CMS Week, CERN, 15-19 September 2003 16 Sep 2003CMS Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 16 Sep.

Slides:



Advertisements
Similar presentations
CMS Week, CERN, Sep Sep 2003Tracker Week - Bonding WGSalvatore Costa - Catania Working Group Business.
Advertisements

CMS Week, CERN, June Jun 2004CMS Week - Bonding WGSalvatore Costa - Catania Documentation of the loop of the to-be-pull-tested bonds placed.
CMS Tracker Week, CERN, July July 2003Tracker Week - Bonding WGSalvatore Costa - Catania Bonding-DB Usage or lack thereof.
16 Jul 2002Tracker Week - Bonding WGSalvatore Costa - Catania Status Report on Bonding at Catania Salvatore Costa University and INFN – Catania.
03 Dec 2002CMS Week - Bonding WGSalvatore Costa - Catania Status Report on Bonding at Catania Salvatore Costa University and INFN – Catania.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.
Slide 1US silicon group meeting 5/6/2003 Hybrid Testing Status 10 new hybrids brought by Lenny all tested à 9 tested with no flaws à 1 had 1 chip + 1 wirebond.
1 Hybrid & Module Testing Status Week of 6/6-6/10.
Finding ST Sensors that cause CMN: A Follow up to TSC Meeting N. 215 Prof. J. Incandela UC Santa Barbara US CMS Tracker Project Leader Tracker Steering.
UCSB Encapsulation Studies UC Santa Barbara Based upon a 6 week study by F. Garberson in collaboration with A. Affolder, J. Incandela, S. Kyre and many.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
Andrea Giammanco CMS Tracker Week April DS ROD Prototype: “final” optohybrids “final” CCUM integrated in the rod with new FEC_to_CCUM adapter (Guido.
March 17, 2003 Catania, Meeting ST - CMS CMS Sensor Quality Frank Hartmann – University of Karlsruhe 1 Summary of Sensor Quality Tests List of Problems.
Frank Hartmann --- Karlsruhe 2 nd bond test 2nd bond test pieces received from institutes sent in their 2nbond sample Torino, Wien, Karlsruhe, FNAL,
04 Dec 2001CMS Week - Bonding WGSalvatore Costa - Catania Writing Bonding Data into the CMS Tracker Construction Database Salvatore Costa University and.
CMS Tracker Week, CERN, July July 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting.
CMS Tracker Week, CERN, Apr Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Module Production ___________ Report on.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
CMS Week, CERN, December Dec 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
CMS Tracker Week, CERN, April Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
CMS Tracker Week, CERN, October Oct 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, Mar Mar 2004CMS Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università di.
22 Oct 2002Tracker Week - Bonding WGSalvatore Costa - Catania Status of Database Interface for Bonding Data Salvatore Costa University and INFN – Catania.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
10 April 2003Salvatore Costa, INFN Catania1 CMS Tracker Week CERN, 10 Apr 2003 Entering Bonding Data in TrackerDB.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
CMS Tracker MPR, CERN, 22 November Nov 2004CMS Tracker MPRSalvatore Costa - Catania Module Bonding Working Group Salvatore Costa Università di.
CMS Week, CERN, June June 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
CMS Tracker Week, CERN, February Feb 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, June June 2004CMS Week - TPOSalvatore Costa - Catania Repair Centers, from a Bonder’s point of view Reported by: Salvatore.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Strasbourg status Ring 7 pilot run François Didierjean.
CMS Tracker Week, CERN, February Feb 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
Gantry meeting September 2003 Lenny Spiegel, FNAL 1 FNAL Bonding Statistics are shown for the last 17 modules (mini-production). Wire bonding has been.
Tracker Week, CERN, Feb Feb 2004Tracker Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università.
CMS Tracker Week, CERN, April Apr 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Bonding WGSalvatore Costa - Catania Which strips should the Bonders skip because of known.
Status Report on Bonding at Catania
Bonding web site, renovated
On behalf of the US TOB testing group
UCSB Testing Status Anthony Affolder
Hybrid & Module Testing Status
Executive summary from Bonding WG Meeting 21 Oct 2003
UCSB Testing 3 Stereo Modules Tested 1 SS6 Module Tested
Hamburg Bonding Report
Vienna Module Production
Module Failures on RODs
Discoloration of Passitivation
Module production in Italy
TEC Module Production Overview
Bari production centre resp. M. de Palma
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
FNAL Module Testing Status
Hybrid Status/Deliveries
First UCSB TEC Module (Pictures)
Anthony Affolder UC Santa Barbara
Module Testing in Florence Carlo Civinini INFN-Florence
Module Testing Status Week of 6/14-6/20.
Isolated Bad-CAC Strip at UCSB
Hybrid & Module Testing Status
Module Failures on Rods
Module Testing Status Week of 3/14-3/18.
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
FNAL Bonding Since our last report we have built and bonded an additional 10 TOB 4-chip modules 3 RMT pitch adapters 7 Planar pitch adapters By adjusting.
Università di Catania and INFN – Sezione di Catania
Università di Catania and INFN – Sezione di Catania
FNAL Hybrid Testing Status
Presentation transcript:

CMS Week, CERN, September Sep 2003CMS Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 16 Sep 2003 Salvatore Costa INFN Catania

16 Sep 2003CMS Week - Module Production2 Salvatore Costa - Catania Summary of recent TIB&/TOB prod

16 Sep 2003CMS Week - Module Production3 Salvatore Costa - Catania Summary of recent TIB&/TOB prod

16 Sep 2003CMS Week - Module Production4 Salvatore Costa - Catania Summary of recent TIB&/TOB prod #bonded Problems or lack of Rework New defects by Bonding Pull Tests on PA TAs Pull Tests on 50 th PA-Sen rate BARI (old PA) 7 Yes: varying par w/ PA, edges 0-10 (avg=3.3) per Mod No~ 8 g (new PA) 5 No: same par for all Pas 0 in 4 Mod 2 in 1 Mod for pad cleanliness No3 FIRENZE (new PA) 8No On 2 Mod: 2 bias ring- capacitor g No diff w/ area ~ 9 g Uniform across det 3 PISA (new PA) 13/16 No further details on bonding. Data not in DB yet The 3 not-yet-bonded modules had mechanical or IV problems ? TORINO (new PA) 8No 4 x 3areas 10.0 ± 0.8g 9.7 ± 1.33 FNAL (old PA) Report on last 17 See next slideNo ~8 ± 1 by eye See plot 3 UCSB (old PA) 54 10: at edges of PA or for pad cleanliness << 10 2 missing (besides those to be skipped) to find par (vary w/ single RMT PA) NOTE: 45m to find par vs.15m tot for bonding! 7

16 Sep 2003CMS Week - Module Production5 Salvatore Costa - Catania FNAL Bonding Bonds are skipped for pinholes (Idiel) and selected cases of Cac. ARCS testing following bonding revealed no new pinholes (17K bonds).

16 Sep 2003CMS Week - Module Production6 Salvatore Costa - Catania FNAL Bonding Sen-to-PA pull test data for odd-numbered modules Units are in grams. RMT PA’s US power adjusted based on results.

16 Sep 2003CMS Week - Module Production7 Salvatore Costa - Catania 50 th wire pull test The recommended way to perform it …… 100

16 Sep 2003CMS Week - Module Production8 Salvatore Costa - Catania DB I/F v. 3.0 Added section "Module Pull Tests" for the newly decided pull tests to be performed on bonds made in the PA Test areas, and on a sample (suggested: every 50th) of real PA-Sen and Sen-Sen bonds. Added section on "Hybrid Quality Control " requested by the Strasbourg group. It concerns quality control of the bonds made on Hybrids by the producing Company. Added section on "Hybrid's APV Control Side Bonds Pull Tests" requested by the Strasbourg group. It concerns pull tests on the bonds made on Hybrids by the producing Company. These tests, which are destructive, are done on Hybrids rejected for other reasons and are themselves part of the Hybrid Quality Control process. Removed the check that required Sensor's calibration data (IDIEL, CAC100HZ) to exist in order to serve the "Module Bonding" forms This was decided at the July 2003 Tracker Week, on the argument that bonding all strips is better than not bonding those Modules at all.