 K.Jensch, D.Kostin, DESY - Cryomodule components List S1 – DESY parts DESY parts for the S1 Cavity-String.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Weekly Schedule of Events January 3-9, Sunday, January 3, 2016 Fellowship, 9:15 am Sunday School for all ages, 9:30 Morning Worship Service, 10:45.
E. KAKO (KEK) 2010' Feb. 23 Webex meeting S1-G Global Design Effort 1 Status of Cryomodule-A for S1-Global at KEK Eiji Kako (KEK, Japan)
 =1 cavity: parameters Dimensions for cavity fabrication before any chemical polishing and at room Temp. outer ½ cell pick-up side inner ½ cells outer.
Dhani 5A. Length of flight 1 hour,43 minutes Time zone Singapore is 1 hour ahead of surabaya Departure 10 January 2012 Tuesday 5:00 am Arrive 05:00+01:43+01:00=7:43.
Detail plan of S1-Global H. Hayano (KEK),
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
CM2 Repair Status 8/13/2012 Tug Arkan 1. Latest Status After the warm end couplers were disassembled, it was decided to disassemble all the lower aluminum.
FNAL Cryomodule Assembly and Installation Plans Tug Arkan LCLS-II Production Cryomodule Final Design Review May 12-14, 2015.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 2/21/
MHI#16 号機の2回目の EP2  Process log  Status of working  Monitor data during EP & Rinsing process  Comparison of EP2 Period : 2011/5/10 ~ 5/16 Process :
LCLS-II Cryomodules Production at Fermilab Tug Arkan, 7/17/2014.
Cryomodule Assembly Facility (CAF) at Fermilab Tug Arkan (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH HARDWARE PREPARATION FOR XFEL TTC topical workshop.
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH VACUUM SYSTEM FROM DESY AND CEA SOLUTIONS TTC topical.
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
C.MADEC - TTC meeting E-XFEL cryomodule assembly : prototyping phase at Saclay.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe.
MHI#19 号機の1回目の EP2  Process log  Condition of EP2 & Rinsing process  Status of working  Monitor data during EP & Rinsing process Period : 2012/2/17~
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
Cryomodule Assembly Facility (CAF) at Fermilab: Feasibility Overview for Project X & future SRF Cryomodules Assemblies Tug Arkan February 21, 2012.
Hao Guo LINAC Department Institute of Modern Physics.
My Plan to Go to Around the world By: Benedict/5C.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
All Metal Gate Valve from VAT
FNAL Cryomodule Assembly and Installation Plans Tug Arkan May 22, 2015.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Vacuum Related Procedures and Tools of IHEP ILC Test Cryomodule Assembly Jiyuan Zhai (IHEP) TTC Topical Workshop on SRF Cryomodule Clean Room Assembly.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
Cryomodule Assembly Facility Fermilab Cleanroom Tug Arkan 1.
Review of clean room procedures for the HL-LHC Crab Cavity Program Reviewers: John Mammosser, ORNL (chair); Stephane Berry, CEA; Vittorio Parma, Mathieu.
Cavity Dressing and CM2 Assembly Mini-Reviews Report (a. k. a
Completion of the MICE-US construction project
Field Emission Minimization for LCLS-II
NL12 Girder Removal and Reinstallation
DESY Experiences on Use of Gas overlay during Assemblies
TTC Topical Workshop on SRF Cryomodule Clean Room Assembly
S0 Status report from KEK
Definition of work flow for string DESY Example on critical operation
S1-G Webex meeting Global Design Effort
WP 3 coordination meeting Saclay May 2008
IMP Cryomodule Assembly and Alignment
IHEP Cryomodule Status
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

S1 Global Module Cavity String Assembly Workflow Tug Arkan January 15, 2010

2 Assembly Team FNAL: –Brian Smith –Marco Battistoni DESY: –Manuela Schmoekel –Patrick Schilling KEK: –Okada-San (auxiliary support help, minor infrastructure modification, ultrasonic cleaning etc.) Tug Arkan (FNAL) Eiji Kako (KEK)

3 Current status As of Thursday January 14: –2 FNAL and 2 DESY dressed cavities are staged on the clean room fixtures in the Class 1000 area – The cavity exterior surfaces were wiped clean (by KEK colleagues) to Class 1000 cleanliness level –The cavities are rough aligned (rotational & X-Y)

4 Cavity String Layout Gate Valve sub-assembly (Step 1) –Right angle valve + zero length reducer flange –Transition piece DESY Z109 to Z108 cavity assembly (Step 2) FNAL ACC-011 to Step 2 assembly (Step 3) FNAL AES-004 to Step 3 assembly (Step 4) Step 1 to Step 4 assembly (Step 5) String Assembly Complete

5 Tentative Schedule: Friday Jan 15 (today) Move the gate valve and four cavities into Class 10 area –Wipe clean, blow with ionized air/nitrogen & monitor the particle count –Workflow: Move gate valve into Class 10 Move cavities (one by one) into Class 10: –pump down –leak check –leave under vacuum –move the cavity to position –Align –Check the resistance of the HOM connectors (multi-meter needed) Gate valve transition piece will be received today from the company: –KEK group cleans and preps this part to enter the Class 1000 area. This part is needed for assembly on Saturday Jan 15 morning.

6 Step 1 Assembly: (on the workbench in Class 10 area) –Right Angle valve + zero length reducer flange assembly –Clean the interior surfaces of the gate valve (ionized nitrogen blow, monitor the particle count) –Move Transition piece into Class 10 –Assemble the Gate valve sub-assembly –Leak Check, Backfill the cavity –Stage the sub-assembly on the support post Continue to move the cavities into Class 10 Receive the parts sent by DESY: –Already cleaned and bagged in Class 10 at DESY Tentative Schedule: Saturday Jan 16

7 Step 2 Assembly: –Assemble backfill lines, backfill the Z109 and Z108 cavities –Remove the blind flange from Z109 cavity (position #4) and assemble the new flange/valve assembly sent by DESY –Assemble Z109 cavity to Z108 (position #3) cavity with interconnecting bellows (standard size, sent by DESY) Tentative Schedule: Sunday Jan 17

8 Step 3 Assembly: –Assemble backfill line, backfill the ACC-011 cavity. (Step 2 assembly is already backfilled) –Assemble ACC-011 cavity (position #2) to Step 2 assembly with interconnecting bellows (long size, sent by FNAL) Tentative Schedule: Monday Jan 18

9 Tentative Schedule: Tuesday Jan 19 Step 4 Assembly: –Assemble backfill line, backfill the AES-004 cavity. (Step 3 assembly is already backfilled) –Assemble AES-004 cavity (position #1) to Step 3 assembly with interconnecting bellows (standard size, sent by FNAL)

10 Step 5 Assembly: –Backfill Step 1 assembly (Step 4 assembly is already backfilled) –Assemble Step 1 to Step 4 assembly Adjust coupler to coupler position Pump down the string, leave active pumping overnight Tentative Schedule: Wednesday Jan 20

11 Tentative Schedule: Thursday Jan 21 Leak Check the string: –Ensure that the bellows squirm protections are installed –Bag the bellows, fill with helium for fine leak check –Conduct leak check Backfill the string with Argon (overnight): –0.5 liter per minute flow, a cavity beamline volume is approx 25 liters –~50 minutes per cavity to backfill to atmosphere –~ 200 minutes to backfill the string

12 Tentative Schedule: Friday Jan 21 Spare day for unforeseen assembly schedule delays

13 Proposed Daily Work Hours DESY & FNAL group meet in the mornings at 7.30 am in front of the STF clean room Gown up and enter the clean room by 8 am Assembly from 8-10 am Break at 10 am for 15 minutes Lunch break at 12 pm for 1 hour Assembly from 1.30 pm to 3.30 pm Break at 3.30 pm for 15 minutes Assembly from 4 pm to 6 pm