AFRICAN PORTS AND MARITIME CONFERENCE EASTERN & SOUTHERN AFRICAN CHALLENGES IN PORTS DEVELOPMENT CHALLENGES IN PORTS DEVELOPMENT PORT LOUIS HARBOUR Aruna.

Slides:



Advertisements
Similar presentations
Port of Duqm Company profile
Advertisements

Information contained in this presentation is accurate as of June 2013 Global Ports Connecting Global Markets.
SEE Port Development A Variation on the Story of the Rabbit and the Turtle Erich Cossutta, President Confindustria Serbia.
Development of the port of Poti by strategic investor in the post-crisis world by Andrii Kuzmenko Poti Sea Port Corp. – an APM Terminals company.
1 Ports and Harbors – Transitions and Challenges Ms. Doris J. Bautch Commissioner, U.S. Section of PIANC U.S. Maritime Administration Presented at the.
A Report to Congress Addressing “the Critical Need for Additional Port and Inland Waterway Modernization to Accommodate Post- Panamax Vessels”
Beaumont LHG Project Review April 2, 2013 NASDAQ: MMLP Confidential.
LVBC 3 RD LAKE VICTORIA BASIN DONORS’ CONFERENCE Round Table Three Economic and Infrastructure Development Lily Kisaka.
Use of hubs in the Container Terminal Industry Carl Jensen, Vice President APM Terminals International (Singapore Regional Office) IAPH Forum, HCMC Vietnam.
Facilitating trade growth and optimising operations at Port Hedland.
Enhancing Port Operations Efficiency Maritime Knowledge Shipping Session 7 - Bulk Cargo Terminals, 24 September 2008 Stuti Nautiyal SimPlus Pte. Ltd.
V IRGINIA I NTERNATIONAL T ERMINALS Joseph A. Dorto November 27, 2012.
Maine Maritime Academy| Castine, Me October 18, 2014 PORT PRODUCTIVITY AND THE CURRENT EFFECTS OF LARGER VESSELS Brendan Neary Project Manager JOC Group.
World Bank Port Reform Toolkit Module 2 The Evolution of Ports in a Competitive World.
Mission Promoting the development and growth of maritime shipping via the kingdom's national port of Aqaba through; mobilizing business skills and concepts.
Lumsden Point Development
1 Indian Port Sector By Hans Ole Madsen – CEO, South Asia for A.P. Moller-Maersk Port Pipavav.
SHIPPING,TRADE TRENDS AND THEIR IMPACTS ON PORT INFRASTRUCTURE
Public Private Partnership in Ports By A.K. Mohapatra Secretary Department of Shipping.
PORT EVERGLADES. 3.7 MILLION CRUISE GUESTS 6 MILLION TONS OF CARGO AND 924,000 CONTAINERS The total value of economic activity at Port Everglades in FY.
Emerging Opportunities in Port Sector By A. K. Mohapatra Secretary, Department of Shipping, Ministry of Shipping, Road Transport &Highways.
PNWA Summer Conference Port of Grays Harbor: Proposed Crude By Rail Projects June 23, 2014 Kayla Dunlap Public Affairs Specialist.
Frankie Yick HKSAR Legislative Councillor (Transport Functional Constituency) 26 th February, Hong Kong’s Shipping and Logistics Sector – Challenges.
1 REPUBLIC OF SUDAN MINISTRY OF ROADS & TRANSPORT SEA PORTS CORPORATION 7th PAPC Conference 2008,PMAESA Council & IAPH Africa-Europe Group MEETING
Port Financial Management Challenges Financing Freight Transportation Improvements St. Louis, Missouri April 29 to May 2, 2001 Financing Freight Transportation.
Introduction ( ) Adoption ( ) Growth ( ) Maturity ( ) World container development stages Introduction of the first “containerized”
General Organisation of Sea Ports (GOP)1 Kingdom Of Bahrain General Organisation of Sea Ports Bader Hood Al Mahmood Head, Port Operations & Regulations.
APM Terminals Lifting Côte d’Ivoire’s trade London, October 30 th 2013.
University of Gothenburg, School of Business, Economics and Law, March 1, 2013 Global Containerized Maritime Shipping: Emergence and Divergence Jean-Paul.
Port Everglades Master / Vision Plan Status Broward County Board of County Commissioners May 4 th, 2010.
Dry Bulk Terminals vs. Offshore Transshipment ICHCA International Conference “ Changes to Trade & Shipping in the 21 st Century ” Busan, S. Korea May 2008.
Plan Formulation for Deep Draft Harbors Navigation Measures.
DJIBOUTI Djibouti Strategic Location. 1.Existing Infrastructures 2.Infrastructures Expansions 3.Future Infrastructures 4.Summary of Development Projects.
Challenges Facing Ports Today Containership capacities and containership fleet continues to expand Global economic development leading to growing world.
 LOCATION: -Located on the left side of Thi Vai river, 5 km from the confluence of Cai Mep Thi Vai and 29.7km (18 NM) away from the “ zero” bouy of Vung.
SHIP REPAIR, VESSEL CONSTRUCTION & BOAT BUILDING IN DURBAN HARBOUR AUGUST 2010 SUMMIT PRESENTATION BY KEN FROISE 1.Introduction 2.Transnet / Ethekwini.
Public Private Participation William Demoor 10 th July 2015.
Information contained in this presentation is accurate as of February 2014 Global Ports Connecting Global Markets.
Regional Resource / Global Gateway Colin Parker, Chief Executive | 27 August 2008.
Vidya Vishal Jerry Wang Grace Zhao Gaobo Zhou February 27th, 2006
Information contained in this presentation is accurate as of February 2014 Global Ports Connecting Global Markets.
CenterPoint Intermodal Center (CIC) Largest master-planned inland port in North America. Situated on ~6500 acres just 40 +/-miles southwest of downtown.
Harbors Module NH2: Problem Identification, Inventory and Forecast, and Determination of Objectives and Constraints.
Port of Port Elizabeth “Investing in the Future” EC Construction Summit 26 March 2015.
Geneva, May The demand and supply of international transport services: The relationships between trade, transport costs and.
1PAGE Outline of the presentation Transnet organisational structure Business overview of TNPA Major investment and infrastructure plan Major investment.
EQ1 EQ 2 EQ 3 EQ 4 EQ 5 EQ 6 EQ 7 EQ 9 EQ 8 EQ 10 WQ 1 WQ 2 WQ 3 WQ 4 WQ 5 WQ 6 WQ 7 WQ 8 VPT – Lay out Map Proposed berths V C T P L NOM LPG CAVERN OHP.
Infrastructure and capacity development of the State Enterprise “Sea Trade Port of “Yuzhny”
Djibouti Ports – DP World Jérôme Martins Oliveira
Port Authority of Guam PB International PORT EXPANSION PLAN.
Gdansk – Seaports Management Conference September 2010 Gdansk – Seaports Management Conference September 2010.
A REVIEW OF MOMBASA PORT PERFORMANCE, CAUSES OF CONGESTION AND WAY FORWARD.
Regional Strategy in Freight Logistics, Maritime Transport and Trade Facilitation The Shipping industry is the oldest industry in the world next to prostitution.
Holding Company for Maritime and Land Transport 1 Holding Company for Maritime and Land Transport Holding Company for Maritime and Land Transport.
Djibouti Ports – DP WorldPresented By Jérôme Martins Oliveira CHIEF EXECUTIVE OFFICER.
International conference "Greening Motorway of the Sea" April 2005 in Stockholm “Environmental aspects of Klaipeda seaport development strategy”
Stewards of Tomorrow 1 THE PORT OF VIRGINIA: KEEPING VIRGINIA’S ECONOMY MOVING JOSEPH P. RUDDY CHIEF INNOVATION OFFICER MAY 19, 2016 JOSEPH P. RUDDY CHIEF.
Port of Everett MASTER PLAN UPDATE April 8, 2008.
Infrastructure and Shipping in Taiwan
Prof.V.M.Mohamed Ali.  Is a facility where cargo containers are transhipped.  The transshipment may be between container ships and land vehicles. 
North Georgia Water Resources Partnership
PORTFOLIO COMMITTEE ON ENVIRONMENTAL AFFAIRS OCEAN ECONOMY:
BEIRUT - RAFIC HARIRI INTERNATIONAL AIRPORT EXPANSION
SUPPORTING THE GROWTH OF EXPORT INDUSTRY TOWARDS A SUSTAINABLE MARITIME TRADE PRESENTED BY ABBA BELLO, MD/CE NIGERIAN EXPORT – IMPORT BANK (NEXIM)
Cargo Solutions for Palma, Mozambique.
PORT OF EVERETT MARINE TERMINALS MASTER PLAN UPDATE
Access to Opportunity in the Global Economy of the 21st Century
Djibouti Ports – DP WorldPresented By Jérôme Martins Oliveira CHIEF EXECUTIVE OFFICER.
Damietta Container & Cargo Handling Co.
Introduction: Aden Container Terminal is the largest container terminal in Yemen and currently operated by the Aden Ports Development company (APDC). The.
Presentation transcript:

AFRICAN PORTS AND MARITIME CONFERENCE EASTERN & SOUTHERN AFRICAN CHALLENGES IN PORTS DEVELOPMENT CHALLENGES IN PORTS DEVELOPMENT PORT LOUIS HARBOUR Aruna Bunwaree Ramsaha Deputy Director-General Mauritius Ports Authority November 2011

A G E N D A OVERVIEW OF PORT-LOUIS HARBOUR EVOLUTION OF CONTAINER TRAFFIC - WORLDWIDE & REGIONWISE STRATEGY OF SHIPPING LINES MAURITIUS MEETING THE CHALLENGES  Extension/Dredging MCT  Capacity Building  Strategic Partnership for Container Handling Operator

Port Louis Harbour Sheltered Port located in the capital city of Port Louis Sheltered Port located in the capital city of Port Louis Sole maritime gateway of Mauritius handling 99 % of external trade Sole maritime gateway of Mauritius handling 99 % of external trade Contributes 2% to the country’s GDP Contributes 2% to the country’s GDP

Aerial View Terminal III – Mauritius Container Terminal 560 m x 14.0 m Terminal III – Mauritius Container Terminal 560 m x 14.0 m Cruise Jetty 124 m x 10.8 m Cruise Jetty 124 m x 10.8 m Oil Jetty 270 m x 14.5 m Oil Jetty 270 m x 14.5 m Terminal I – Fishing Port and quays A, D and E and quays A, D and E 830 m x 5.5 – 12.2 m Terminal I – Fishing Port and quays A, D and E and quays A, D and E 830 m x 5.5 – 12.2 m Terminal II – Multipurpose Terminal 700 m x 12.2 m Terminal II – Multipurpose Terminal 700 m x 12.2 m

Terminal III – Mauritius Container Terminal (MCT) Commissioned in 1999 Terminal area: 27.5 ha, Container yard: 15 ha Annual Throughput capacity: 550,000 TEUs Dredged depth in Channel : 14.5 m Total Quay length: 560m 5 post panamax quay cranes 8 RTGs 288 reefer points Container scanner Commissioned in 1999 Terminal area: 27.5 ha, Container yard: 15 ha Annual Throughput capacity: 550,000 TEUs Dredged depth in Channel : 14.5 m Total Quay length: 560m 5 post panamax quay cranes 8 RTGs 288 reefer points Container scanner 560 m long with a dredged depth of 14.0 quay

Port Trade Performance 2010 – Port Louis Harbour Total Traffic 6.2 MT (+6%) Dry Bulk Traffic (Cement, Coal, Wheat, Sugar…) Liquid Bulk Traffic (Petroleum Products, Molasses…) 1.8 MT (+2.) 1.5 MT (+2%) Total Container Throughput 442,654 TEUs (+8%) Captive Container 222,670 TEUs (+15%) Transhipment Container 219,984 TEUs (+3%) Total Fish Traffic 155,773 tonnes (+37%) Vessel Calls 2,172 (+5%) Container vessels: 503(-6%) Fishing vessels : 708 (+10%)

Total Container (Captive + Transhipment) Throughput by Shipping Line - CY2010 * Includes DAL, others

Total Captive (Import + Export) Container Traffic by Shipping Line – CY2010 * Includes DAL, others

Total Transhipment (Empty + Laden) Container Traffic by Shipping Line – CY2010 * Includes PIL, DAL, Coraline, Mitsui, UAFL

Overview of World Container Traffic Million TEUS World Container Traffic World Container Throughput Source: Drewry Shipping Consultants Growth in both Container Traffic and Throughput linked to increase in international trade and adoption of containerisation as privileged vector for maritime shipping and inland transportation. Ratio of Container Traffic to Container Throughput has increased from 3.0 in 1990 to 3.5 in 2008 underlying the complexities of global supply chains. Based on above trend world Container Throughput expected to increase by 6% to reach 1.1 billion TEUs by 2020.

Container Traffic in East Africa and the Islands The container throughput in South Africa was 3.63 million TEUs in The other countries on the East Africa coast and the Islands accounted for 2.35 million TEUs in The total throughput in the South and East African Region is therefore about 6.3 million TEUs. This part of the world is expected to register growth of about 7.4 % annually as from By 2020 the container traffic may reach 8-10 million TEUs Source: Ocean Shipping Consultant

Strategy of Shipping Lines Piracy attacks in Indian Ocean are forcing shipping lines to review their East-West routes. For e.g vessels plying from Far East to South America whilst avoiding the risky zone have the option to call at Ports located more on southern part thus representing a window of opportunities for Ports such as Port Louis. Shipping lines are ordering larger and larger container vessels and currently several 18,000 TEUs vessels are on order. 8,000 + TEUs vessels will be shifted on to the Indian Ocean/ South African region. MSC has already mobilised three container vessels (Charlston, Chicago and Bussan) having capacity of 8000+TEUs on the South Africa Route. These vessels are calling at Port Louis with a reduced draft and also call at Reunion, Durban and Coega.

Strategy of Shipping Lines (cont’d) In the recent past, request was received to accommodate Mersk Emma, 11,000 TEUs at Port Louis Harbour. This request could not be entertained even with a reduced draft. Shipping lines are requesting for additional water depth, good service level, minimum waiting time, competitive port tariff so as to maximise on the vessels capacity and reduce shipping costs. Shifting from 4000 to 8000 TEUs vessels result in savings on shipping costs of about %. Countries such as Mauritius, have no option but to develop the port to provide longer berth, deeper draft and more powerful tugs.

Ports in the Region Geared for Large Vessels The only ports capable to accommodate the 8,000 TEUs vessels without restriction in the area are Coega and Durban. The draft at Port Louis harbour and Reunion are 14 m at berth. The 8000 TEUs vessels are presently calling at Port Louis Harbour with a reduced draft ie not fully loaded. The capacity of the vessels are therefore not being maximised and the benefits to use large vessels are not being met. Most of the existing Quay Cranes are Post Panamax and have an outreach of 16 containers across. The 8000 TEUs vessels have 17 containers across. New RMQC capable to pick a container on the last row will be required. More powerful Tugs will be required to handle these larger vessels

Port Master Plan Study Findings Findings: Captive container traffic would increase from 176,000 TEUs in 2006 to 257,000 TEUs in 2015 and 475,000 TEUs in Transhipment container traffic would increase from 357,000 TEUs in 2006 to 811,000 TEUs in 2015 and 2.3 Million TEUs in 2030 (high case scenario). Consultants recommended the expansion of the Container Terminal so as to obtain a quay length of 1000m and a capacity of 950,000 TEUs. In 2009 Master Plan, Messrs. Halcrow in association with Drewry prepared the forecasts based on data up to 2006 (i.e before financial crisis).

Traffic Study (Post Financial Crisis)  Captive traffic will increase in line with GDP i.e. at around 4%  Transhipment traffic will grow at a much lower rate i.e. at 3.5% (low case scenario of Drewry)  Total throughput will reach 615,000 and 817,000 TEUs by 2020 and 2030 respectively. Another Study carried out by Messrs. AECOM for Port Louis Harbour revealed the following:

Case of Port Louis Harbour Mauritius has already a capacity of 550,000 TEUs capable of catering for the captive traffic in the long term. Mauritius Container Terminal initially designed as a 2 berths facility for 5,000 TEUs vessel. It is equipped with 5 post panamax cranes with an outreach till the 16 th row. 8,000 TEUs vessels with 17 rows not fully loaded already call at Port Louis. 8,000 TEUs vessels once fully loaded require dredged depth of 16.5 mts. Port expansion is required to accommodate larger vessel and resulting extra port capacity will have to be used for transhipment traffic.

By not expanding the terminal, there is the risk that shipping lines skip Port Louis. Cargo for Port Louis will be transhipped through other ports. The island will lose precious connectivity causing delays in export of goods. Cost of exports and imports will be increased thus rendering the Mauritian product less competitive on the international market. Case of Port Louis Harbour (cont’d)

Extension of Container Terminal Proposed extension of about 240 mts in Phase I. Strengthening and upgrading of existing berths of 560 mts. Dredging to depth of m. Expansion of Container Yard by 7.5 ha. Annual throughput capacity of 750,000 TEUs. Estimated cost of Project: USD M Completion date : End 2014 Phase 1 Phase 2

Extension of the Container Terminal (cont’d) October 12, 2015 Page 20 Phase I Extension Works will yield the following results:  5 existing post panamax cranes will be able to reach 17 th row and service better 8,000 TEUs vessels.  Facilities designed to accommodate two 12,000 TEUs vessels with super post panamax cranes capable of reaching 23 rd row.  Designed dredged depth of 18 mts for facility will allow the accommodation of 14,000 + TEUs vessels in the long term.

Dredging to -16.5m October 12, 2015 Page 21 The navigational channel and a box cut of about 150 x 150m beyond the existing quay has already been dredged to m ACD. Part of the channel (in white) is about 17 m deep. The area shaded in blue will be dredged to m ACD. The dredging work is expected to be completed with 17 months from start of work i.e around 3 rd quarter of 2013.

240m Extension + Quay Strengthening October 12, 2015Page months 4 months 6.5 months 7.5 months Total Project Duration 31 months

Capacity Building More powerful tugs required to manoeuvre bigger vessels. Acquisition of new floating craft: − 1 big tug of 80 tons bollard pull to reinforce existing fleet. − 1 maintenance dredger. − 1 pilot boat − 4 pontoons Yard equipment being looked into by operator/Strategic Partner.

Strategic Partnership Project Growth in container traffic is highly dependent on transhipment. To optimise investment in enhanced facilities, transhipment volumes have to be increased. Service level at Port Louis Harbour has to be improved. October 12, 2015Presentation TitlePage 24 → Average pre-berthing delay currently stands at 1.6 hours. → Average number of moves/gross crane hour is around 18. → Berth occupancy currently at 61.4%. Exercise for selection of a Strategic Partner for Container Handling Operator already engaged.

Strategic Partnership Project (cont’d) Services of International Finance Corporation (IFC) as Transaction Adviser have been retained. October 12, 2015Presentation TitlePage 25  Selected Strategic Partner would have to guarantee certain transhipment volumes over the concession period.  Strategic Partner would be given the right to assume control over the operations of the Cargo Handling Corporation Ltd.  Strategic Partner would be required to invest in such operations. After Prequalification exercise, 5 bidders have been shortlisted. RFP Phase has been launched. Exercise expected for closure March 2012 Criteria for selection of SP include the following:

Breakwater and Container Terminal – Long Term Construction of 2 km breakwaterConstruction of 2 km breakwater Dredged depth: 18 mDredged depth: 18 m Reclaimed land: 60 HaReclaimed land: 60 Ha Container TerminalContainer Terminal Quay length: 1 kmQuay length: 1 km Container yard: 40 HaContainer yard: 40 Ha Throughput capacity: >1 M TEUsThroughput capacity: >1 M TEUs Estimated costs: US$ 303 M/ Rs. 10 BillionEstimated costs: US$ 303 M/ Rs. 10 Billion

Port Louis Harbour – Long Term

Thank You