E. KAKO (KEK) 2009' Dec. 22 S1-G Webex meeting Global Design Effort 1 Final Results of KEK Cavities for S1-Global Eiji Kako (KEK, Japan)

Slides:



Advertisements
Similar presentations
E. KAKO (KEK) 2010' July 27 meeting Global Design Effort 1 Low Power RF Tests (3) in S1-G.
Advertisements

E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Operational Results from STF-VTS and Cryomodule Tests at KEK Eiji Kako (KEK, Japan)
6/Nov/2012 TTC Meeting 1 Improvement of cavity performance by T-mapping/X-ray-mapping, optical inspection and local grinding Kirk.
KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene.
Recent Surface Studies in KEK-STF
WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.
E. KAKO (KEK) 2009' Sept. 30 Albuquerque Global Design Effort 1 Cavity Test Items in S1-G Cryomodule Eiji Kako (KEK, Japan)
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
2014/3/25TTC Meeting Radiation measurement and comparison between VT/CM tests at KEK-STF Kirk.
ILC08 Chicago Global Design Effort 1 Discussion of Optical Inspection and Temperature mapping Results Several new inspection and mapping systems.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
STF B.L.C. #4 second Vertical Test Summary Period : 2006/09/05~09/08 Contents : ▪ Q 0 -E acc 2K&4K ▪ Q 0 &E acc time 2K&4K ▪ Summary.
Status of cavity fabrication facility at KEK H. Hayano, KEK Cavity Industrialization Study at KEK Superconducting RF Cavity Technology and Industrialization.
Summary of Main Linac SCRF-part H. Hayano, ILC08 at UIC.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
Superconducting rf test facility STF 1 Optical Inspection update at KEK Ken Watanabe ( KEK ) ILWS08 in Chicago 17-Nov-08.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
Experimental Comparison at KEK of High Gradient Performance of Different Single Cell Superconducting Cavity Designs. F. Furuta, K. Saito, T. Saeki, H.
Cavity Gradient for the R&D and ILC Operation Akira Yamamoto ILC-GDE SCRF Presented at the AD&I meeting held at DESY, Dec. 2-3, 2009 A, Yamamoto,
E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)
R.L. Geng, KEK September 9, 2010 Global Design Effort 1 Near Term ILC Gradient R&D R&D Specification and Standardization Gradient Gradient Yield/Scatter.
1 E. KAKO (KEK) 2012' May 28 Clermont 1 A_RD_03 R/D for the High Power Couplers for ILC Walid KAABI (LAL-Orsay, France) Eiji KAKO (KEK, Japan)
E. KAKO (KEK) 2010' April 20 meeting Global Design Effort 1 Eiji Kako (KEK, Japan) Cavity Test Plan in S1-Global Cryomodule.
28/Jul/ Test Results of the International S1-Global Cryomodule Kirk.
Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC
Cavity status; recent KEK activities : Hayano (1)STF CM-1 cavities are; MHI MV/m for CM-1 ILC cryomodule (3-rd VT) MHI MV/m for.
Sample tests for stain problem at KEK LCWA2009 at Albuquerque 01 Oct T. Saeki 1.
KEK Status Report Kirk 04/Mar/20151LCC 5th SCRF Meeting.
LCWS13 at Tokyo, 2013 Nov. 121Eiji Kako (KEK, Japan) Status of STF2 Input Couplers Eiji KAKO (KEK, Japan)
E. KAKO (KEK) 2009' Dec. 2 5 STF Meeting for S1-G Global Design Effort 1 Cavity string assembly at KEK for S1-Global Eiji Kako (KEK, Japan)
1.Report from PMs 2.Report from GLs 3.Special report and discussions 1.SCRF report at AAP and response from AAP (C. Ginsburg, R. Geng) 2.S1-Global assembly.
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
E. KAKO (KEK) 2010' Nov. 02 S1-G Webex meeting Global Design Effort 1.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
E.Kako (KEK) 2009.Dec. 26 1 S1-Global Cryomodule Overview No connection No beam tube No gate-valve Closed by Blind Flange Gate-valve Pumping system Pumping.
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
E. KAKO (KEK) 2010' Feb. 23 Webex meeting S1-G Global Design Effort 1 Status of Cryomodule-A for S1-Global at KEK Eiji Kako (KEK, Japan)
KEK-STF Vertical Test and Diagnostics Brief History & Future Plan Vertical Test Facility Cavity Diagnostic System Example of MHI#7 Cavity Summary of T-mapping.
E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 1 Summary of Low Power RF Tests in S1-G Cryomodule E. Kako, H. Hayano, S. Noguchi,
Current study status of high gradient at KEK Fumio Furuta KEK SCRF meeting Fermilab. Apr
Cavity status; recent KEK activities MHI-06, MHI-7, MHI-8 were vertical tested on June, July.  EP acid (1000l) was re-newed on May 15. These cavity was.
Recent Results of Vertical Test for S1-Global Project at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori,
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
Explosive Events during V.T. in KEK ECFA (2013/5/30) 1.
ILC Gradient R&D Rongli Geng Jefferson Lab ILC Main Linac WebEx Meeting July 28, 2010.
Summary of Results and Development of Online Monitor for T-mapping/X-ray-mapping in KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Satoh, T. Shishido,
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
1 Tuner performance with LLRF control at KEK Shin MICHIZONO (KEK) Dec.07 TTC Beijing (Michizono) S1G (RDR configuration) - Detuning monitor - Tuner control.
Eiji Kako (KEK, Japan)TTC at Cornell, 2013 June 13 1 HOM absorbers; KEK HOM couplers in injector Eiji Kako (KEK, Japan)
HOM-BPM study in STF for cavity miss-alignment detection
ILC10 Beijing Global Design Effort
Degradation and Recovery of Cavity Performance
Inspection of STF Baseline cavity #5 and #6
S1-G for TTC meeting Global Design Effort
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
S1-G Webex meeting Global Design Effort
Magnetic shields inside and outside LHe tank in S1-Global cryomodule assembly at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Sato, T. Shishido, K
Recent VT Results in the STF-2 cavities
2. SCRF General Preparation for the AD&I Preparation for AAP Review
Vertical Test System and T-mapping/X-ray-mapping at KEK-STF
WG3: Main Linac SCRF(cavity,cryomodule)
KEK injector cryomodule
Performance Degradation cERL Injector Cryomodule
TTC meeting at Milano, 2011' Feb. .28
TTC meeting, Milano Global Design Effort
Cavity Degradation Experience at S1-Global
Cavity & Cavity Integration; recent KEK activities
Presentation transcript:

E. KAKO (KEK) 2009' Dec. 22 S1-G Webex meeting Global Design Effort 1 Final Results of KEK Cavities for S1-Global Eiji Kako (KEK, Japan)

E. KAKO (KEK) 2009' Dec. 22 S1-G Webex meeting Global Design Effort 2 STF1S1-Global STF Phase-1 ave. Eacc,max = 23 MV/m S0 4 KEK cavities for S1-G ave. Eacc,max = 29 MV/m

E. KAKO (KEK) 2009' Dec. 22 S1-G Webex meeting Global Design Effort 3 4 MHI cavities for S1-G ave. Eacc,max = 29 MV/m (2008, Dec. ~ 2009, Dec.) 4 MHI cavities for STF-1 ave. Eacc,max = 23 MV/m (2006, Feb. ~ 2007, Feb.) Final VT Results of MHI Cavities

E. KAKO (KEK) 2009' Dec. 22 S1-G Webex meeting Global Design Effort 4 Eacc,max (cell) by Passbands modes Meas. MHI-05 3rd  mode; Eacc,max = 27.1 MV/m Quench MHI-06 6th  mode; Eacc,max = 27.7 MV/m Quench by Field emission  mode; Eacc,max = 27.0 MV/m MHI-09 3rd Quench  mode; Eacc,max = 33.6 MV/m MHI-07 2nd Quench

E. KAKO (KEK) 2009' Dec. 22 S1-G Webex meeting Global Design Effort 5 Summary Four KEK cavities for S1-Global MHI-05 cavity, Eacc,max = 27.1 MV/m MHI-06 cavity, Eacc,max = 27.7 MV/m MHI-07 cavity, Eacc,max = 33.6 MV/m MHI-09 cavity, Eacc,max = 27.0 MV/m Average Eacc,max = 28.9 MV/m