1 MICE CMPB Contents: Progress to date Project management things Plans for the May shutdown Steps towards Phase Two Problems and open issues summary Andy.

Slides:



Advertisements
Similar presentations
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Advertisements

MICE: Hall Infrastructure Chris Nelson CEng CM15 8 th June 2006.
1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
1 MICE Video Conference Installations to date Future installation work Plans for May shutdown MICO organisation Use of Technical Board.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
MICO 1 st February 2010 Terry Hart (MOM). MICO 1 st February June 2015 Decay Solenoid DS will not be ready for Machine Physics. Matt Hills spent.
1 Project Manager Report Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
1 MICE phase I - Project Status Richard Apsimon (Project Manager) & Andy Nichols (Technical Coordinator) … with considerable help from Ken Long! MICE Video.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
MOM Report. Shield Wall – Gone Before During After 2.
1 Implications Of Infrastructure Build The Infrastructure Project is bigger than anyone thought, but now it’s understood The cost was underestimated, but.
1 MICE Magnets Contents: Background Refurbishment Testing Installation & survey Current status Upstream beamline Open issues & concerns MICE Beamline Review,
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
1 Project Manager Report Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
MICE - UK Project Progress Roy Preece 30 th April 2013.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Phase Two planning sequence Worries Don’t have time.
1 MICE Video Coference Project Manager Report Contents: Technical organisation of project Target and upstream beamline Muon beamline Infrastructure and.
1 MICE CM32 Summary Scheduling and planning; aims for this year Schedule update Main schedule drivers Keeping us on schedule Comment on Steps V & VI Detail.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
1 Hall & Beamline Installation Richard Apsimon, Andy Nichols, Willie Spensley MICE Collaboration Meeting, th Feb 2008.
1 Technical Co-ordination, Phase One The shared post of PM/TC has worked quite well Six months ago there was much for us to learn:  Revised the WBS 
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
UKNF/MICE PSAG, 3/5/11 Spectrometer solenoids: –Repair plan still ‘in approval’, already two months late –Workshop/mini review at LBNL 10 th /11 th May.
Infrastructure Update As at 11 th March 2009 Remaining four plates now fitted to North shield wall North & South walls and all galleries are considered.
1 MICE PM Report Phase One installations to date Problems with target & decay solenoid and rolling platforms Phase One remaining items Progress with Phase.
1 MICE PSAG PM report Brief overview Re-planning the project Solenoids, decay and spectrometer Open issues and worries Andy Nichols, STFC, PSAG, 5/5/10.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
1 MICE PM Report Completion of Infrastructure Target, solenoids Phase Two planning & schedule Non-MICE costs Staffing & visitors Don’t have time for a.
MICE Integration Engineering Jason Tarrant - STFC l Contents »South Mezzanine change summary »Integration Envelope Model »A/C Move »Maus Geometry »AFC.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
1 Project Manager Report Andy Nichols, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
1 Project Manager Report Andy Nichols, STFC – RAL MICE Collaboration Meeting, DL, 4 th -7 th June 2008.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
1 MICE PM Report Summary since CM21 Decay solenoid Infrastructure progress Step One Installation Worries MICE Video Conference, 19 th June, 2008.
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
1 MICE PM Report General Update –Phase I nearing completion –MICE Power –Actions for Decay solenoid & target –Follow-ups from last VC –Conclusions MICE.
1 MICE PM Report Infrastructure/integration progress Electrical work AFC, diffuser, etc Help with project control & staffing issues Worries & problems.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
1 MICE CM29 Engineering Summary Cooling channel moving platforms – Norbert Floor Beams and plates – Andy L Magnetic modelling – Mike RF Engineering – Andy.
1 MICE CM25 Engineering Session Summary Contents: Infrastructure Diffuser Coupling Coils Radiation Shutter AFC module EMR Andy Nichols, STFC, 4-7 th November.
MICE CM31 Schedule summary
MICE PM Report Progress with the Infrastructure A few problems
Presentation transcript:

1 MICE CMPB Contents: Progress to date Project management things Plans for the May shutdown Steps towards Phase Two Problems and open issues summary Andy Nichols, CMPB, 14 th February 2008

2 Progress to date Beamline commissioning a success –Target has been operated for an agreed number of pulses –Beam counters & monitors installed and operating –Scientific progress has been summarised by the MOM – I’m not a physicist, but my impression is that everything went well –Hear Alain’s talk…..

3 Progress to date Magnets: –Problems with Q1,2,3 power supplies, fixed ones due back from manufacturers today, then ready for soak test (May shutdown) –D2 will be connected to permanent water in May shutdown –‘Near miss’ reported due to failure of magnet on lights – now fixed –Q6 water leak – fixed, but more thorough job needed in May shutdown –Q7,8,9 – water connections made Summary: –Quad installation can be taken to be complete and all should be operational by June – grateful thanks to Willie and his men

4 Progress to Date Q9 in situ Water connections Q7,8,9 Q4,5 CAD Layout’ Before….. After!

5 Progress to Date Decay solenoid/He system –Transfer line has been routed to solenoid –Connected and leak-tested –Secondary pipework and cabling connected from panel to turret, complete this week –Cold test with existing compressor scheduled to start 21 st April Then takes 7-14 days (nearer 14!) –Then we need to: Remove compressor rotors for upgrade – this will hopefully fix the performance deficit –Some minor jobs: ‘Magnet On’ lights Polarity check Cold air ducting for compressor exhaust

6 Progress to date Infrastructure: –Instruction from OsC to progress at full speed –Concrete removal started, will finish soon, ahead of schedule, but possible structural weakness discovered in the floor. OPUS structural engineers will report – worst case outcome is some local strengthening around shield wall supports –Roughly one third of South shield wall is prefabricated off site – on site starts 25 th April –Phased delivery of wall plates will start early May in 35 tonne loads –North wall support drgs signed off: aim to place order 18 th April –A/C units are here –False floor – some problems. Drawings basically done, but magnetic modelling needed to verify – will very soon be critical path

7 Progress to date What have we done?

8 Progress to date Infrastructure: Mound excavation – not as easy as we thought due to: –Instability of ground around ISIS –Difficult access –Craning anything over ISIS control room is precluded But the right people are working on it –We put a pre-fabricated concrete ‘dam’ in position –Still aim to do the majority of the work in May shutdown –But if we don’t it will have to run until July Problem: it’s then part of phase two

9 Project Management things Richard has now left –Internal vacancy for Programme Manager has been approved – aim to interview on 28 th April –Staff shortage & sick leave has compromised supervision of electrical contractors –Steve Griffiths of DL and his group have agreed to drive this Already paying dividends – he is rapidly understanding the many jobs going on They will have a presence at RAL for three days a week –Steve Griffiths & Steve York are also driving the target engineering project now –Project is now tracked on a weekly basis by the MICO meetings and milestone table

10 Plans for May shutdown Effectively we get from 18 th May till June 9 th for access to synchrotron and DSA – it’s looming fast, we need to: –Install new target* –Soak test quads* –Polarity check solenoid* –Restrain concrete shielding on solenoid –Install TOF 0* –Connect water to D2* –Add sliding beamstop to DSA –Install roofing, fence, walkway to DSA –Excavate mound Tim & Willie are working on project plan –* these are probably priority, the rest might have to wait

11 Steps towards phase two Revised step one has been agreed by MICE EB –It’s just the KL, TOF1, fixed and moving beamstops Can take place on existing raised floor Depends on arrival of KL & TOFs in early May Must finalise sliding beamstop baseline Very soon – planned for TB meeting Careful planning needed to allow concurrent Work on shield wall supports – we have the space and L.Tortora has agreed if fence and stay/clear are provided

12 Steps towards Phase Two Permission granted for focus coils order, (two plus option for one) –Kick-off meeting with Tesla scheduled for 18 th April –Detailed shedule, design and manufacturing plan should emerge then Phase Two WBS, project plan, bottom-up staff & capital estimates underway – need another couple of weeks –Many previously unknown (to me anyway!) inputs to this are now becoming clearer – which is good Anxious not to underestimate engineering content, especially in LH2 and RF sub-projects

13 Summary of problems and open issues Need to be re-assured the KL & TOFs will arrive in first week of May –Problems with TOF PMs Magnetic modelling for false floor now very urgent Stack-up of work for May shutdown – might have to delay non-urgent work to July shutdown – worry that we’ll never clear the backlog! Not sure what the fall-back is if the PM recruitment is unsuccessful