Federal Aviation Administration ATO Future Schedule Generation Performance Analysis and Strategy January 27, 2010.

Slides:



Advertisements
Similar presentations
1 Performance Indicators: Selection, Application, and Reporting Presented by John M Rodgers Federal Aviation Administration.
Advertisements

NextGen and Its Impact on Performance Worldwide Symposium on Performance of the Air Navigation System ICAO Montreal, Quebec, Canada March 26-30, 2007 Victoria.
Federal Aviation Administration 1 Collaborative Decision Making Module 2 Developing A Collaborative Framework.
Air Traffic Analysis, Inc Using WITI for Airport Arrival Performance Analysis A report on work-in-progress December 2010.
By: Tony Diana, Date: September 19, 2005 File: apo130\ASPMDocs\ASPM Presentation 05.ppt Federal Aviation Administration Presentation of the.
Modeling Airport Capacity
Comprehensive Development Plan Sea-Tac International Airport Briefing to: Mediated Role Determination Committee April 20, 2006.
© 2002 The MITRE Corporation. All rights reserved. Economic Effects of Congestion and Delay Joe Sinnott March 2002.
Presented to: MWCOG By: Roger Schaufele Date: 09 April 2008 Federal Aviation Administration General Aviation Forecast Overview
Efficiency and Equity Tradeoffs in Rationing Airport Arrival Slots Preliminary Results Taryn Butler Robert Hoffman, Ph.D.
Airport Planning. errata Traditional forecasting techniques are still in play, but are considered archaic. US airlines are focused on international travel.
The Next Generation Air Transportation System “The Near Term and Beyond” Presented by Charles Leader, Director Joint Planning and Development Office.
1 FAA Aviation Forecasts Fiscal Years Presented at the 30 th Annual FAA Aviation Forecast Conference By Robert L. Bowles Manager, Statistics.
LMI Airline Responses to NAS Capacity Constraints Peter Kostiuk Logistics Management Institute National Airspace System Resource.
Science Meeting-1 Lin 12/17/09 MIT Lincoln Laboratory Prediction of Weather Impacts on Air Traffic Through Flow Constrained Areas AMS Seattle Yi-Hsin Lin.
1 A Second Stage Network Recourse Problem in Stochastic Airline Crew Scheduling Joyce W. Yen University of Michigan John R. Birge Northwestern University.
Air Traffic Control How Air Traffic is Coordinated © 2011 Project Lead The Way, Inc.Aerospace Engineering.
FAA Air Traffic Organization NAS Operational Analyses and Challenges to Modeling the Future.
1 Federal Aviation Administration Mid Term Architecture Briefing and NextGen Implementation 1 Federal Aviation Administration Mid Term Architecture Briefing.
Aviation Fuels Forecast Methodology Joint Lead Commissioner Workshop on Inputs and Assumptions for Transportation Energy Demand Forecasts March 19, 2015.
Preliminary Aviation Fuel Demand Forecast Joint Lead Commissioner Workshop Preliminary Transportation Energy Demand Forecasts June 24, 2015 Gordon Schremp.
Date: 18 February 2008 Federal Aviation Administration Collaborative Decision Making at the FAA/ATO A look at how CDM is applied in the U.S.
Presented to: By: Date: File: apo130\Airport Efficiency\TAER SAER Updated Briefing(2).ppt 1030 Federal Aviation Administration Presentation of System Airport.
Federal Aviation Administration FOR OFFICIAL USE ONLY (Public availability to be determined under 5USC 552) Data Communications Program DCL Benefits Modeling.
ANALYSIS FRAMEWORK FOR OPERATIONAL EFFECTS OF DIFFERENT CONGESTION MANAGEMENT MEASURES AT CLUSTERED AIRPORTS Loan T. Le Research Sponsors: NASA ARC, FAA.
1 Congestion Pricing and Queuing Theory Giovanni Andreatta and Guglielmo Lulli Dip. di Matematica Pura ed Applicata - Università di Padova.
EUROCONTROL EXPERIMENTAL CENTRE1 AIRSPACE CONGESTION: Pre-Tactical Measures and Operational Events ICRAT Conference, Zilina November 22, 2004 Nabil BELOUARDY.
May 7, 2013 Yagnesh Jarmarwala Phani Jammalamadaka Michael Copeland Maneesh Mahlawat 14 th TRB National Transportation Planning Applications Conference.
MIT ICAT ICATMIT M I T I n t e r n a t i o n a l C e n t e r f o r A i r T r a n s p o r t a t i o n Virtual Hubs: A Case Study Michelle Karow
Workshop PRIXNET – 11/12 Mars CONGESTION PRICING IN AIR TRANSPORTATION Karine Deschinkel Laboratoire PRiSM – Université de Versailles.
October 18-20, 2010 LONG BEACH, CALIFORNIA
Federal Aviation Administration Date: July 2011 Terminal Arrival Efficiency Rate (TAER) 101 Metric Explanation.
M I T I n t e r n a t i o n a l C e n t e r f o r A i r T r a n s p o r t a t i o n ANALYSIS OF BARRIERS TO THE UTILITY OF GENERAL AVIATION TROY D. DOWNENR.
Bureau of Transportation Statistics: Aviation Data Bases Bureau of Transportation Statistics Research and Innovative Technology Administration United States.
An Automated Airspace Concept for the Next Generation Air Traffic Control System Todd Farley, David McNally, Heinz Erzberger, Russ Paielli SAE Aerospace.
LMINET2: An Enhanced LMINET Dou Long, Shahab Hasan December 10, 2008.
Presented to: NAS-Wide Simulation & NextGen workshop By: Kimberly Noonan, Joseph Post Date: December 10th, 2008 Federal Aviation Administration The Modernized.
Presented to: NAS-Wide Simulation Workshop By: Kimberly Noonan, FAA NextGen and Ops Planning Date: January 28, 2010 Federal Aviation Administration NextGen.
Major Transportation Corridor Studies Using an EMME/2 Travel Demand Forecasting Model: The Trans-Lake Washington Study Carlos Espindola, Youssef Dehghani.
NAS-WIDE Simulation Workshop December 10, 2008 Interagency Portfolio & Systems Analysis Division Yuri Gawdiak.
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
F066-B © 2008 The MITRE Corporation. All rights reserved. MITRE-CAASD’s systemwideModeler State and Near-Term Plans Pete Kuzminski 10 December 2008.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Federal Aviation Administration System Airport.
Ames Research Center 1 FACET: Future Air Traffic Management Concepts Evaluation Tool Banavar Sridhar Shon Grabbe First Annual Workshop NAS-Wide Simulation.
Baseline Future Scenarios for JPDO Evaluation and Analysis March 18, 2005 (408) Matthew Blake.
Review of the 2000 Regional Airport System Plan — Part2 October 27, 2006.
F066-B Public Release No.: © 2010 The MITRE Corporation. All rights reserved. Demand Generation for System-wide Simulation Glenn Foster MITRE.
September 25, 2009 BASELINE CAPACITY AND DELAY ANALYSIS Prepared for: Regional Airport Planning Committee Prepared for: Regional Airport Planning Committee.
By: Nan Shellabarger Date: February 28, 2006 Federal Aviation Administration FAA Forecast.
Presented to Time of Day Subcommittee May 9, 2011 Time of Day Modeling in FSUTMS.
Presented to: Demonstrations and Prototypes TIM By: Steve Hodges Date: 05/04/2011 Federal Aviation Administration Aircraft Access to SWIM (AAtS) FY11 planned.
Presented to: Emerald Coast Transportation Symposium By: Terry Washington, P.E. Regional Capacity Manager – FAA Southern Region Airports Division Date:
Presented to:GMU System-Wide Modeling Workshop By: Joseph Post, ATO NextGen & Ops Planning Date: 10 December 2008 Federal Aviation Administration FAA System-Wide.
Federal Aviation Administration 1 Collaborative Decision Making Module 5 “The Collaborative Environment”
Using Simulation in NextGen Benefits Quantification
Joint Planning & Development Office Evaluations & Analysis Preliminary Scenario Analyses Strategy Assessment to Provide a Basis for Prioritizing Investments.
Air Traffic Control System Command Center Activities and Perspective Steve McMahon, Manager, System Efficiency.
________________________________________________________ GBI Cost Analysis SAE Advances in Aviation Safety April 11th, 2000 SAE Advances in Aviation Safety.
Port of Bellingham Briefing BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN BRIEFING April 2014.
By: Robert Anderson Economic Feasibility Model for Biogas Facilities in Ontario.
RSPA/Volpe Center Arrival/Departure Capacity Tradeoff Optimization: a Case Study at the St. Louis Lambert International Airport (STL) Dr. Eugene P. Gilbo.
Presented to:Nextor NAS-Wide Modeling Workshop By: Joseph Post, NextGen Systems Analysis Date: January Federal Aviation Administration NextGen.
Federal Aviation Administration Integrated Arrival/Departure Flow Service “ Big Airspace” Presented to: TFM Research Board Presented by: Cynthia Morris.
Airports Division Great Lakes Region Overview of Airfield Capacity
FAA Air Traffic Organization (ATO)
NextGen and Its Impact on Performance
Airport Planning.
A Modeling Framework for Flight Schedule Planning
Jim Mcintosh Director, Executive Operations Advisor California ISO
A Concept for Launch and Reentry Collaborative Decision Making (CDM)
Presentation transcript:

Federal Aviation Administration ATO Future Schedule Generation Performance Analysis and Strategy January 27, 2010

2 Federal Aviation Administration Briefing Overview ATO and Future Schedule Generation Inputs to Future Schedule Generation Sample Day Selection and Averaging Core Logic Future Work

3 Federal Aviation Administration ATO and Future Schedules Core ATO Function Since 2006 –ATO Sponsored Multiple Demand Generation Projects –No consistency across planning projects Streamline process for building future scenarios –Demand/Model Issues Worked out in Advance –Representative Sample Days Assumptions coordinated within ATO –Feasible Schedules –Risk Ranges

4 Federal Aviation Administration DATACOM Investment Analysis ERAM Evaluations NextGen Portfolio Analysis Performance Airspace Management High Altitude Trajectory Based Airspace End Users

5 Federal Aviation Administration Summary of Input to Future Scenarios APO –TAF Airport Operations (Annual Levels) –Future Fleet Assumptions (Annual Projections) –ASPM Gate/Runway Times (Daily Traffic) –OPSNET Data Counts (Daily Traffic) –Cancellations ATO AIMLAB –Filed Flight Information (altitude, speed, waypoints) –Center Crossing Data (Not Filed but used for Center Activity) –Cancellations Consistent with Data Sources Used to Assess ATO Performance

6 Federal Aviation Administration TAF 2004 TAF – 16,164, – 16,174,591 TAF 2008 TAF % Down from % Down from 2006

7 Federal Aviation Administration

8 Federal Aviation Administration Representative Planning Days Sample Days Throughout Fiscal Year –Reflect Seasonality of the NAS –Peak and Off-peak Days each Fiscal Quarter –8 Days per Fiscal Year Target 90% Planning Day by Facility by Season –Originally Based on 20 CONUS Centers –Assess 90% Day for 35 OEP Airports –ASPM Delay, NAS Wx index

9 Federal Aviation Administration Center Count Traffic for ZMA Sep-0414-Nov-043-Jan-0522-Feb-0513-Apr-052-Jun-0522-Jul-0510-Sep-05 FY2005 Counts ZMAFY05FALWNTSPRSUMATO_FALATO_WNTATO_SPRATO_SUMPoly. (ZMA) Almost all 36 Above Target Days Occur in Winter/Spring 5543 Current Target Day - Mar 23

10 Federal Aviation Administration Representative Days

11 Federal Aviation Administration Seasonal Average Performance Metrics

12 Federal Aviation Administration

13 Federal Aviation Administration

14 Federal Aviation Administration Summary Day Selection 8 Day Samples can vary with criteria –Annual vs. Fiscal quarter accuracy –Center, Airport Facility –Weighted Airport (JFK, ATL, etc) –Performance measures other than counts Flight Hours, Delay, NAS On-Time –Optimal Weighting Coefficients 8 Sample Days with Weighting –Provides reasonable annual estimates by facility –Easier to investigate a smaller samples Arithmetic Average (36 Days) vs. 8 Days

15 Federal Aviation Administration ATO Future Schedule – Core Logic Turn Airport Growth Rates into City Pair Growth Rates (Frater) –Builds the traffic network Constrained Demand –Is the Network Feasible? Future Itineraries –Links flights together, propagated delay Future Fleet –How will the fleet evolve? What has Changed?

16 Federal Aviation Administration How Peaky Should Schedules Become? ATO-F discount delay if above a certain threshold –Generic smoothing algorithm – no limit on time 20 Minute Delay Rule – LGA Study –20 minute average open to interpretation –Iterative process with models FY 2000 Delay Rule –Airports Frozen at 2000 Levels –Sensitive to model Historical Demand/Capacity Ratios –Developed by MITRE for OEP 6.0 & 8.0 –Simple, practical to implement

17 Federal Aviation Administration Percent Above Target Capacity in 15 Minute Bin – How Bad Does It Get? 2006 VMC Capacity Data from ATO-F, Summer 90% Peak Day Known Problem Airports Over Capacity More Balanced Operation Most 15 Minute Bin Peaks Less than 30% Over 40% Selected for Representative As Bad As It Gets Arr/Dep Imbalance Special Cases

18 Federal Aviation Administration

19 Federal Aviation Administration 40% 19 Deps 2 Arr At Cap at 15 Ops

20 Federal Aviation Administration Constrained Schedule Methodology Airport VFR Capacities Compared to IFR Schedule for 15 Minute Intervals Flight Times Adjusted to Reduce Peaks Based on Airline Tolerance for Congestion –15 Minute > 40% above Capacity –1 Hour > 20 % above Capacity –2 Consecutive Hours > 14 % above Capacity –3 Consecutive Hours > 6 % above Capacity –Most Congested Airports Considered First

21 Federal Aviation Administration

22 Federal Aviation Administration

23 Federal Aviation Administration

24 Federal Aviation Administration Future Fleet Fleet Forecast File – ( ) –139 Airlines –Mainline (15), Low-cost (12), Regional (21), Other (49) Cargo (42) –Jet Charter Aircraft Fleet Projections for Several Classes of Aircraft –Link to 3-Char Airline, 4-Char Equipment Codes Relation of Future Fleet File (Greenslet) to Rest of APO Process –Future Operations(Air Carrier, Air Taxi, GA, Military) –Future Enplanements(Air Carrier, Commuter) –Load Factor

25 Federal Aviation Administration Rules for Up-gauging Aircraft

26 Federal Aviation Administration Evidence of Up-gauging Based on the number of seats available in the fleet as predicted by the 2008 Greenslet/APO fleet forecast. –Cargo aircraft are assigned zero seats. 26

27 Federal Aviation Administration Evidence of Up-gauging If the data is segregated by airline user class, we observe that the up- gauging is driven by regional and ‘other’ operations, while mainline carriers lower the number of available seats. 27

28 Federal Aviation Administration Airport Up-gauging At the airport level, LGA is an example of an airport that suggests the need for up-gauging. Based on the TAF 2009 forecast, the enplanements at LGA are forecasted to grow much quicker than the operations. 28

29 Federal Aviation Administration

30 Federal Aviation Administration Future Development Improve Accessibility of Schedules –Understand Data Limitations –Web Access Guidance for Uncertainty –Alternative Scenarios –Mont-Carlo System Performance/Airline Behavior –Demand Shifts Keep Analysis “Costs” Down –Remember the Objective –Did the work make a difference?