0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.

Slides:



Advertisements
Similar presentations
To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 15 Resource Planning.
Advertisements

Production Planning Devaki Nadkarni Production Planning Annual demand by item and by region Monthly demand for 15 months by product type Monthly demand.
Principles of Operations Management
Material Requirements Planning (MRP)
CHAPTER MRP and ERP Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights.
Material Requirements Planning (MRP)
Materials Requirements Planning. Collins Industries  Largest manufacturer of ambulances in the world  International competitor  12 major ambulance.
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
21–1. 21–2 Chapter Twenty-One Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Materials Requirements Planning (MRP) Material Requirement Planning (MRP)  MRP determines the number of components and raw material required and their.
Material Requirements Planning Dr. Everette S. Gardner, Jr.
DOM 301 : Operations Management Practice
1 Chapter 15 MRP and ERP. 2 Dependent demand: Demand for items that are subassemblies or component parts to be used in production of finished goods. Dependant.
MRP, MRP II, and ERP.
Chapter 12 MRP and ERP.
Material Requirements Planning
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
MRP Material Requirements Planning. MRP …is a planning and scheduling technique used for batch production of assembled items. … is a computer-based information.
Material Requirements Planning (MRP) Computer-based information system for ordering and scheduling of dependent-demand inventories, i.e. what is needed,
13-1MRP and ERP. 13-2MRP and ERP  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements.
Operations Management
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 14 MRP and ERP.
Week #14-2 Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
1 Example: MRP Schedule LocoMopeds is a manufacturer of off-road mopeds. The following product structure diagram represents the bill of materials for.
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc. Upper Saddle River, N.J Material.
Materials Requirements Planning
Operations Management Material Requirements Planning
1 Slides used in class may be different from slides in student pack Chapter 16 Materials Requirements Planning  Material Requirements Planning (MRP) 
Resource Requirements Planning:
Dependent demand lumpy MRP DETAILED SCHEDULE FOR RAW MATERIALS & COMPONENTS USED IN THE END PRODUCTS MASTER SCHEDULE FOR END ITEMS.
Resource Planning OPIM 310-Lecture #7 Instructor: Jose Cruz.
Chapter 12a Resource Requirements Planning: MRP and CRP.
Material Requirements Planning
Materials Requirements Planning
Chapter 15 MRP and ERP.
1 Materials Requirements Planning. 2 Material Requirements Planning Defined Materials requirements planning (MRP) is a means for determining the number.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1998 Material Requirements Planning (MRP) Chapter 15 11/7/05 Overview Position of MRP in Operation.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Advanced Concepts in Material Requirements Planning Chapter 11.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Resource Planning Operations Management Chapter 15 Roberta Russell.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 12 Resource Planning.
Material Requirements Planning (MRP)
© The McGraw-Hill Companies, Inc., Master scheduling Material requirements planning Order scheduling Weekly workforce and customer scheduling Daily.
1 MRP and ERP Chapter Transparency on aggregate to master plan.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 18 Material Requirements Planning.
Chapter 15 Resource Requirements Planning: MRP and CRP.
CAPACITY MANAGEMENT Nyoman Pujawan.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
Resource Planning Chapter 15.
Materials Requirements Planning
Operations Fall 2015 Bruce Duggan Providence University College.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Manufacturing Systems Engineering
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
BUAD306 MRP.
11-1  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements for end items into time-phased.
Material Requirement Planning Kusdhianto Setiawan, SE, Siviløkonom Faculty of Economics – Gadjah Mada University.
15-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved Chapter 16 Materials Requirements Planning.
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 MRP and ERP.
MRP and ERP  Material Requirements Planning (MRP) is a software based production planning and inventory control system used to manage manufacturing processes.
Chapter 13 MRP: Material Requirement Planning ERP: Enterprise Resource Planning.
Facility Inventory Old Facilities Modern Facilities Classroom Size
MRP and ERP.
CHAPTER 14 MRP and ERP.
MRP and ERP.
14 MRP and ERP.
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing

1 Chapter 11 Resource Requirements Planning Systems: Material Requirements Planning (MRP) and Capacity Requirements Planning (CRP)

2 OverviewOverview l Resource Requirements Planning l Material Requirements Planning (MRP) l Capacity Requirements Planning (CRP) l Wrap-Up: What World-Class Producers Do

3 Resource Requirements Planning Master Production Scheduling (MPS) Material Requirements Planning (MRP) Capacity Requirements Planning (CRP) AggregatePlanning ResourceRequirementsPlanning Chapter 9 Chapter 11

4 Material Requirements Planning (MRP)

5 Materials Requirements Planning (MRP) l Computer based system l Explodes Master Schedule (MPS) into required amounts of raw materials and subassemblies to support MPS l Nets against current orders and inventories to develop production and purchased material ordering schedules

6 Objectives of MRP l Improve customer service l Reduce inventory investment l Improve plant operating efficiency

7 Order Changes Order PlanningReport Elements of MRP MRPSystem Planned Order Schedule Inventory Transaction Data Bill of Materials File Materials File MasterProductionSchedule Inventory Status File Service-Parts Orders and Forecasts Performance Performance ExceptionReports InputsOutputs

8 MRP Computer Program l Begins with number of end items needed l Add service parts not included in MPS l Explode MPS into gross requirements by consulting bill of materials file l Modify gross requirements to get net requirements: l Net Requirements = Gross Requirements + Allocated Inventory + Safety Stock - Inventory On Hand - Inventory On Hand l Offset orders to allow for lead time

9 Outputs of MRP l Planned order schedule - quantity of material to be ordered in each time period l Changes to planned orders - modifications to previous planned orders l Secondary outputs: l Exception reports l Performance reports l Planning reports

1010 Lot-Sizing in MRP l Lot-size is the quantity ordered/produced at one time l Large lots are preferred because: l Changeovers cost less and capacity greater l Annual cost of purchase orders less l Price breaks and transportation breaks can be utilized l Small lots are preferred because: l Lower inventory carrying cost l Reduced risk of obsolescence l Shorter cycle time to produce customer order

1 The best method, resulting in least cost, depends on cost and demand patterns. Lot-Sizing Methods l Economic Order Quantity (EOQ) l does not consider quantity discounts l does not always provide the most economical approach with lumpy demands l Lot-for-Lot (LFL) l accommodates lumpy demand l Period Order Quantity (POQ)

1212 Issues in MRP l Lot-Sizing l Useful at lower levels but may drive excess inventory when applied at higher levels l Net Change versus Regenerative MRP l Net change may generate too many action notices l Regenerative more costly to run but appears to be easier to manage l... more

1313 Issues in MRP l Safety Stock l Use depends on uncertainty of demand..... more uncertain the greater the need for safety stock l Assemble-to-Order Firms l MPS and MRP treated separately from Final Assembly Schedule(FAS) l Use Modular Bill of Material

1414 MRP I to MRP II l MRP I simply exploded demand (MPS) into required materials l MRP II became Manufacturing Resource Planning which provides a closed-loop business management system l Financial management l Shop floor control l Operations management l Simulation capability

1515 Evaluation of MRP l Most beneficial to process-focused systems that have long processing times and complex multistage production steps l Lead times must be reliable l Must freeze MPS for some time before actual production... certain demand l Difficult to implement

1616 Capacity Requirements Planning (CRP)

1717 l Tests MPS for feasibility l Utilizes routings to determine labor/machine loads l If schedule feasible, recommends freezing l If schedule overloads resources, points out processes that are overscheduled

1818 Load Schedules l Compares actual labor and machine hours against available hours l Offsets schedules between successive stages of production by lead times l Provides feasible MPS and economically loaded work centers l Promotes system operating efficiency... lowers costs!

1919 Wrap-Up: World-Class Practice l Lead times respond to conditions l Product development as levels of product structure tree l Lead times that adjust to load l MRP reports shared with customers and suppliers l All of the above results in bias towards smaller batches and shorter lead times

2020 End of Chapter 11