OUTLINE TODAY (1) Mid term review (2) Milestones Deliverables: who does what (3.a) Outreach – Dissemination (3.b) Web site (4) Papers plan (5) Trainings.

Slides:



Advertisements
Similar presentations
Nick Brook University of Bristol The LHC Experiments & Lattice EB News Brief overview of the expts  ATLAS  CMS  LHCb  Lattice.
Advertisements

Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
Planning a Mentoring Program A CALENDER FOR A FIRST-YEAR TEACHERS’ PROGRAM.
HLT Collaboration (23-Jun-15) 1 High Level Trigger HLT PRR Planning Volker Lindenstruth Kirchhoff Institute for Physics Chair of Computer Science University.
UGDIE PROJECT MEETING Kranjska Gora – April WP8 - Project Management 3 rd Amendment formalised –Budget transfer request –Time extension request.
ISSUES TO CONSIDER IN YOUR PROJECT This is a short presentation from issues discussed in a meeting of MCS3 on Tues 2 nd March 2004.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
All Hands Meeting DORII Deployment of Remote Instrumentation Infrastructure Norbert Meyer PSNC October 20, 2009, Garching.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement AIDA status report.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
Erik Fröjdh CERN, Mid Sweden University. Characterization of hybrid pixel detectors Applications for dosimetry in mixed radiation fields.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Michał Bochenek Work Package 3: On-Detector Power.
Management Report Annette Freibauer Management Report Annette Freibauer Max-Planck-Institute for Biogeochemistry, Jena.
WP0 Management Gillian Armitt. Outline Objectives for Year 2 Progress Issues resolved/outstanding Forward planning Electronic submission of Form C.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
EPOCA – 11. June EPOCAConsortiumOrganisation.
TALENT Status and Future 16/07/14H.Pernegger, M.Capeans1.
Kick-off Meeting ISPAVE, Rome, Italy Monday February 28 th 2005 V IRO T ICA Co-ordination of Research on Genetic Resistance to Plant Pathogenic Viruses,
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval Annual Review Meeting - Introduction.
EventsDuration of event (days) Dates (months after start) DeliverablesExternal participation (researcher-days, rd), total = 450 rd Kick-off meeting1m1-m2Protocol0.
ERIK FRÖJDH – ESR 2 Mid Sweden University, CERN 14th October 20132nd ARDENT Workshop1.
ATLAS micromegas activities (MAMMA)
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
Overview of the PicoSEC Project Etiennette Auffray, Network Coordinator CERN PH-CMX.
Project Administration Hanna Poikela 22 June 2015 Summer School Edusafe Summer School 22 – 26 June 2015.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement WP8 – Improvement and.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Magnoni Luca Early Stage Researcher WP5 - ATLAS.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association INSTITUT FÜR EXPERIMENTELLE KERNPHYSIK
W. Smith, U. Wisconsin, Upgrade MB, Sept. 9, 2011 Proposal Reviews - 1 Upgrade Peer Review Report Wesley H. Smith U. Wisconsin CMS Upgrade Peer Review.
FP7-People-IAPP-2012 FTK - Project number: Paola Giannetti – INFN & University of Pisa 1 st EU Mid-Term Review meeting Brussels, November 7 th,
OUTLINE (1) Mid term review (2) Milestones Deliverables: who does what (3.a) Outreach – Dissemination (3.b) Web site (4) Papers plan (5) Trainings (scientific.
Project number: Andreas Sakellariou – PRISMA ELECTRONICS 1 st EU Mid-Term Review meeting 7 November 2014.
Planning 2009 JRA1 Meeting, Strasbourg March 4 th 2009 Ingrid-Maria Gregor DESY.
Management: (1) Next GA, EB and trainings (2) Summary 2013 – Planning 2014 (3) AUTH recruitment.
System Demonstrator: status & planning The system demonstrator starts as “vertical slice”: The vertical slice will grow to include all FTK functions, but.
Summary of Deliverables & reached Milestones History and explanation of steps Milestones this year Deliverables: who is going to write what Done & to be.
SC meeting R. Aleksan February 11 th TIARA 1.General Information 2.Final Budget 3.Meeting Objectives 4.Organizational matters 5.Kickoff meeting 6.Conclusion.
Calliope-Louisa Sotiropoulou C OGNITIVE I MAGING U SING FTK H ARDWARE M EETING ON M EDICAL I MAGING.
IAPP-FTK Status Report b e b b   e   hb b  1.5 MEuros 4 Years 6 Institutions.
Status of FTK & requests 2013 Paola Giannetti, INFN Pisa, for the FTK Group ATLAS Italia, Sep 5, 2012 Status of FTK work IMOU NEWS & Future steps TDR with.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
The Monitoring Problem Firmware for the Lost Synchronization Detection Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name:
Summary of Deliverables & Reached Milestones History and explanation of steps Milestones this year Deliverables: who is going to write what Outreach :
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
GC meeting R. Aleksan February TIARA 1.Meeting objectives 2.General Information 3.Final Budget 4.Consortium Agreement 5.Next meetings 6.Conclusion.
ELENA installation progress F. Butin / ELENA collaboration.
GUIDO VOLPI – UNIVERSITY DI PISA FTK-IAPP Mid-Term Review 07/10/ Brussels.
Contract Kari-Jouko Räihä. The Package  Contract (“core contract”) Signed between the coordinator and the commission Accession forms signed by the coordinator.
FTK: update on progress, problems, need
Agenda GA Meeting Siegen 23/02/2016 CONFIDENTIAL
Saverio Citraro PhD Student University of Pisa & I.N.F.N. Pisa
Project definition and organization milestones & work-plan
Summary of Deliverables & reached Milestones
AM system Status & Racks/crates issues
Calliope-Louisa Sotiropoulou
Secondments & tasks Management meetings – Calendar
News – 15 days to submission
Overview of the FEPAC Accreditation Process
Student Administration and Support Programme and Project Timelines
Student Administration and Support Programme and Project Timelines
KICK OFF meeting - project presentation
Student Administration and Support Programme and Project Timelines
Kari-Jouko Räihä WP 8: Training Kari-Jouko Räihä COGAIN Kick-Off Tampere, Finland.
Imaging & Engineering STAP Meeting 12th-13th of April 2018
ONAP Release Planning DRAFT Proposal
Presentation transcript:

OUTLINE TODAY (1) Mid term review (2) Milestones Deliverables: who does what (3.a) Outreach – Dissemination (3.b) Web site (4) Papers plan (5) Trainings (scientific and soft) (6) Career Development Plans (7) Next EB/GA (8) averall schedule

Mid Term Review November 7 at Brussels 1 representative for each Institution, all seconded/recruited persons should participate Report, deliverables, trainings, carrier dev. plans should be delivered one month before: end of September

2014 Program – Deliverables to be ready for August 30 D.4.3. Test Vectors for the SLP2 based FTK R RE M16 Guido/Daniel D.2.3. CAEN power supply ready for integration R RE M18 Marco/Alex D.2.4. FTK cooling and mechanical tests completed R RE M20 Paola D.2.5 SLP2 fully integrated Pub PU M20 paper Pierluigi/Vale D.3.1. FTK demonstrator commissioned Pub PU M22 paper NSS D.6.2. Standard characterization R RE M24 Giovanni

2014 Program - Milestones M.2.2. Slp2 ok at Caen CAEN M20 SLP2 runs flawlessly at CAEN M.2.3. Infrastructure ok at CAEN CAEN M20 Infrastructure validated M.2.4 Compare_technologies CAEN M20 Compare and choose technology M.3.1. Demonstrator ok at Atlas CERN M24 Demonstrator runs flawlessly in Atlas

OUTREACH MILESTONES & Deliverables (to be ready August 30) M.7.1.-M.7.3.Open Days results verificationAUTH M8, M20,M32 Sept. M.7.4. –M.7.6.WorkS. days results verification AUTH M6, M18,M30 JULY M.7.7. –M.7.9.Summer schools results AUTH M7, M19,M31 August D.7.1. IAPP project open days (Pisa- Paola)R PU M7, M19, M31, M43 August D.7.2. Workshop days (Callipe done)R PU M5, M17,M29, M41 June D.7.3. Summer school weeks (boot camp- Chiara)R PU M6, M18,M30, M42 July D.7.4 D.8.3 World wide web site for dissemination R PU M6, M18, M30, M48 July Status of Web site (Kostas-Simone) D.8.1. FTK Workshops (Alessand. Paola done)R RE M1, M13, M30, M46 February D.8.2. Trainings (AUTH – Calliope done)R RE M1, M5, M9, M19, August M29, M47

Web Site

Papers on Peer Review Journal AMBSLP +LAMB + AMchip05  AMsystem LAMB tests with eval board  pub for PHD students (Pierluigi, Saverio, Daniel, Enrico) Calliope TNS paper Christos paper Cooling tests and T-simulation; Infrastructures Other ideas?

OUTREACH - FTK workshops - Trainings SCHEDULE ALL DONE IN PISA first year YEAR 1 YEAR 2 We decided to Swap CERN with PRIELE YEAR 3 This is going to happen now in AUTH Very nice organization – congratulation to AUTH! Training in the LAB with FPGA evaluation boards and VIVADO! Very nice workshop Participation with a talk also at the school on trigger! NEXT year at LPNHE! What do you Plan to offer?

SOFT Trainings

Career Development Plans to be ready July 30 Certainly we need: 1.G. Calderini 2.F. Crescioli 3.D. Dimas 4.S. Donati 5.C. Gentsos 6.N. Kimura 7.K. Kordas 8.K. Mermikli 9.S. Petrucci 10.M. Piendibene 11.D. Sampsonidis 12.A. Sakellariou 13.C.-L. Sotiropoulou 14.G. Volpi Better if have also: Neuroutsos, Citraro, and Panajotis

Management – Meetings (1/2) 1.ANNEX 1: The GA will meet twice per year (M5 & M11 each year) to deal with administrative issues of the project. The EB will meet every 4 months (M3, M7, M11 each year) to assess the progress in research and training aspects. 2.CONSORTIUM AGREEMENT: General AssemblyAt least once a year Executive BoardAt least quarterly PROPOSAL June 2013: approve an “amendment” to CA by EB and GA. - Unless otherwise required by practice, EB will meet 4-monthly

NEXT EB, GA meetings proposal The last GA, EB will be in September to discuss material for the Mid-term review What about Mid of September? Friday September 19?

S. Citraro et al. “The Associative Memory system for the FTK processor at ATLAS”, 11th International Conference on Large Scale Applications and Radiation Hardness of Semiconductor Detectors11th International Conference on Large Scale Applications and Radiation Hardness of Semiconductor Detectors, Florence, Italy, Jul C.-L. Sotiropoulou at al., “A Multi-Core FPGA-based 2D-Clustering Algorithm for High- Throughput Data Intensive Applications”, 14th ICATPP Conference on Astroparticle, Particle, Space Physics and Detectors for Physics Applications14th ICATPP Conference on Astroparticle, Particle, Space Physics and Detectors for Physics Applications, Como, Italy, Sep G. Volpi et al. “Design of a hardware track finder (Fast TracKer) for the ATLAS trigger”, Journal of Instrumentation (Impact Factor: 1.66). 01/2014; 9(01):C DOI: / /9/01/C01045; Topical Workshop on Electronics for Particle Physics, Perugia, Italy, Sep C.-L. Sotiropoulou at al., “A Multi-Core FPGA-based Clustering Algorithm for Real-Time Image Processing”, 2013 IEEE NSS and MIC, Seoul, Korea, Kor, 26 Oct - 2 Nov A. Lanza et al, “The Associative Memory Boards for the FTK Processor at ATLAS”, 2013 IEEE NSS and MIC, Seoul, Korea, Kor, 26 Oct - 2 Nov D. Magalotti et al., “THE ASSOCIATIVE MEMORY SYSTEM FOR THE FTK PROCESSOR AT ATLAS”, 14th ICATPP Conference on Astroparticle, Particle, Space Physics and Detectors for Physics Applications, Como, Italy, Sep 2013,

CONCLUSIONS Interesting work developments Our recruitment – secondment plan is going ahead with changes but all approved by PO We need a lot of work for the Mid Term report submission