May 1, 2014 East Gude Drive Pedestrian Road Safety Audit Stakeholder Pedestrian Safety Meeting.

Slides:



Advertisements
Similar presentations
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee September 20, 2011.
Advertisements

Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.
December 5, 2011 Presented by: Sue DAgnese Region 1 Traffic Manager Overview of: ROAD SAFETY AUDIT (RSA) PROCESS & APPLICATIONS TV Highway at 185th Ave.
What is the S-48 Corridor? Study Area What’s Happened So Far? Previous Tasks  Project InitiationJune 2005  Existing ConditionsOct  Planning.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
Comprehensive Pedestrian Enforcement Captain Thomas C. Didone Montgomery County, MD Police Department 1.
HSM: Celebrating 5 Years Together Brian Ray, PE Casey Bergh, PE.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
F IRST C APITAL E NGINEERING 48 S. Richland Ave. York PA | Phone: | Fax: | TRAFFIC REPORT Kingston Road &
US 52 Corridor Study Public Meeting November 15, 2010.
In March 2015, Mayor Murray announced a proposal for a new 9-year, $900 million transportation levy to replace the Bridging the Gap levy that expires at.
Ruben Hovanesian June 27,  Public Agencies?  Private Agencies? 2.
An Integral Perspective on the S.E. 17 Corridor October 29, 2013 Calgary.
Florida Department of Transportation, November 2009
Redwood Road & 35th Avenue Traffic Study. Problems Observed: High collision rate along the corridor was found at McArthur Boulevard intersection, with.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
6-1 Lesson 6 | Practice RSA. Perform a practice-RSA of a design-stage or an in-service road. Analyze data acquired from site visit or design plans and.
Oregon Pedestrian and Bicycle Safety Implementation Plan.
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Pinehurst School Traffic Safety Pinehurst School Traffic Safety Meeting January 27-28, 2015.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
1 ADOT Road Safety Assessment Program Presented to NACOG Technical Subcommittee December 4, 2013.
Lesson 2 | Road Safety Issues 2-1. Learning Outcomes Define RSA. Explain the need for tools to improve road safety. Explain the role of GORE. Identify.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Desktop RSA Activity Desktop RSA Activity 4-53 Step 1: Identify project or existing road to be reviewed. Step 2: Select an independent, multi-disciplinary.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
1 September 28, 2011 Safety Strategies Workshop Brown County Faribault County Martin County Watonwan County.
Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory.
March 20, 2011 Presented by: Sue D’Agnese, Region 1 Traffic Manager Overview of: ROAD SAFETY AUDIT (RSA) PROCESS & APPLICATIONS OR210 Scholls Ferry Rd:
University of Minnesota Intersection Decision Support Research - Results of Crash Analysis University of Minnesota Intersection Decision Support Research.
STA Safety Project PID #76439 December 12, 2006.
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Engineering Study Griffin View Drive & Harbor Hills Blvd. Prepared for Lake County Public Works Engineering 437 Ardice Avenue Eustis, Florida Purchase.
Rainier Avenue South Pilot Project Update Seattle Bicycle Advisory Board Project Manager Jim Curtin September 2, 2015.
Peachtree Road Transformation Project: Operations and Safety Analysis P.I Fulton County August 25, 2015 Buckhead CID 1.
Slower vehicle speeds (under 30 mph) means less severe crashes 90% reduction in fatalities, 76% reduction in injury crashes 75% fewer vehicle conflict.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
HB 277 Regional Transportation Sales Tax Preliminary Project List Presentation Mayor and City Council Work Session March 1, 2011.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Steps 6 to 8 Lesson 4 | The Eight-Step RSA Process 4-86.
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
LOW COST SAFETY IMPROVEMENTS Practitioner Workshop The Tools – Identification of High Crash Locations – Session #2.
Complete Streets Training Module 4b – Designing for All Users.
Rock Creek East II Livability Study
NE Pasco (The Hills) Multimodal Safety Action Plan Pasco County, FL
Four Winds Condominium Association August 2, 2017
S.R. 44 Corridor Management Plan S.R. 44 Corridor Management Plan
Pedestrian Safety & Mobility Study
Vision zero IN NYC NYC's Data Driven Approach to Saving Lives
Project Management Team Meeting #3
BELLE TERRE BLVD/PKWY CORRIDOR COMMUNITY DEVELOPMENT DEPARTMENT
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
The Oakton Condominium Association September 12, 2017
I-66 Outside the Beltway Design Public Hearing Meetings November 13, 14 & Susan Shaw, P.E., Megaprojects Director Virginia Department of.
OR 99E Corridor Segment Plan
Sarno Road Corridor Study
Comprehensive Transportation Plan
Alex Henry FDOT District Seven Safety Office
New Hanover Comprehensive Plan
Project Location: 35th Ave HSIP8
Presentation transcript:

May 1, 2014 East Gude Drive Pedestrian Road Safety Audit Stakeholder Pedestrian Safety Meeting

Agenda Road Safety Audit Process Overview Road Safety Audit Process Overview Project Overview Project Overview Background Background Comments Comments

What is a Road Safety Audit? A road safety audit is a formal safety performance examination of an existing or future road or intersection by an independent audit team.

What is an RSA? An RSA is a tool that: Is a formal process Is a formal process Focuses on safety issues Focuses on safety issues Proactive review of observed and potential safety issues to reduce risk Proactive review of observed and potential safety issues to reduce risk Considers various environmental conditions Considers various environmental conditions Considers all road users Considers all road users

1 Identify Project or existing road to be audited 2 Select interdisciplinary audit team 3 Conduct a Pre-audit meeting to review project information and drawings 4 Perform field reviews under various conditions 5 Conduct audit analysis and prepare report of findings 6 Present Audit findings to Project Owner/Design Team 7 Prepare formal response 8 Incorporate findings into the project when appropriate Responsibilities: Audit Team Design Team/Project Owner RSA Process

MCDOT Pedestrian RSA Corridors Georgia Avenue March 2009 Piney Branch Road October 2008 Rockville Pike June 2009 Wisconsin Avenue December 2008 Reedie Drive April 2010 Randolph Road September 2010 Colesville Rd at University Blvd January 2010 Connecticut Avenue May 2011 I-495 I-270 Colesville Road November 2011 Old Georgetown Road May 2012 Fenton Street September 2013 E. Gude Drive April 2014

1 Identify Project or existing road to be audited 2 Select interdisciplinary audit team 3 Conduct a Pre-audit meeting to review project information and drawings 4 Perform field reviews under various conditions 5 Conduct audit analysis and prepare report of findings 6 Present Audit findings to Project Owner/Design Team 7 Prepare formal response 8 Incorporate findings into the project when appropriate Responsibilities: Audit Team Design Team/Project Owner RSA Process

Potential RSA Team Members Maryland SHA Maryland SHA Montgomery County Police Department Montgomery County Police Department Montgomery County DOT Montgomery County DOT Neighboring Jurisdictions Neighboring Jurisdictions

1 Identify Project or existing road to be audited 2 Select interdisciplinary audit team 3 Conduct a pre-audit meeting to review project information 4 Perform field reviews under various conditions 5 Conduct audit analysis and prepare report of findings 6 Present Audit findings to Project Owner/Design Team 7 Prepare formal response 8 Incorporate findings into the project when appropriate Meeting Goals Review pedestrian crash data Review roadway features and deficiencies Obtain input from various roadway users Obtain input from agency representatives Identify areas of concern for review during field audit Stakeholder Input Responsibilities: Audit Team Design Team/Project Owner RSA Process

Will be conducted over a 2 day session Will be conducted over a 2 day session Observe road user characteristics Observe road user characteristics Observe surrounding land uses Observe surrounding land uses Observe connections to the adjacent transportation network Observe connections to the adjacent transportation network 4. Field Review

Workshop setting Workshop setting Review background reports and design criteria Review background reports and design criteria Systematically review drawings and other information/data Systematically review drawings and other information/data Identify, prioritize, and mitigate safety issues Identify, prioritize, and mitigate safety issues 5. RSA Analysis

RSA team, design team, owner RSA team, design team, owner Discuss preliminary findings and possible solutions Discuss preliminary findings and possible solutions Use results to write RSA report Use results to write RSA report 6(a). Preliminary Findings Discussion

Documents the results of the RSA Documents the results of the RSA Identifies and prioritizes safety issues Identifies and prioritizes safety issues Includes suggestions for improvements Includes suggestions for improvements 6(b). RSA Report

Study Area Just outside of Rockville city limits Just outside of Rockville city limits Approx. 1 mile long Approx. 1 mile long Three traffic signals Three traffic signals One HAWK beacon (For pedestrian crossings) One HAWK beacon (For pedestrian crossings) Three unsignalized intersections Three unsignalized intersections 40 mph posted speed 40 mph posted speed Calhoun Drive Dover Road E. Gude Drive Shelter 700 E. Gude Drive 800 E. Gude Drive Coca-Cola Entrance Southlawn Lane

E. Gude Drive is divided throughout the study area. E. Gude Drive is divided throughout the study area. Eastbound Eastbound Two through lanes between Calhoun Drive and Dover Road Two through lanes between Calhoun Drive and Dover Road Three through lanes between Dover Road and Southlawn Lane Three through lanes between Dover Road and Southlawn Lane Dedicated single left turn lanes at median breaks, Dover Road and Calhoun Drive Dedicated single left turn lanes at median breaks, Dover Road and Calhoun Drive Double left-turn lane at Southlawn Lane Double left-turn lane at Southlawn Lane Westbound Westbound Two through lanes, widens to a third lane between the shelter and Calhoun Drive Two through lanes, widens to a third lane between the shelter and Calhoun Drive Dedicated single left-turn lanes at all median breaks and signalized intersections Dedicated single left-turn lanes at all median breaks and signalized intersections Right-turn lane at the shelter entrance and Southlawn Lane Right-turn lane at the shelter entrance and Southlawn Lane Background

18 pedestrian collisions occurred during the study period ( ). 18 pedestrian collisions occurred during the study period ( ). 3 non-pedestrian crashes on the shelter property during study period are also included in analysis. 3 non-pedestrian crashes on the shelter property during study period are also included in analysis. Of the pedestrian collisions there were 1 not injured, 5 possible injuries, 5 non-incapacitated injuries, 6 incapacitated/disabled injuries and 1 fatality. Of the pedestrian collisions there were 1 not injured, 5 possible injuries, 5 non-incapacitated injuries, 6 incapacitated/disabled injuries and 1 fatality. The fatality occurred near the Exxon gas station at the intersection of Gude Drive and Southlawn Lane. The pedestrian was outside of the crosswalk. The fatality occurred near the Exxon gas station at the intersection of Gude Drive and Southlawn Lane. The pedestrian was outside of the crosswalk. Pedestrian activity is generally related to the shelter and public transportation. Pedestrian activity is generally related to the shelter and public transportation. 11 of the 18 pedestrian crashes occurred after the PM peak hour. 11 of the 18 pedestrian crashes occurred after the PM peak hour. Background

Long Pedestrian Crossing Distance HAWK Signal at Shelter Missing Pedestrian Connections at Bus Stop No Buffer for Mixed Use Path Bus Passenger Boarding Faded Crosswalks Shelter Bus Stop Nearby Bike Infrastructure Preliminary Observations

We appreciate your feedback! Comments and Input

Calhoun Drive Dover Road Southlawn Lane 600 E. Gude Drive 700 E. Gude Drive Coca-Cola Entrance 800 E. Gude Drive LEGEND Intersection Crash Count Mid-block Crash Count X X Low Crash Frequency Moderate Crash Frequency High Crash Frequency Crash Frequency by Location