KoM meeting 09 Oct 06 Kick-off-meeting of EFDA TW6-TSL-002 contracts 06-1412, 06-1413, 06-1414, 06-1415 09 Oct 2006 Kick-off-meeting of EFDA TW6-TSL-002.

Slides:



Advertisements
Similar presentations
Frame design Status TB-SWG May 2005 Presented by K. Ioki Prepared by M. Morimoto VV and Blanket Division, ITER Garching ITER.
Advertisements

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT EFDA CSU Garching S.Ciattaglia, page 1/25 OVERVIEW OF SAFETY OF EUROPEAN FUSION POWER PLANT DESIGNS Annual Meeting.
ACADs (08-006) Covered Keywords Description Supporting Material Accident Analysis
Structural and Failure Analysis Cost & Risk Assessment Shahram Sharafat TBM Cost Estimate Meeting UCLA Dec , 2005.
Kick off meeting EFDA Task TW6-TSS-SEA2.1 Garching 10th/10/2006 ENEA Engineering approach of the potential accident scenario leading to the worst release.
May 22nd & 23rd 2007 Stockholm EUROTRANS: WP 1.5 Task Containment Assessment IP-EUROTRANS DOMAIN 1 Design WP 1.5 Safety Assessment of the Transmutation.
US ITER TBM DCLL TBM Design, Analysis and Development C. Wong, M. Dagher, S. Smolentsev and S. Malang FNS/TBM Meeting UCLA, September 19-20, 2007.
PURPOSE OF DFMEA (DESIGN FAILURE MODE EFFECTS ANALYSIS)
Status of safety analysis for HCPB TBM Susana Reyes TBM Project meeting, UCLA, Los Angeles, CA May 10-11, 2006 Work performed under the auspices of the.
1 Brief Status of ITER TBM A High-Level Ad Hoc Group (AHG) met April 10-11, per request of the ITER Council. In that meeting, Parties intentions were stated,
The main function of the divertor is minimizing the helium and impurity content in the plasma as well as exhausting part of the plasma thermal power. The.
US ITER TBM Meeting Idaho Fall, Idaho, Aug M Dagher P Fogarty 1.TBM/ITER General Arrangement 2.Equatorial Test port Configuration 3.Test Port.
Seminar: Safety in Nuclear Fusion Plants - La Sapienza University (Rome) – 24 April 2015 Design Basis Accidents (DBA) M. T. Porfiri – ENEA UTFUS-TECN (Frascati)
Seminar: Safety in Nuclear Fusion Plants - La Sapienza University (Rome) – 24 April 2015 Occupational Safety Assessment M. T. Porfiri – ENEA UTFUS-TECN.
The effect of the orientations of pebble bed in Indian HCSB Module Paritosh Chaudhuri Institute for Plasma Research Gandhinagar, INDIA CBBI-16, Sept.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
TBM WG Meeting UCLA, December 12 th -14 th, 2005 Brad Merrill/Fusion Safety Program TBM Safety Update.
ITER In-Vessel Coils (IVC) Interim Design Review PDR Checklist Items C Neumeyer July 28, 2010 July 26-28, 20101ITER_D_3MAZCX.
1CEA/DEN/CAD/DTN/STPA/LPC Kick off meeting 0ct TW6-TSL-002 : ORE TBM OCCUPATIONAL RADIATION EXPOSURE.
WBS activity and Cost Summary (Focus on Design) Clement Wong TBM Conference Call Oct. 27, 2005.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 1 Agenda Kick Off Meeting of the contract EFDA-ENEA 05/ Task TW5-SEA 4.2 “Update Failure Mode and Effect.
Kaname Ikeda, October Status of the ITER Project Status of the ITER Project Kaname Ikeda ITER Nominee Director-General October 2006.
San Diego Workshop, 11 September 2003 Results of the European Power Plant Conceptual Study Presented by Ian Cook on behalf of David Maisonnier (Project.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
ITER test plan for the solid breeder TBM Presented by P. Calderoni March 3, 2004 UCLA.
DWA: WATER QUALITY MONITORING TASKS. TENDER DOCUMENT Aim: develop a systematic monitoring protocol that will determine possible impacts of natural and.
Presented to: IWG 26 By: Jason Burns (FAA) Date: February 5-7, 2014 Federal Aviation Administration DFMC Work Plan Update.
Tritium and Safety Issues for Power Plants Lee Cadwallader Fusion Safety Program ARIES Meeting Bethesda, MD April 4-5, 2011.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
1 ESTABLISHMENT OF REQUIREMENTS Module “ Development of regulatory framework for oversight of decommissioning Project BG/04/B/F/PP , Program “Leonardo.
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
Fusion Technology - Safety & Environment Via E. Fermi 45, I-00044, Frascati (Rome), Italy ENTE PER LE NUOVE TECNOLOGIE,
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
Background information of Party(EU)’s R&D on TBM and breeding blankets Compiled and Presented by Alice Ying TBM Costing Kickoff Meeting INL August 10-12,
TBWG and Solid Breeder TBM DDD Report including R&D Alice Ying March 4, 2005 US ITER-TBM Meeting, UCLA.
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
Development of tritium breeder monitoring for Lead-Lithium cooled ceramic breeder (LLCB) module of ITER presented V.K. Kapyshev CBBI-16 Portland, Oregon,
1 IRES, version 0: an overview Vladimir Markhonko United Nations Statistics Division The Oslo Group on Energy Statistics Fifth meeting, Cork, Ireland,
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Kick off meeting EFDA Task TW6-TSL-002 Garching 9th/10/2006 ENEA Overview of the task and coordination: refined description of the accident sequences,
Overview Remarks for US ITER-TBM Conference Call June 23, 2005 Mohamed Abdou.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Various Strategies for DCLL in the US Technology Program Poor ITER utilization (Lowest Cost Scenario) - Support EU HCLL effort, no independent DCLL TBM.
20 July 2004 LAL/IN2P3 – CERN meeting on CNGS horns Presentation by K. Elsener 1 OUTLINE 1.Status 2.Preliminary conclusions of the CNGS Review Board (30.
Study on recycling of fusion activated materials: Identify activation levels and decay time requirements of irradiated material (deliverable 3) R. Pampin.
ITER TBM MEETING March UCLA DCLL Module Design Prepared by M. Dagher UCLA P. Fogarty ORNL.
Revision of ORE assessment for port-interfacing systems – Garching, Comments from EFDA Physics Integration 1 Main recommendations Comments from.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: Nov. 30, 2009 Calculation of the integrated energy performance of buildings.
International Topical Conferences on Nuclear Safety, IAEA, June 6-9, 2017, Vienna Workshop 2: An Introduction and Further Explanation on Design Extension.
BASIC PROFESSIONAL TRAINING COURSE Module V Safety classification of structures, systems and components Case Studies Version 1.0, May 2015.
Some General Guidelines for the US TBM Costing
Introductory Remarks and Meeting Goals
DCLL TBM Reference Design
The European Power Plant Conceptual Study Overview
Amendment Invoice Task Force Progress Report
Status of CO2 Cooling tests at CERN for Pixel phase 1
DCLL TBM Safety Status Brad Merrill, Fusion Safety Program
Radioactive waste management - status
DCLL TBM Design Status FNST Meeting, August 12-14, 2008, UCLA
Amendment Invoice Task Force Progress Report
DG Environment, Unit D.2 Marine Environment and Water Industry
Open Letter - Summary of Responses
Teleconference ACS – FREIA 19th June 2017
Licensing update ESHAC #7, October 2017
Mikael Olsson Control Engineer
DCLL Nuclear Analysis WBS Costing Mohamed Sawan University of Wisconsin-Madison Mahmoud Youssef University of California-Los Angeles ITER TBM Meeting.
Presentation transcript:

KoM meeting 09 Oct 06 Kick-off-meeting of EFDA TW6-TSL-002 contracts , , , Oct 2006 Kick-off-meeting of EFDA TW6-TSL-002 contracts , , , Safety assessment for EU TBM to support ITER Licensing Process 09 Oct 2006 S.Ciattaglia EU safety contact person EFDA CSU Garching Background Status of DDD Status of safety analysis FMEA few results Aim of the task TSL-002 Summary

KoM meeting 09 Oct 06 Status of DDD No modification from the versions of beginning 2006, in particular of the section 3.6 “Safety analysis” that reports the safety analysis performed by the Designers:No modification from the versions of beginning 2006, in particular of the section 3.6 “Safety analysis” that reports the safety analysis performed by the Designers: –Source terms –Thermo-mechanical and thermo-hydraulic analysis The Chapters will be updated/completed with the outputs of the on going safety tasks Need to define SIC classification for TBM systems and components (request from Designers) a lot of TBM pipes will cross through the closure plate of the Port Plug,a lot of TBM pipes will cross through the closure plate of the Port Plug, a lot of TBM pipes will be located in the Port Cell, along with some equipments (e.g. PIC),a lot of TBM pipes will be located in the Port Cell, along with some equipments (e.g. PIC), Designers would like to better understand Designers would like to better understand what are the implication from the Licensing point of view (those pipes/equipments constitutes a prolongation of the VV primary boundary).what are the implication from the Licensing point of view (those pipes/equipments constitutes a prolongation of the VV primary boundary). Will they be safety-classified?Will they be safety-classified? What could be the implication? (double containment, qualification in procurement, etc..).What could be the implication? (double containment, qualification in procurement, etc..).

KoM meeting 09 Oct 06 Safety analysis scheme P IEInitiating Events ASAccident Sequences FMEAFunctional Failure Mode and Effect Analysis PSTProcess Source Term ESTEnvironmental Source Term DCFDose Conversion Factor SOURCE TERMS ASSESSMENT Normalworking conditions Occupational dose IE AS Thermodynamic transients Aerosols and H3 transport Containments Release from the plant DCF Overall Plant Analysis FFMEA Radioactive waste Operational&Decomm waste Identification&classification Management On-site Recycling Final disosal Effluents PST EST DCF man*Sv/y dose/sequence to MEI frequency*dose Quantity and waste categories mSv/y SOURCE TERMS ASSESSMENT Normalworking conditions Occupational dose PIE AS Thermodynamic transients Aerosols and H3 transport Containments Release from the plant DCF Overall Plant Safety Analysis FMEA Radioactive waste Operational&Decomm waste Identification&classification Management On-site Recycling Final disosal Effluents PST EST DCF man*Sv/y dose/sequence to Public frequency*dose Quantity and waste categories mSv/y

KoM meeting 09 Oct 06 Status of safety analysis EU safety analysis aim bring TBM safety analysis to similar maturity level of other SIC systems as requested by French regulations, considering also the recommendations made by NSA as output of DOS analysisbring TBM safety analysis to similar maturity level of other SIC systems as requested by French regulations, considering also the recommendations made by NSA as output of DOS analysis point out open issues and a relevant credible R&D programmepoint out open issues and a relevant credible R&D programme Significant safety analysis have been already done by the EU TBM Designers Safety analysis missing/to be rewieved Neutronic review: report ready for HCLL, by Dec for HCPBNeutronic review: report ready for HCLL, by Dec for HCPB FMEA: almost concluded for HCPB, just started for HCLLFMEA: almost concluded for HCPB, just started for HCLL Most severe accidents: KoM todayMost severe accidents: KoM today ORE: KoM todayORE: KoM today Waste review: KoM todayWaste review: KoM today R&D and further analysis definition: mid 2007R&D and further analysis definition: mid 2007

KoM meeting 09 Oct 06  Component  Operation States  Failure Modes  Causes  Preventive Action on Causes  Consequences  Corrective/Preventive Action on Consequences  PIEs  Comments FMEA Table (columns) Failure Mode and Effect Analysis Garching – 28 September 2006 Normal Operation = Burning & Dwell

KoM meeting 09 Oct 06 HCPB Components (~ 140) - Component - DescriptionComment TBM Test Blanket Module TBM-FSW TBM-FSW TBM-First-Side wall 42 channels (14 of 2-sweep-channels), ~1.7 m each TBM-Cap TBM-CapTBM-Caps 2 caps. Each cap ~25 channels of about 1.6 m TBM-Grid TBM-GridTBM-Grid TBM-Grid-CoolCh TBM-Grid-CoolCh TBM - Grid - Cooling Channel TBM-Grid-CapWeld TBM-Grid-CapWeld TBM - Grid - Welds to assemble the Grid to Caps TBM-Grid-FSWWeld TBM-Grid-FSWWeld TBM - Grid - Welds to assemble the Grid to FSW TBM-Grid-BUWeld TBM-Grid-BUWeld TBM - Grid - Welds to assemble the BU to Grid TBM-BU TBM-BU TBM-Breeder Unit PI-TBM foreseen for the high-duty D-T-phase of ITER- FEAT TBM-BottPMs TBM-BottPMs TBM - Bottom Plate Manifolds TBM-BPM TBM-BPM TBM-Back Plate/Manifold TBM-PP-IS TBM-PP-IS TBM-Port Plug Interface System PP Port Plug IPCE Inter-space and Port Cell Equipment HCS Helium Cooling System TES Tritium Extraction System CPS Coolant Purification System Failure Mode and Effect Analysis 28 September 2006

KoM meeting 09 Oct 06 Sample of FMEA Table Failure Mode and Effect Analysis Garching – September 2006

KoM meeting 09 Oct 06 Postulated Initiating Events Identified by the FMEA for HCPB Failure Mode and Effect Analysis Garching – September 2006

KoM meeting 09 Oct 06 AIM of the Task TSL-002 Deterministic analysis of the most severe accident sequences for each of the two EU TBM concepts Occupational Radiation Exposure (ORE) assessment considering the new designs of the two EU TBM models Waste assessment for both TBM concept considering the new neutronic calculations The analysis will take advantage of the work already done inside the Design Teams A technical co-ordination is foreseen focused on addressing, supporting and reviewing the safety analysis with particular reference to the deterministic analysis, the relevant modelisation of circuits and volumes, the codes and the assumptions with reference to the last updated design documents and the technical content description of TBM preliminary safety analysis report.Deterministic analysis of the most severe accident sequences for each of the two EU TBM concepts Occupational Radiation Exposure (ORE) assessment considering the new designs of the two EU TBM models Waste assessment for both TBM concept considering the new neutronic calculations The analysis will take advantage of the work already done inside the Design Teams A technical co-ordination is foreseen focused on addressing, supporting and reviewing the safety analysis with particular reference to the deterministic analysis, the relevant modelisation of circuits and volumes, the codes and the assumptions with reference to the last updated design documents and the technical content description of TBM preliminary safety analysis report.

KoM meeting 09 Oct 06 EU TBM safety analysis plan Neutronic analysisApril - July (Oct-Dec) 06Neutronic analysisApril - July (Oct-Dec) 06 FMEA: PIEs June - Oct 06FMEA: PIEs June - Oct 06 Accident sequences: DBA and BDBA July (Sept) 06 - Feb 07Accident sequences: DBA and BDBA July (Sept) 06 - Feb 07 Revision of ORE and WasteJuly (Nov) 06 - Feb 07Revision of ORE and WasteJuly (Nov) 06 - Feb 07 Final ReportMarch 06Final ReportMarch 06 R&D for TBM safety open issues (if any) by Mid 07R&D for TBM safety open issues (if any) by Mid 07

KoM meeting 09 Oct 06 Summary A systematic approach has been launched on EU TBM safety analysis –FMEA and PIE-PIT –Review of neutronics, ORE, Wastes –Accident sequences analysis Some delay in Neutronic analysis, slightly in FMEA (it will be ready by Oct) PlanningPlanning –by March 2007 all the analysis missing (most severe accidents, ORE, Wastes) –in 2007, safety review of Final Design and definition of R&D for the safety open issues, if any Quality of analysis and computer codes Need to define SIC classification for TBM systems and components 18 Dec 06 next ITER TBM safety meeting: check the progress of TBM safety analysis in all Parties

KoM meeting 09 Oct 06 AGENDA