EURO EURO 1)Welcome 2)Status of negotiations and GA 3) “ of Consortium Agreement 4) “ of website, mailing lists, logo, etc 5)Management Structure 6)Bodies.

Slides:



Advertisements
Similar presentations
WP1 – Management & Knowledge Dissemination WP1 – Management & Knowledge Dissemination 1)Aims 2)Organisation 3)Plans.
Advertisements

EURO EURO 1)Welcome 2)Status of negotiations and GA 3) “ of Consortium Agreement 4) “ of website, mailing lists, logo, etc 5)Management Structure 6)Bodies.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
14 mars 2007M. Dracos, Neutrino Design Study1 Neutrino Oscillation Facility Design Study in FP7.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
EGEE is a project funded by the European Union under contract IST NA2 Dissemination John DYER Activity Leader All Activity Meeting, CERN 18.
EURO - Welcome and Introduction EURO - Welcome and Introduction Welcome Status of EUROnu Annual report Milestones and deliverables Publications Technical.
Culture Programme - Selection procedure Katharina Riediger Infoday Praha 10/06/2010.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
Management structure and procedures KickOff Meeting ICT-AGRI 2 4 th – 5 th Februrary 2014 Niels Gøtke, Iver Thysen Jan Erpenbach, Elke Saggau.
WP5: Detector Performance and Cost EuroNu Launch Meeting 5 February 2008 Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera Villanueva,
The Preparatory Phase Proposal a first draft to be discussed.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
Coordinating EC Research Projects Paul Drath Singleimage Limited 3 Foundry Walk St Ives Cambs PE27 5FW phone fax
General Assembly 2 - JERICO - 1 Patrick Farcy I Ifremer I Financial Management WP11 Jerico GA I Oslo I Norway.
ETHICBOTS Emerging Technoethics of Human Interaction with Communication, Bionic, and robotic Systems WP1 – Project coordination and management Guglielmo.
Project overview: objectives, work programme & management guidelines FIRST MEETING OF EUROPEAN POLICY CORE GROUP Thursday, 03 March 2005 in Berlin PRESENTATION.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
Technology Strategy Board Driving Innovation Participation in Framework Programme 7 Octavio Pernas, UK NCP for Health (Industry) 11 th April 2012.
EPOCA – 11. June EPOCAConsortiumOrganisation.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
European design study on Neutrinofacilities - Euronu within FP7.
Project Reporting for the EuCARD Integrating Activity Project Based on: - Provisions of the Grant Agreement (GA) and its annexes - FP7 Guide on Project.
Month 6 Meeting Dedeman Hotel, Ankara, Turkey Thursday July 7 th 2005 R ESIST V IR Co-ordination of Research on Genetic Resistance to Plant Pathogenic.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Proposal submitted 2 nd May 2007 “Approved” ~ beginning August 07  highest mark ever.
Dr. Marion Tobler, NCP Environment Evaluation Criteria and Procedure.
An Integrated Project under EU 6th Framework Programme Kick-off meeting, Hamburg September 2004 Chris Hewitt, Met Office Hadley Centre, UK
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
Status Update Outline  General remarks - reminder  Progress since last Annual Meeting – June 2010  Next steps - timeline EUROnu Costing Ilias Efthymiopoulos.
WP5: Detector Performance and Cost EuroNu Meeting CERN, 26 March 2009 Paul Soler Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera.
Work Package 4 Practicalities Kick-off meeting Judith Freita Ramos Project Deputy for Detectors at ESS.
Status of QUACO project
WG3 – Part 3 - Design Studies Introduction Introduction View from Europe - RE View from Europe - RE “ “ Japan- Yoshi Kuno “ “ Japan- Yoshi Kuno “ “ US-
NSHIELD Project Meeting Brussels - 15 Feb 2012 Luigi Trono.
Project Procedures Start up Governance Internal Communications – Lists – documents Meeting Schedule Deliverables Cost statements.
S 1 Annual Meeting 2013 Management and reporting (WP6) Chiara Bearzotti NACLIM project manager.
Physics and Performance Evaluation Group NuFact 07 Okayama University, Japan August 6, 2007 Walter Winter Universität Würzburg for the executive committee:
Project Management Birutė Markevičiūtė Joint Technical Secretariat Lead Partner Seminar 13 October 2008, Riga.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
S 1 Annual Meeting 2013 Crediting EC contribution Open access requirements Chiara Bearzotti NACLIM project manager.
Mathias DEPRETZ – EuroVO-DCA Project Manager Work Package 1 – Management First Board Meeting – 2&3 october 2006 WP1 Management EuroVO-DCA Project FIRST.
Research and Innovation REPORTING and PAYMENT (in practice) v
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe History Aims Structure Some admin Rest of the meeting.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
Fabrizio Gagliardi EGEE Project Coordinator EGEE is proposed as a project funded by the European Union under contract IST
Consumers, Health, Agriculture and Food Executive Agency 3rd Health Programme The Electronic Submission System (JA 2015) Georgios MARGETIDIS.
SC meeting R. Aleksan February 11 th TIARA 1.General Information 2.Final Budget 3.Meeting Objectives 4.Organizational matters 5.Kickoff meeting 6.Conclusion.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
EUROnu Review: 14 th April 2011 EUROnu Introduction and Objectives Neutrino oscillations: much interest since 1 st paper in extension required to.
Coordinators' day on FP7 Project Negotiation Description Of Work Annex I Griet Van Caenegem DG CNECT R5 Programme Operations May 28, 2013.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.WP management 3.General rules 4.Conclusion Work Packages.
ICT Smartcities 2013 FP7-SMARTCITIES-2013 WP6 – Project Management OPTIMising the energy USe in cities with smart decision support system (OPTIMUS) Objective.
Contract Kari-Jouko Räihä. The Package  Contract (“core contract”) Signed between the coordinator and the commission Accession forms signed by the coordinator.
AMICI WP1 – Management, coordination and dissemination
WP3 - Evaluation and proposal selection
BENCH-CAN Internal evaluation 2nd semester
ARIES Industrial and Societal Applications Network
WP1 - Consortium coordination and management
EUROnu: Management Aspects
Report on EUCARD WP6: MICE Transnational Access (TA)
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013.
AMICI WP1 – Management, coordination and dissemination
A High Intensity Neutrino Oscillation Facility in Europe
A High Intensity Neutrino Oscillation Facility in Europe
Presentation transcript:

EURO EURO 1)Welcome 2)Status of negotiations and GA 3) “ of Consortium Agreement 4) “ of website, mailing lists, logo, etc 5)Management Structure 6)Bodies to be appointed

Status of Negotiations Status of Negotiations Documents required by EC:  Draft Annex1 to GA  GPFs Sent middle October 2007 See No comments received so far Project officer has been in contact Possible reasons:  No particular problems with EURO  Concentration on other projects  UK funding crisis

Status of Negotiations Status of Negotiations GA: specific mods for CNRS, CSIC Annex 1: same as proposal, but with additional info GPFs:  A’s – info provided by you  B’s – from proposal Possible areas for comment:  Funding request from EC  Deliverables  WPs

Status of Negotiations Status of Negotiations >4M€

Status of Negotiations Status of Negotiations [1][1] Deliverable numbers in order of delivery dates: D1 – Dn [2][2] Please indicate the nature of the deliverable using one of the following codes: R = Report, P = Prototype, D = Demonstrator, O = Other [3][3] Please indicate the dissemination level using one of the following codes: PU = Public PP = Restricted to other programme participants (including the Commission Services) RE = Restricted to a group specified by the consortium (including the Commission Services) CO = Confidential, only for members of the consortium (including the Commission Services) [4][4] Month in which the deliverables will be available. Month 1 marking the start date of the project, and all delivery dates being relative to this start date.

Status of Negotiations Status of Negotiations Del. no. [1] [1] Deliverable nameWP no. Lead beneficiaryEstimated indicative person-months Nature [2] [2] Dissemination level [3] [3] Delivery date [4] [4] (proj. month) D1Requirements for proton driver 2212RPU6 D2Report on 1 st year activitiesAll147RPU12 D3Review detector performance of baseline scenarios 5436RPU12 D4Review physics of baseline scenarios and optimisation 6624RPU12 D5Review of baseline muon front end and large aperture acceleration 3356RPU15 D6Comparison criteria139RPU18 D7Collection device construction 41540PPU18 D8Bunching performance evaluation 4740RPU18 D9Interim reportAll194RPU24 D10Target and collection design report 21175RPU30 D11Cost and performance evaluation for reference muon front-end 3756RPU30 D12Report on the experimental validation of the collection device for Li PPU30 D13Project review documentation All1122RPU36 D14Target & collector integration 2850RPU36 D15Beam characteristics2231RPU36 D16Optimisation of baseline detectors 5459RPU36 D17Recommendation of the reference Neutrino Factory design 3556RPU38 D18Performance and cost evaluation of the facility 3256RPU42 D19Physics comparison between the facilities 6689RPU43 D20Comparison between facilities 1125RPU46 D21Final reportAll1240RPU48 TOTAL1407 [1][1] Deliverable numbers in order of delivery dates: D1 – Dn [2][2] Please indicate the nature of the deliverable using one of the following codes: R = Report, P = Prototype, D = Demonstrator, O = Other [3][3] Please indicate the dissemination level using one of the following codes: PU = Public PP = Restricted to other programme participants (including the Commission Services) RE = Restricted to a group specified by the consortium (including the Commission Services) CO = Confidential, only for members of the consortium (including the Commission Services) [4][4] Month in which the deliverables will be available. Month 1 marking the start date of the project, and all delivery dates being relative to this start date.

Status of Negotiations Status of Negotiations [1][1] Deliverable numbers in order of delivery dates: D1 – Dn [2][2] Please indicate the nature of the deliverable using one of the following codes: R = Report, P = Prototype, D = Demonstrator, O = Other [3][3] Please indicate the dissemination level using one of the following codes: PU = Public PP = Restricted to other programme participants (including the Commission Services) RE = Restricted to a group specified by the consortium (including the Commission Services) CO = Confidential, only for members of the consortium (including the Commission Services) [4][4] Month in which the deliverables will be available. Month 1 marking the start date of the project, and all delivery dates being relative to this start date. Work package No Work package titleType of activity Lead participant No Person- months Start month End month 1Management and Knowledge Dissemination MGT Super-BeamRTD Neutrino FactoryRTD Beta BeamRTD Detector Performance RTD Physics ReachRTD TOTAL1386

Status of Negotiations Status of Negotiations GA: specific mods for CNRS, CSIC Annex 1: same as proposal, but with additional info GPFs:  A’s – info provided by you  B’s – from proposal Possible areas for comment:  Funding request from EC  Deliverables  WPs Future modifications: updated Associates list

Status of Negotiations Status of Negotiations Next steps:  Comments from EC  Final modifications from us  Final comments from EC???  Signing of A2.5’s  Signing of GA agreement by EC and me  Funds from Brussels

Consortium Agreement Consortium Agreement First draft – almost ready  This week, if not already Fairly standard, with no particular difficulties Please check and make sure admins are happy

Website, etc Website, etc Website  exists  Currently points to  Plan to copy EURISOL site  INFN agreement given  Security issues still being checked Logo!  Need one!  Volunteer?

Mailing Lists Mailing Lists Only private lists at the moment Proposed lists:  EURO list – everybody in DS – I’ll need contact details  GB list  WP lists – to be created by WPM Comments?

Management Structure Management Structure

Responsibilities in EURO Responsibilities in EURO Governing Board:  Ultimate authority in EURO  Oversees the operation of the DS  Make sure other boards are doing they’re jobs  1 member per partner  1 meeting/year, during annual meeting  Chair to be elected from members (see later)  Ex-officio members to be decided (see later)

Responsibilities in EURO Responsibilities in EURO Management Board:  Ensure contract execution  “ all obligations (deliverables, milestones) met  Meet as required  Membership: project coordinator 1 each for SB, NF and BB  Latter need to be elected (see later)

Responsibilities in EURO Responsibilities in EURO Coordination Board:  Monitoring of all tasks  Integration with international activities  Identification of synergies with other projects  Meet ≥ 3 times a year  Membership: MB WP coordinators and/or deputies Others ex-officio, as required

Responsibilities in EURO Responsibilities in EURO Coordination Board: WPCoordinatorDeputy 1Edgecock (STFC)tbc 2Zito (CEA)Densham (STFC) 3Pozimski (ICL)Meddahi (CERN) 4Wildner (CERN)tbc 5Soler (Glasgow)Cervera (Valencia) 6Hernandez (Valencia)Donini (Madrid)

Responsibilities in EURO Responsibilities in EURO International Advisory Panel:  Activities of WPs  Technical choices  Distribution of resources  Activity planning  1 meeting/year, during annual meeting  Membership: 3 people, not from partners to be proposed by GB (see later)

Appointments Appointments Chair of GB Must be a member of GB Willing to stand  Steve Myers (CERN)

Appointments Appointments Ex-officio members of GB Organisations that should be approached for names From proposal  ECFA representative  IDS representative  MEGLIO representative (if approved)  Others?

Appointments Appointments Members of MB Project leader must be a member Others:  1 each for SB, NF and BB  Not coordinators or deputies  Interim board: Marcos Dracos (SB) Mats Lindroos (BB) Ken Long (NF)

Appointments Appointments Members of IAP Not from partners 1 each from Asia, Europe, US From accelerator, experiment, theory background Knowledge of SB, NF and BB Proposed so far:  Mike Zisman (US)  Alexander Olshevski (Russia)  Sandhya Choubey (India)  Takaaki Kajita (Japan)  Others?

Objectives Objectives Basic philosophy  SB, NF and BB in the same project  Collaboration rather than competition Need to meet DS requirements  CDR(s)  Documents to be presented to appropriate EU bodies  Prepare for next step  CERN Council in our case

Objectives Objectives Plus dissemination Independent comparison

Objectives Objectives ObjectiveDelivery date Define facility comparison criteria18 Undertake interim facility performance for Project Review36 Produce reference design of each facility42 Undertake physics and cost comparison46 Write a CDR for each facility and publish outcome48

Planning Planning Annual meetings:  Plenary meeting for EURO  “Parallel” meetings for WPs  GB meeting, with input from IAP  (Same time as IDS meeting) Proposed dates: November 2008: CERN November 2009: USA November 2010: RAL (Project review) November 2011: Paris

Planning Planning MB: meet as required Dissemination Board: ditto CB: meet ≥3 times a year WPs:  meet as required (but often!)  clearly, phone meetings regularly  organised by WPM All meeting announcements, slides, minutes: website

Publication Policy Publication Policy All publications (internal & external) on website All external publications refereed:  journals – DB member + consortium expert  proceedings – expert Referees responsible for getting comments Making sure they’re implemented Reporting to DB DB authorisation required before publication