Distribution Requirements Planning Logistics Workshop Asia 2004 Phnom Penh, Cambodia 10 – 14 May 2004.

Slides:



Advertisements
Similar presentations
The Coin Game. SUPPLY CHAIN BASICS Key Learning Points: The dynamics of a supply chain The benefits to be gained from Supply Chain Visibility Demand/Supply.
Advertisements

Global Supply Chain Procurement and Distribution
Supply Chain Management
Distribution Strategies
Distribution Requirements Planning
Transportation in a Supply Chain
MRP and Related Concepts
Supply Chain Management. Facilities Along the Supply Chain  Plants  Warehouses  Distribution centers  Service centers  Retail operations.
Supply Chain Management Professor Stephen R. Lawrence Leeds School of Business University of Colorado Boulder, CO
Supply Chain Management
Managing Goods Chapter 16. FactoryWholesalerDistributorRetailerCustomer Replenishment order Replenishment order Replenishment order Customer order Production.
Supply Chain Management Professor Stephen R. Lawrence Leeds School of Business University of Colorado Boulder, CO
LOG 408: Global Logistics Management Lecture 10: Cases on Supply Chain Operation.
RESOURCE PLANNING SYSTEMS
1 Supply Chain Decision Support Systems ISyE3103.
Reasons for Inventory To create a buffer against uncertainties in supply & demand To take advantage of lower purchasing and transportation cost associated.
PHYSICAL DISTRIBUTION. Logistics & Supply Chain Logistics Component parts & Raw material In-process inventory Finished goods Supply Chain.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
OMSAN LOJİSTİK. Information Systems to Inventory Management Inventory Planning and Management Latin America Logistics Center Logistics Management Series.
TRANSPORTATION MANAGEMENT
Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved GLOBAL SOURCING AND PROCUREMENT Chapter 11.
CHAPTER 6 PRODUCT QUANTITY DECISIONS AND STOCK MANAGEMENT.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Learning Objectives Be Able To Apply Concepts Listed In Learning Goals
SUPPLY CHAIN MANAGEMENT. PARTICIPANTS INTRODUCTION SUPPLY CHAIN MANAGEMENT.
Slides 6 Distribution Strategies
Master Production Scheduling Logistics Workshop Asia 2004 Phnom Penh, Cambodia 10 – 14 May 2004.
Supply Chain Doctors The Supply Chain Doctors Supply Chain Management Kimball Bullington, Ph.D.
SUPPLY CHAIN MANAGEMENT. PARTICIPANTS INTRODUCTION SUPPLY CHAIN MANAGEMENT.
Supply Chain Management Location of Inventory General Idea: Store as little inventory as possible while still being responsive to customer. Approaches:
CHAPTER 7 Managing Materials Flow. Copyright © 2001 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin 7-2 Materials Management.
Inventory Management Logistics Workshop Asia 2004 Phnom Penh, Cambodia 10 – 14 May 2004.
Supply Chain Management Refers to all the management functions related to the flow of materials from the company’s direct suppliers to its direct customers.
Distribution Strategies Chap 05 王仁宏 助理教授 國立中正大學企業管理學系 ©Copyright 2001 製商整合科技中心.
The sales order and purchasing processes MIS2101: Management Information Systems Based on material developed by C.J. Marselis.
Supply Chain Management
Supply Chain Management Guide © Imants the. The Supply Chain Management Guide 1. Introduction.
Inventory Management and Risk Pooling (1)
OMSAN LOJİSTİK. Inventory Positioning Inventory Planning and Management Latin America Logistics Center Logistics Management Series -
Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall.1-1 Course Code MGT 561 Supply Chain Management Book: Supply Chain Management Strategy,
Department of Marketing & Decision Sciences Part 5 – Distribution Wholesaling and Physical Distribution.
Slack, Chambers and Johnston, Operations Management 5 th Edition © Nigel Slack, Stuart Chambers, and Robert Johnston 2007 Chapter 12 Inventory planning.
Logistics Management LSM 730 Lecture 8 Dr. Khurrum S. Mughal.
Introduction to Supply Chain Management Designing & Managing the Supply Chain Chapter 1 Byung-Hyun Ha
I2 U Intelligent Supply Chain Management Course Module Twelve: Inventory Deployment.
The Bullwhip Effect1 Slides 3 The Bullwhip Effect Global Supply Chain Management.
Chapter 11 Managing Inventory throughout the Supply Chain
Replenishment in a Distribution Environment
Copyright © 2001 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin 1-1 JAMES R. STOCK  DOUGLAS M. LAMBERT STRATEGIC LOGISTICS MANAGEMENT.
Information flow Diagram. Information Flow The following diagram illustrates the information flow within typical manufacturing and wholesaling organisation.
Famosa S.A. Full Speed Supply Chain Jorge León Bello__Master GEPS.
Distribution Requirements Planning. What is DRP? DRP provides the basis for integrating supply chain inventory information and physical distribution activities.
WAREHOUSING WHY A NEED FOR THE WAREHOUSE? Improved Product availability –Reduced stockouts –Packaging can be broken into tailored assortments Improved.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
CH-8-Resource Planning Assist Prof Banu OZKESER December, 2015.
Agile or lean? “Lean” works best in high volume, low
The Desk Jet Supply Chain
American Lighting Products
Distribution Strategies
Inventory planning and control
Module 2: Supply Chain & Logistics Management
Outline The Role of Distribution in the Supply Chain
Topic 6 – Logistics and Supply Chain Management
Chapter 12 Managing Uncertainty in the Supply Chain: Safety Inventory
Supply Chain Management (SCM) Basics
Supply Chain Management
Sales Order Process.
SCO2 Activation SCO enabling trust through visibility 2.0.
Supply Chain Inventory Management
Business Logistics Management
Presentation transcript:

Distribution Requirements Planning Logistics Workshop Asia 2004 Phnom Penh, Cambodia 10 – 14 May 2004

2 Distribution Requirements Planning What is DRP? DRP is the function of determining the time-phased requirement to replenish inventory at branch warehouses. The sum of the requirements over different Distribution Centres again results in the time-phased requirement at the final supplier.

3 RCCP CRP Forecasting Distribution Requirements Planning Material Requirements Planning Master Production Scheduling Distribution Requirements Planning

4 Brewery Central warehouse Regional warehouse 1 Regional warehouse 2 Forecast / Sales information Inventory flow (delivery) Sales Plan Retail Outlet E Retail Outlet D Retail Outlet C Retail Outlet B Retail Outlet A

5 Distribution requirement planning Brewery Distribution Centres Customers

6 Distribution Requirements Planning Demand DC 1 Planned Available week 1: 6,500 – 2,200 = 4,300 Safety stock should be 1,500, so no order Week Gross requirement2,2002,000 2,1001,8001,9003,300 Planned available6,5004,3001,8003,8001,7003,9002,0002,700 Planned order due4,000 Planned order release4,000 Product:Heineken 60 clLeadtime:2 weeks Safety stock:1,500 Order Quantity4,000

7 Distribution Requirements Planning Demand DC 1 Planned Available week 2: 4,300 – 2,500 = 1,800 Safety stock should be 1,500, so no order Week Gross requirement2,2002,5002,0002,1001,8001,9003,300 Planned available6,5004,3001,8003,8001,7003,9002,0002,700 Planned order due4,000 Planned order release4,000 Product:Heineken 60 clLeadtime:2 weeks Safety stock:1,500 Order Quantity4,000

8 Distribution Requirements Planning Demand DC 1 Planned Available week 3: 1,800 – 2,000 = Safety stock should be 1,500, so minimal order 1,700 Week Gross requirement2,2002,5002,0002,1001,8001,9003,300 Planned available6,5004,3001,8003,8001,7003,9002,0002,700 Planned order due4,000 Planned order release4,000 Product:Heineken 60 clLeadtime:2 weeks Safety stock:1,500 Order Quantity4,000 Order 4000, since order quantity = 4,000 (order release week 1) Planned available = ,000 = 3,800

9 Distribution Requirements Planning Demand DC 1 Planned Available week 4: 3,800 – 2,100 = 1,700 Safety stock should be 1,500, so no order Week Gross requirement2,2002,5002,0002,1001,8001,9003,300 Planned available6,5004,3001,8003,8001,7003,9002,0002,700 Planned order due4,000 Planned order release4,000 Product:Heineken 60 clLeadtime:2 weeks Safety stock:1,500 Order Quantity4,000

10 Distribution Requirements Planning Demand DC 1 Planned Available week 5: 1,700 – 1,800 = Safety stock should be 1,500, so minimal order 1,600 Week Gross requirement2,2002,5002,0002,1001,8001,9003,300 Planned available6,5004,3001,8003,8001,7003,9002,0002,700 Planned order due4,000 Planned order release4,000 Product:Heineken 60 clLeadtime:2 weeks Safety stock:1,500 Order Quantity4,000 Order 4000, since order quantity = 4,000 (order release week 3) Planned available = ,000 = 3,900

11 Distribution requirement planning Brewery Distribution Centres Customers

12 Distribution Requirements Planning Demand DC 2 Planned Available week 1: 3,000 – 700 = 2,300 Safety stock should be 900, so no order Week Gross requirement , Planned available3,0002,3001,4002,1001,2002,3001,4002,300 Planned order due1,800 Planned order release1,800 Product:Heineken 60 clLeadtime:1 week Safety stock:900 Order Quantity1,800

13 Distribution Requirements Planning Demand DC 2 Planned Available week 2: 2,300 – 900 = 1,400 Safety stock should be 900, so no order Week Gross requirement , Planned available3,0002,3001,4002,1001,2002,3001,4002,300 Planned order due1,800 Planned order release1,800 Product:Heineken 60 clLeadtime:1 week Safety stock:900 Order Quantity1,800

14 Distribution Requirements Planning Demand DC 2 Planned Available week 3: 1,400 – 1,100 = 300 Safety stock should be 900, so minimal order 600 Week Gross requirement , Planned available3,0002,3001,4002,1001,2002,3001,4002,300 Planned order due1,800 Planned order release1,800 Product:Heineken 60 clLeadtime:1 week Safety stock:900 Order Quantity1,800 Order 1,800, since order quantity = 1,800 (order release week 2) Planned available = ,800 = 2,100

15 Distribution Requirements Planning Demand DC 2 Planned Available week 4: 2,100 – 900 = 1,200 Safety stock should be 900, so no order Week Gross requirement , Planned available3,0002,3001,4002,1001,2002,3001,4002,300 Planned order due1,800 Planned order release1,800 Product:Heineken 60 clLeadtime:1 week Safety stock:900 Order Quantity1,800

16 Distribution Requirements Planning Demand DC 2 Planned Available week 5: 1,200 – 700 = 500 Safety stock should be 900, so minimal order 400 Week Gross requirement , Planned available3,0002,3001,4002,1001,2002,3001,4002,300 Planned order due1,800 Planned order release1,800 Product:Heineken 60 clLeadtime:1 week Safety stock:900 Order Quantity1,800 Order 1,800, since order quantity = 1,800 (order release week 4) Planned available = ,800 = 2,300

17 Distribution requirement planning Brewery Distribution Centres Customers

18 Distribution Requirements Planning Demand DC 3 Week Gross requirement Planned available2,7002,0001,4001, , ,400 Planned order due1,200 Planned order release1,200 Product:Heineken 60 clLeadtime:1 week Safety stock:600 Order Quantity1,200

19 Distribution Requirements Planning Total Demand Week Requirement DC 14,000 Requirement DC 21,800 Requirement DC 31,200 Gross Requirement4,0003,0004,0003,0004,0003,000

20 Distribution Requirements Planning Characteristics : Great emphasis on the assets in sourcing and distribution systems, in particular on inventory levels DRP contributes to the reduction of stock costs Reduce inventory levels but more competitive service levels (the costs of stocks represent a significant part of cost price)

21 Distribution Requirements Planning Brewery Central warehouse Regional warehouse 1 Regional warehouse 2 Forecast / Sales information Inventory flow (delivery) Sales Plan Retail Outlet E Retail Outlet D Retail Outlet C Retail Outlet B Retail Outlet A

22 Distribution Requirements Planning DRP I versus Stock Replenishing System (re-order point system) Characteristics of re-order point methods: Using an average demand Determination of re-order time (not when product is needed) No warning for and anticipate for demand fluctuation No integration of stock levels in the chain ( Forester effect)

23 Distribution Requirements Planning

24 Distribution Requirements Planning

25 Distribution Requirements Planning Important characteristics in DRP-I It calculates when present stock and goods in transit are used It generates the moments of receipt It generates the moment of sending the products Receipts will be taken into account for requirements planning (the planning horizon will move on).

26 Distribution Requirements Planning Advantages of DRP Possibility to complete the order with future orders to create full truck loads Orders can be communicated with the supplier in an early stage (improvement of the reliability). Parallel orders, which means peaks in transports can be signalled in an early stage. In case of disturbance, it offers possibilities to create solutions which are optional for the whole chain.

27 Distribution Requirements Planning Advantages of complementation in the USA Improvement of the delivery reliability from 85% to 97% Decrease in inventories with 25% Decrease of the distribution costs with 15% Decrease of absolute stock with 80%

28 Exercise 7