The following advertisement is created for the sole purpose of understanding the Commissioning process. The following advertisement is created for the.

Slides:



Advertisements
Similar presentations
Energy Audit Process For Data Centers Len Kientz
Advertisements

Commissioning Approach Integrated Service Solutions
TESTING AND BALANCING IN HEALTHCARE FACILITIES. What is Test & Balance The art of establishing air and water flows to meet design criteria. Total System.
11/4/2008 KUEGLER ASSOCIATES, LLC DESIGNED RIGHT = BUILT RIGHT.
Valley City State University | Facilities Services
SUBMITTALS PROCESSING Fall 2008 ARCH 330
Building Commissioning. What is building commissioning? Building commissioning is a systematic and documented process of ensuring that the owner’s operational.
EQUIPMENT VALIDATION.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
SPRING CONVENTION MARCH 2006 Requirements for “On-Line” Power Generation in Accordance with the International Building Code Presented by Richard C. Berger.
Building Commissioning
Office Designs The Design Process at Work © MS Office Suite.
Business Continuity & Disaster Recovery Planning at The Chicago Board of Trade Presented By: Bryan Durkin Sr. Vice President The Chicago Board of Trade.
1 Microturbine CHP Application in the Hotel Business DOE Microturbine Application Workshop Embassy Suites Brea January 20, 2004.
5 Assuring Building Performance Page 72
CONSTRUCTION BLUEPRINT READING
MCC PRESENTATION - GMP MANUFACTURING ENVIRONMENTS
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
HVACR116 – Trade Skills Mechanical Drawings.
S/W Project Management
KEEPING LABOR AND OVERHEAD COSTS DOWN Controlling Labor and Overhead Costs as a Long Term Strategy.
1.0 INTRODUCTION Seán Moran. SIMPLE? Commissioning is a complex issue requiring: Planning Leadership Teamwork Training Communications.
Standard 29 CFR Part Lockout / Tagout. Lockout/tagout agenda In today’s presentation, we will discuss the following: Terminology Energy sources.
Building Commissioning: It’s a Process For a Reason Presented by Rick Scivally CHFM, CHSP, CBCP, LEED AP.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Constructionsite Roles in Construction Ron Gatepain.
A New Paradigm for Utility Coordination Kenny Franklin INDOT Director of Utilities and Railroads.
สถานการณ์ ท่านดูรับผิดชอบเรื่องการ เตรียมการและตอบโต้ภาวะฉุกเฉิน ของหน่วยงาน ขณะนี้ท่านได้ จัดทำแผนเผชิญเหตุของ หน่วยงานเสร็จเรียบร้อยแล้ว ท่าน ได้รับคำสั่งจากหัวหน้าหน่วยงาน.
TECHNOLGICAL DESIGN Architectura l Design Process.
PLANNING AND SCHEDULING
Preparing for Disasters General Liability. Introduction  The one coverage that provides you and your business the most protection is General Liability.
1 What is Precast Concrete? Precast concrete consists of a mixture of cement, water, aggregates and admixtures. This mixture is cast into a specific shape.
High Performance Buildings 2007 Differences in Commissioning Scope ACG, ASHRAE Guideline 0, GSA and LEED Steven (Rusty) Ross PE, CxA, LEED AP SSRCx, LLC.
Laura J. Weber Solid Waste Project Manager St. Regis Mohawk Tribe ITEP Tribal Transfer Station Course.
Chapter 23 Lighting Design Process: Final Phases © 2006 Fairchild Publications, Inc.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Capturing the requirements  Requirement: a feature of the system or a description of something the system is capable of doing in order to fulfill the.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Skills used to create a more Positive Work Environment.
Construction of a Transfer Station
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
Design Intent Phase Design Intent Phase Determine what the design intent is and how the building is to operate when it is complete. Determine what the.
Designer/Contractor JV- Apron Services Projects- A Winning Case
Division 1 – General Requirements ACT Objective O Learn to write Division 1 sections in a manner that governs but does not limit the content of.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Health & Safety in Construction 4A7 Design & the Built Environment John O’Connor.
Chilled Water Plant Overview From Project Concept To Operation July 26, 2007.
Commissioning HVAC Systems: Lessons learned throughout
Disaster Preparedness Are you prepared?. Effective Disaster Plans  Your plan should outline the basic preparedness steps needed to handle the anticipated.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry.
Fort Stanwix National Monument Energy Audit Contract
The Design Team Carl James.
In Too Deep A CDM Perspective – Acting BEFORE Construction Begins.
The Data Center Challenge
Architecture, Civil Engineer, and Interior Designer
(Additional materials)
KUEGLER ASSOCIATES, LLC
Controlling Project Cost and Schedule
LESSONS LEARNED NYP Design and Construction NYP BEST PRACTICES.
The emphasis of Construction Management and Preconstruction Services in the AEC industry Preconstruction Services Construction Management.
Preparing for a Stack Test
A Paradigm for Utility Coordination
Construction Considerations
The Survival Plan.
Presentation transcript:

The following advertisement is created for the sole purpose of understanding the Commissioning process. The following advertisement is created for the sole purpose of understanding the Commissioning process. Descriptions included are a small portion of the Commissioning process and not intended to give a complete understanding. For more information contact a representative. Descriptions included are a small portion of the Commissioning process and not intended to give a complete understanding. For more information contact a representative.

Building a better future. Building a better future. Building relationships where everyone wins. Building relationships where everyone wins. Helping to build the finest product mankind can offer. Helping to build the finest product mankind can offer. It’s all in the details. It’s all in the details.

The Commissioning Process Establishing Design Intent Establishing Design Intent The Design Phase The Design Phase The Construction Phase The Construction Phase Pre Start Up Check out Pre Start Up Check out Functional Performance Testing Functional Performance Testing Documentation Documentation Training Training

The Commissioning Process Establishing Design Intent Establishing Design Intent What type of system best suites the customers needs: What type of system best suites the customers needs: Chilled Water Plant/ Water Cooled Self Contained Units / Hot Water Heat / Electric Heat / Economizer Capability? Chilled Water Plant/ Water Cooled Self Contained Units / Hot Water Heat / Electric Heat / Economizer Capability? What are the operating parameters. How much fresh air, relative humidity guidelines as well as temperature expectations. What are the operating parameters. How much fresh air, relative humidity guidelines as well as temperature expectations. How many bells and whistles? How many bells and whistles? How much redundancy? How much redundancy? Do we want to control lighting? Do we want to control lighting?

The Commissioning Process Design phase: Constant communication between team members keeps everyone on the same page. Working with the designers, the drawings will be reviewed to insure all necessary testing and service ports are included. Suggestions will be made for the purpose of value engineering. All requirements and specifications will be clearly pointed out to the contractor so they can establish accurate construction estimates.

The Commissioning Process Construction Phase: Construction Phase: Frequent visits to the job site monitoring progress to uncover any potential conflicts. Frequent visits to the job site monitoring progress to uncover any potential conflicts. Are there any terminal units that have their control panel’s access restricted by walls, duct, pipe, conduit, hangers, etc. Are there any terminal units that have their control panel’s access restricted by walls, duct, pipe, conduit, hangers, etc. Are there any electrical issues developing. Are there any electrical issues developing. Is chemical treatment coordinated properly and every- one on board. Is chemical treatment coordinated properly and every- one on board.

The Commissioning Process Pre Start Check Out Pre Start Check Out Develop a schedule when all trades are to be finished with their start up responsibilities. Develop a schedule when all trades are to be finished with their start up responsibilities. Develop and distribute equipment check lists for contractors to complete. Develop and distribute equipment check lists for contractors to complete. Perform comprehensive check out making sure all equipment is ready for start up. Perform comprehensive check out making sure all equipment is ready for start up. Verify that all equipment meets service clearance requirements. Verify that all equipment meets service clearance requirements.

The Commissioning Process Functional Performance Testing Functional Performance Testing In this phase we perform tests on all parts of the system to verify that it acts and reacts as the design specifies. In this phase we perform tests on all parts of the system to verify that it acts and reacts as the design specifies. Failure performance tests are done to verify how the system reacts in the event of a particular components failure. Failure performance tests are done to verify how the system reacts in the event of a particular components failure. Document those results. Document those results.

The Commissioning Process Documentation & Training Documentation & Training A complete draft of the readings and system settings from the functional performance tests will be distributed. A complete draft of the readings and system settings from the functional performance tests will be distributed. At this point Contractors and Sachs Consulting will collaborate with facilities operation personnel and perform a complete and thorough systems training. At this point Contractors and Sachs Consulting will collaborate with facilities operation personnel and perform a complete and thorough systems training.

Credits Picture description by slide number: 2 - City Unknown 3 - Nations Bank Plaza / Atlanta Ga 4 - Preston Ridge III / Alpharetta Ga 5- Prominence Building / Atlanta Ga 6- Buyers Engineering / Sandy Springs Glenlake / Sandy Springs Glenlake / Sandy Springs Century Center / Atlanta Century Center / Atlanta 9- Royal Ridge / Alpharetta 9- Royal Ridge / Alpharetta